Council planning record

Application for the approval of details reserved by condition no. 11 (New Internal Structures) of planning permission ref 24/00476/LBC (Listed building consent for the conversion of nave and south aisle of church to a self-contained dwelling and use of the Chancel & south chapel for purposes (not residential) ancillary to the main dwelling within the church (such as workshop or studio space) with a separate dwelling in the tower, with associated access to the building, internal and external works including new openings in North and South elevations).

St John The Baptist Church Mucking Wharf Road Stanford Le Hope Essex

PermittedReference: 26/00430/CONDCThurrock Council

Application location

St John The Baptist Church Mucking Wharf Road Stanford Le Hope Essex

This record has no verified map location.

View council map

Application summary

Status
Permitted
Application type
Condition Clearance
Received
21 Apr 2026
Validated
21 Apr 2026
Determination deadline
16 Jun 2026
Local authority
Thurrock Council

Application overview

Application for the approval of details reserved by condition no. 11 (New Internal Structures) of planning permission ref 24/00476/LBC (Listed building consent for the conversion of nave and south aisle of church to a self-contained dwelling and use of the Chancel & south chapel for purposes (not residential) ancillary to the main dwelling within the church (such as workshop or studio space) with a separate dwelling in the tower, with associated access to the building, internal and external works including new openings in North and South elevations).

Proposal details

Reference
26/00430/CONDC
Ward
OLD Stanford Le Hope West
Agent
Engineroom

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 23 of 23

DocumentPublishedAction
DECISION NOTICEDecision Notice · PDF18 May 2026View
LISTED BUILDINGS/CONSERVATION.Consultee Comment · PDF15 May 2026View
HISTORIC ENGLANDConsultee Comment · PDF13 May 2026View
2026-02-12 MARKUPCurrent Plan · PDF23 Apr 2026View
STRUCTURAL NOTESCurrent Plan · PDF23 Apr 2026View
FOUNDATION STRUCTURECurrent Plan · PDF23 Apr 2026View
FIRST FLOOR STRUCTURECurrent Plan · PDF23 Apr 2026View
SECOND FLOOR STRUCTURECurrent Plan · PDF23 Apr 2026View
PROPOSED STAIRCASE UNITS 1 AND 2Current Plan · PDF23 Apr 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF21 Apr 2026View
CONDITION 11 FINALStudies and Reports · PDF21 Apr 2026View
2026-02-12 MARKUPStudies and Reports · PDF21 Apr 2026View
STRUCTURAL CALCULATIONStudies and Reports · PDF21 Apr 2026View
NEW FLOOR STRUCTURE REVBStudies and Reports · PDF21 Apr 2026View
STRUCTURAL NOTESSuperseded Plan · PDF21 Apr 2026View
FOUNDATION STRUCTURESuperseded Plan · PDF21 Apr 2026View
FIRST FLOOR STRUCTURESuperseded Plan · PDF21 Apr 2026View
SECOND FLOOR STRUCTURESuperseded Plan · PDF21 Apr 2026View
PROPOSED STAIRCASE UNITS 1 AND 2Studies and Reports · PDF21 Apr 2026View
ST JOHN THE BAPTIST CHURCH - BUILD-UP SCHEDULE 13.04.2026 STAGE 4Studies and Reports · PDF21 Apr 2026View
SECTIONS & DETAILS SHEET 3Current Plan · PDF21 Apr 2026View
SECTIONS & DETAILS SHEET 1Current Plan · PDF21 Apr 2026View
SECTIONS & DETAILS SHEET 2Current Plan · PDF21 Apr 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Approved
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.