Oak (G1) is situated on the bank, just outside the TPO Area. The trees are proposed to undergo a repollarding treatment, with all regrowth removed back to established pollard points using sharp, clean cuts to prevent unnecessary wounding. This work builds upon previous management practices conducted at the same bank, aiming to maintain structural integrity, reduce mechanical stress, and promote healthy regrowth. The tree?s condition will be monitored following the works to assess vigour and response.Given the proximity to pedestrian access and public use areas, this cyclical management is deemed necessary to mitigate potential branch failures and maintain safe clearance. No felling is proposed, and no replanting is required.
The Dell Hesketh Crescent Torquay TQ1 2LJ
Torbay CouncilReference AT/2025/0224Works To Tree Within TPO
Oak (G1) is situated on the bank, just outside the TPO Area. The trees are proposed to undergo a repollarding treatment, with all regrowth removed back to established pollard points using sharp, clean cuts to prevent unnecessary wounding. This work builds upon previous management practices conducted at the same bank, aiming to maintain structural integrity, reduce mechanical stress, and promote healthy regrowth. The tree?s condition will be monitored following the works to assess vigour and response.Given the proximity to pedestrian access and public use areas, this cyclical management is deemed necessary to mitigate potential branch failures and maintain safe clearance. No felling is proposed, and no replanting is required.
Reference
AT/2025/0224
Alternative references
PP-14198627
Ward
Wellswood
Agent
Mr Wojciech Rosinke
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.