Council planning record

Application for the approval of details reserved by condition no. 33 (Drainage Scheme) of the deemed planning permision (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power). Condition previosuly dischared in condition clearnce application 23/00452/CONDC

Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

Awaiting decisionReference: 26/01047/CONDCThurrock Council

Last published check: 12 Oct 2026, 00:34. Check the council record for more recent changes.

Application location

Thameside Energy Recovery Facility Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Condition Clearance
Received
4 Sept 2026
Validated
8 Sept 2026
Determination deadline
3 Nov 2026
Local authority
Thurrock Council

Application overview

Application for the approval of details reserved by condition no. 33 (Drainage Scheme) of the deemed planning permision (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power). Condition previosuly dischared in condition clearnce application 23/00452/CONDC

Proposal details

Reference
26/01047/CONDC
Ward
Tilbury Riverside

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 30 of 30

DocumentPublishedAction
ENVIRONMENT AGENCYConsultee Comment · PDF25 Sept 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF4 Sept 2026View
DRAINAGE DESIGN SUMMARYStudies and Reports · PDF4 Sept 2026View
FIRE FIGHTING RINGCurrent Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 1Current Plan · PDF4 Sept 2026View
COMBINED DRAINAGE LAYOUT (SHEET 2)Current Plan · PDF4 Sept 2026View
GENERAL ARRANGEMENTCurrent Plan · PDF4 Sept 2026View
PROCESS DRAINAGE LAYOUT (OVERALL)Current Plan · PDF4 Sept 2026View
COMBINED DRAINAGE LAYOUT (SHEET 1)Current Plan · PDF4 Sept 2026View
SITE WIDE DRAINAGE LAYOUTCurrent Plan · PDF4 Sept 2026View
OVERALL CONDUIT PLANCurrent Plan · PDF4 Sept 2026View
RAINWATER HARVESTING SYSTEM DESIGN SUMMARYStudies and Reports · PDF4 Sept 2026View
HARDSTANDING CONSTRUCTION DETAILSCurrent Plan · PDF4 Sept 2026View
DRAINAGE DETAILS SHEET 6Current Plan · PDF4 Sept 2026View
HARDSTANDING CONSTRUCTION DETAILS SHEET 2Current Plan · PDF4 Sept 2026View
ATTENUATION POND ARRANGEMENT & DETAILSCurrent Plan · PDF4 Sept 2026View
SITE WIDE DRAINAGE DETAILS SHEET 5Current Plan · PDF4 Sept 2026View
SITE WIDE DRAINAGE DETAILS SHEET 4Current Plan · PDF4 Sept 2026View
SITE WIDE DRAINAGE DETAILS - SHEET 2Current Plan · PDF4 Sept 2026View
SITE WIDE DRAINAGE DETAILS - SHEET 3Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 10Current Plan · PDF4 Sept 2026View
SITE WIDE DRAINAGE DETAILS SHEET 1Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 9Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 8Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 3Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 7Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 5Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 4Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 6Current Plan · PDF4 Sept 2026View
PROCESS DRAINAGE DETAILS SHEET 2Current Plan · PDF4 Sept 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.