Council planning record

Beech tree: To the rear of Hellinghay House behind garage and store.Any pruning to achieve crown reduction will be carried out as specified by BS3998 and will be as follows:1). Reduce the tree from an existing height of 7.5 metres to a finished height of 6 metres.2). Reduce crown extents from the current 3 metres to approximately 2.25 metres.This applies to the branches at all cardinal points.3). Check for "crossed branches" dead branches, disease and rot.

Hellinghay House Seaway Lane Torquay TQ2 6PW

DecidedReference: AT/2026/0048Torbay Council

Last published check: 8 Oct 2026, 17:03. Check the council record for more recent changes.

We couldn’t update every section. Some information is from an earlier collection.

Application location

Hellinghay House Seaway Lane Torquay TQ2 6PW

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Works To Tree Within CA
Received
6 Feb 2026
Validated
12 Feb 2026
Determination deadline
Not published
Local authority
Torbay Council

Application overview

Beech tree: To the rear of Hellinghay House behind garage and store.Any pruning to achieve crown reduction will be carried out as specified by BS3998 and will be as follows:1). Reduce the tree from an existing height of 7.5 metres to a finished height of 6 metres.2). Reduce crown extents from the current 3 metres to approximately 2.25 metres.This applies to the branches at all cardinal points.3). Check for "crossed branches" dead branches, disease and rot.

Proposal details

Reference
AT/2026/0048
Alternative references
PP-14683823
Ward
Cockington With Chelston

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 0 of 0

The document list could not be fully refreshed. View the council record for the complete list.

Document details are unavailable.

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Consultation Period To End On

    Published milestoneCouncil source
  4. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

No Objections Raised
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.