ApprovedCouncil status: Permitted

Application for the variation of condition no. 5 (Construction hours) of planning permission ref. 23/01502/FUL (Proposed construction a new cable tunnel beneath the River Thames between Tilbury and Gravesend to provide additional transmission capacity. Above-ground infrastructure in the form of a new Cable Sealing End compound and a new head house building along with associated electricity infrastructure, access, parking, boundary treatment and two overhead gantry structures for future overhead lines. Temporary compound for the duration of the project to provide parking, staff welfare facilities, delivery vehicle parking, and equipment and machinery storage, including boundary treatment and lighting.)

Land To The South Of National Grids Electrical Substation For New Cable Tunnel Fort Road Tilbury Essex

Thurrock CouncilReference 25/00719/CVCondition Removal/Variation

Last published check: 25 Oct 2026, 06:29. Check the council record for more recent changes.

Status and dates

Last published check: 25 Oct 2026, 06:29 (UK)

  1. DoneReceived13 Jun 2025
  2. DoneValidated19 Jun 2025
  3. ClosedConsultationEnded 14 Jul 2025
  4. Date set by councilTarget decision date18 Sept 2025
  5. DecidedApproved20 Oct 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Last Advertised In Press Date

    Published milestoneCouncil source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Decision Issued Date

    Published milestoneCouncil source
Application type
Condition Removal/Variation
Ward
OLD Tilbury Riverside And Thurrock Park
Documents
12 published

Proposal

Application for the variation of condition no. 5 (Construction hours) of planning permission ref. 23/01502/FUL (Proposed construction a new cable tunnel beneath the River Thames between Tilbury and Gravesend to provide additional transmission capacity. Above-ground infrastructure in the form of a new Cable Sealing End compound and a new head house building along with associated electricity infrastructure, access, parking, boundary treatment and two overhead gantry structures for future overhead lines. Temporary compound for the duration of the project to provide parking, staff welfare facilities, delivery vehicle parking, and equipment and machinery storage, including boundary treatment and lighting.)

Reference
25/00719/CV
Ward
OLD Tilbury Riverside And Thurrock Park

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • SATELLITE OFFICE CHANGE OF ADDRESSStudies and Reports16 Apr 2026View
  • DECISION NOTICEDecision Notice23 Oct 2025View
  • DECISION NOTICESuperseded21 Oct 2025View
  • DELEGATED REPORTDelegated Report20 Oct 2025View
  • TC LANDSCAPE AND ECOLOGYConsultee Comment16 Sept 2025View
  • ENVIRONMENTAL HEALTHConsultee Comment17 Jul 2025View
  • HIGHWAYSConsultee Comment17 Jul 2025View
  • RESPONSE TO HIGHWAYS COMMENTSStudies and Reports17 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Approved
DECISION NOTICE DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.