ApprovedCouncil status: Permitted

Application for the approval of details reserved by condition no. 21 (Temporary construction lighting) of planning permission ref 23/01502/FUL (Proposed construction a new cable tunnel beneath the River Thames between Tilbury and Gravesend to provide additional transmission capacity. Above-ground infrastructure in the form of a new Cable Sealing End compound and a new head house building along with associated electricity infrastructure, access, parking, boundary treatment and two overhead gantry structures for future overhead lines. Temporary compound for the duration of the project to provide parking, staff welfare facilities, delivery vehicle parking, and equipment and machinery storage, including boundary treatment and lighting.)

Land To The South Of National Grids Electrical Substation For New Cable Tunnel Fort Road Tilbury Essex

Thurrock CouncilReference 25/00824/CONDCCondition Clearance

Last published check: 28 Oct 2026, 06:42. Check the council record for more recent changes.

Status and dates

Last published check: 28 Oct 2026, 06:42 (UK)

  1. DoneReceived7 Jul 2025
  2. DoneValidated10 Jul 2025
  3. ClosedConsultationEnded 7 Aug 2025
  4. Date set by councilTarget decision date4 Sept 2025
  5. DecidedApproved14 Aug 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (5)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Condition Clearance
Ward
OLD Tilbury Riverside And Thurrock Park
Documents
4 published

Proposal

Application for the approval of details reserved by condition no. 21 (Temporary construction lighting) of planning permission ref 23/01502/FUL (Proposed construction a new cable tunnel beneath the River Thames between Tilbury and Gravesend to provide additional transmission capacity. Above-ground infrastructure in the form of a new Cable Sealing End compound and a new head house building along with associated electricity infrastructure, access, parking, boundary treatment and two overhead gantry structures for future overhead lines. Temporary compound for the duration of the project to provide parking, staff welfare facilities, delivery vehicle parking, and equipment and machinery storage, including boundary treatment and lighting.)

Reference
25/00824/CONDC
Ward
OLD Tilbury Riverside And Thurrock Park

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Decision NoticeDecision Notice14 Aug 2025View
  • TC ENVIRONMENTAL HEALTHConsultee Comment6 Aug 2025View
  • APPLICATIONFORMREDACTEDApplication Form7 Jul 2025View
  • CONDITION 21 DISCHARGE COVER LETTER -Studies and Reports7 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
Decision Notice

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.