Council planning record

Beech (T1) - Following assessment, recommended works include the removal of deadwood and the removal of one identified crossed limb to improve crown structure and reduce the potential for future abrasion.Additionally, at the client's request, consent is sought to reduce the overall crown by up to 30% to contain the size of the tree within its setting. Works would be undertaken in accordance with BS 3998:2010, retaining a balanced crown form and suitable growth points.

Oldway Oaks Southfield Road Paignton TQ3 2SP

DecidedReference: AT/2026/0064Torbay Council

Last published check: 8 Oct 2026, 12:54. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Application location

Oldway Oaks Southfield Road Paignton TQ3 2SP

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Works To Tree Within TPO
Received
26 Feb 2026
Validated
16 Mar 2026
Determination deadline
Not published
Local authority
Torbay Council

Application overview

Beech (T1) - Following assessment, recommended works include the removal of deadwood and the removal of one identified crossed limb to improve crown structure and reduce the potential for future abrasion.Additionally, at the client's request, consent is sought to reduce the overall crown by up to 30% to contain the size of the tree within its setting. Works would be undertaken in accordance with BS 3998:2010, retaining a balanced crown form and suitable growth points.

Proposal details

Reference
AT/2026/0064
Alternative references
PP-14733584
Ward
Clifton With Maidenway
Agent
Mr Daniel Kenup

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

The document list could not be fully refreshed. View the council record for the complete list.

Document details are unavailable.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Consultation Period To End On

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Refusal
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.