T1 - Monterey Cypress. Remove major hazardous deadwood T2 - Holm Oak. Reduce height by 4m, maximum diameter of cut (MDC) 75mm. Reduce southern aspect by 3-4m, MDC 1 @ 125mm, remaining at 75mm. Reduce eastern aspect by 3m, MDC 75mm Reason for Works: T1 is clearly in decline and the deadwood needs removing on safety grounds T2 is heavily weighted to the south and is having a significant impact on the property below. Given the tree?s characteristics and the ground conditions, a weight reduction is recommended to reduce leverage, and therefore loadings, on both the tree and at ground level. As Holm Oaks generally tolerate such works well, the specified reduction is expected to have minimal impact on the tree?s physiological process and health overall.
19 Colwyn Court Asheldon Road Torquay TQ1 2QT
Torbay CouncilReference AT/2025/0256Works To Tree Within TPO
T1 - Monterey Cypress. Remove major hazardous deadwood T2 - Holm Oak. Reduce height by 4m, maximum diameter of cut (MDC) 75mm. Reduce southern aspect by 3-4m, MDC 1 @ 125mm, remaining at 75mm. Reduce eastern aspect by 3m, MDC 75mm Reason for Works: T1 is clearly in decline and the deadwood needs removing on safety grounds T2 is heavily weighted to the south and is having a significant impact on the property below. Given the tree?s characteristics and the ground conditions, a weight reduction is recommended to reduce leverage, and therefore loadings, on both the tree and at ground level. As Holm Oaks generally tolerate such works well, the specified reduction is expected to have minimal impact on the tree?s physiological process and health overall.
Reference
AT/2025/0256
Alternative references
PP-14250967
Ward
Wellswood
Agent
Dartmoor Tree Surgeons
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.