Council planning record

Full planning application for the demolition of 1 no. existing dwelling and the residential development of 150 dwellings (Class C3) including affordable housing and associated access, open space, landscaping and infrastructure.

Land Adjacent Chapel Farm And To Rear Of High Road And Baker Street Orsett Essex

RefusedReference: 25/00678/FULThurrock Council

Last published check: 11 Oct 2026, 03:14. Check the council record for more recent changes.

Application location

Land Adjacent Chapel Farm And To Rear Of High Road And Baker Street Orsett Essex

This record has no verified map location.

View council map

Application summary

Status
Refused
Application type
Full Planning Permission Application
Received
5 Jun 2025
Validated
21 Jul 2025
Determination deadline
10 Nov 2025
Local authority
Thurrock Council

Application overview

Full planning application for the demolition of 1 no. existing dwelling and the residential development of 150 dwellings (Class C3) including affordable housing and associated access, open space, landscaping and infrastructure.

Proposal details

Reference
25/00678/FUL
Ward
OLD Orsett
Agent
Pegasus Group

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 211 of 211

DocumentPublishedAction
LA PLANNING PROOFAppeal Docs · PDF2 Oct 2026View
LA URBAN DESIGN PROOFAppeal Docs2 Oct 2026View
LA URBAN DESIGN PROOFAppeal Docs2 Oct 2026View
LA URBAN DESIGN PROOFAppeal Docs · PDF2 Oct 2026View
HISTORIC ENGLANDAppeal Docs · PDF2 Oct 2026View
ARCHAEOLOGYConsultee Comment · PDF15 Sept 2026View
BUILT HERITAGEConsultee Comment · PDF15 Sept 2026View
NEIGHBOUR NOTIFICATION LETTERAppeal Docs · PDF25 Jun 2026View
WARD COUNCILLOR NOTIFICATION LETTERAppeal Docs · PDF17 Jun 2026View
ORIGINAL NEIGHBOUR LETTERAppeal Docs · PDF17 Jun 2026View
NEIGHBOUR NOTIFICATION LETTER,Appeal Docs · PDF17 Jun 2026View
NEIGHBOUR LISTAppeal Docs · PDF17 Jun 2026View
APPEAL DOC - PROCEDUREAppeal Docs · PDF18 May 2026View
DECISION NOTICEDecision Notice · PDF27 Mar 2026View
PUBLISHED REPORT 9TH DEC 2025Committee Report · PDF27 Feb 2026View
SUSTAINABILITY ASSESSMENTStudies and Reports · PDF18 Feb 2026View
S106Studies and Reports4 Dec 2025View
ENVIRONMENTAL HEALTHConsultee Comment · PDF11 Nov 2025View
REPTILE REPORTCurrent Plan · PDF4 Nov 2025View
DOCUMENT REGISTERCurrent Plan · PDF4 Nov 2025View
TC PUBLIC HEALTHConsultee Comment · PDF29 Oct 2025View
LOCAL LEAD FLOOD AUTHORITY 1 OF 2Consultee Comment · PDF27 Oct 2025View
LOCAL LEAD FLOOD AUTHORITY 2 OF 2Consultee Comment · PDF27 Oct 2025View
URBAN DESIGNConsultee Comment · PDF27 Oct 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF2 Oct 2025View
LANDSCAPE AND ECOLOGYConsultee Comment26 Sept 2025View
UPDATED ECOLOGICAL IMPACT ASSESSMENTReport · PDF25 Sept 2025View
WASTE STRATEGY DEPARTMENTConsultee Comment24 Sept 2025View
NHSConsultee Comment · PDF24 Sept 2025View
HOUSING DEVELOPMENTConsultee Comment · PDF19 Sept 2025View
APPLICATION FORMApplication Form · PDF16 Sept 2025View
ANGLIAN WATERConsultee Comment · PDF15 Sept 2025View
TC PUBLIC HEALTHConsultee Comment · PDF12 Sept 2025View
TC ENVIRONMENTAL HEALTHConsultee Comment · PDF10 Sept 2025View
ESSEX COUNTY COUNCIL ARCHAEOLOGICAL SECTION.Consultee Comment · PDF9 Sept 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF8 Sept 2025View
NATIONAL HIGHWAYS RESPONSE TECHNICAL NOTEStudies and Reports · PDF1 Sept 2025View
TC HIGHWAYSConsultee Comment · PDF26 Aug 2025View
NATIONAL HIGHWAYS RESPONSE TECHNICAL NOTEStudies and Reports · PDF18 Aug 2025View
ACCESS PLANSStudies and Reports · PDF18 Aug 2025View
LOCATION PLANCurrent Plan · PDF18 Aug 2025View
DOCUMENT REGISTERStudies and Reports · PDF18 Aug 2025View
ILLUSTRATIVE STREETSCENESCurrent Plan · PDF18 Aug 2025View
LEAP PROPOSALCurrent Plan · PDF18 Aug 2025View
LAP PROPOSALCurrent Plan · PDF18 Aug 2025View
RESPONSE TO LOCAL EDUCATION AUTHORITYCurrent Plan · PDF18 Aug 2025View
IMPLEMENTATION AND MAINTENANCE GUIDELINESStudies and Reports · PDF18 Aug 2025View
HEALTH IMPACT ASSESSMENT REPORTStudies and Reports · PDF18 Aug 2025View
NHSConsultee Comment · PDF15 Aug 2025View
Site NoticeSite Notice15 Aug 2025View
Site NoticeSite Notice15 Aug 2025View
DESIGN AND ACCESS STATEMENTStudies and Reports · PDF13 Aug 2025View
R002V1 EC - ECONOMIC BENEFITS STATEMENT WITH INFOGRAPHIStudies and Reports · PDF13 Aug 2025View
794-PLN-TRP-00217-02 TRANSPORT ASSESSMENT_PART1Studies and Reports · PDF13 Aug 2025View
794-PLN-TRP-00217-02 TRANSPORT ASSESSMENT_PART2Studies and Reports · PDF13 Aug 2025View
794-PLN-TRP-00217-02 TRANSPORT ASSESSMENT_PART2Studies and Reports · PDF13 Aug 2025View
794-PLN-TRP-00217-02 TRANSPORT ASSESSMENT_PART4Studies and Reports · PDF13 Aug 2025View
794-PLN-TRP-00217-03 TRAVEL PLANStudies and Reports · PDF13 Aug 2025View
794-PLN-TRP-00217-06 NATIONAL HIGHWAYS RESPONSE TECHNICAL NOTEStudies and Reports · PDF13 Aug 2025View
BAKER STEET ORSETT FRA_2025 V6_APPENDIX A-CStudies and Reports · PDF13 Aug 2025View
BAKER STEET ORSETT FRA_2025 V6_APPENDIX D-FStudies and Reports · PDF13 Aug 2025View
BAKER STEET ORSETT FRA_2025 V6_APPENDIX G-JStudies and Reports · PDF13 Aug 2025View
BAKER STEET ORSETT FRA_2025 V6_ISSUEStudies and Reports · PDF13 Aug 2025View
BAKER STREET BNG METRIC STATUTORY JUL_25Other13 Aug 2025View
BAKER STREET ORSETT_ECOLOGICAL IMPACT ASSESSMENT_JULY 2025_REVC_ISSUED.Studies and Reports · PDF13 Aug 2025View
BIODIVERSITY GAIN PLAN_BAKER STREET ORSETT.REVB.FINAL.ISSUEDStudies and Reports · PDF13 Aug 2025View
P25-0135_R003V3 EN LVIA_FINAL REV A_FIGS 02_2025-07-15Other · PDF13 Aug 2025View
P25-0135_R003V3 EN LVIA_FINAL REV A_FIGS 01_2025-07-15Other · PDF13 Aug 2025View
P25-0135_R003V3 EN LVIA_FINAL REV A+APP_2025-07-15Other · PDF13 Aug 2025View
R10949-1 REV 2 LAND AT BAKER STREET, ORSETT - NOISE ASSESSMENT.Studies and Reports · PDF13 Aug 2025View
LTS043 - 03. BAKER STREET, ORSETT - LIGHTING STRATEGY AND CONSIDERATIONS R1Studies and Reports · PDF13 Aug 2025View
LTS043 - 04. BAKER STREET, ORSETT - LIGHTING - DESIGN LAYOUT - R1Studies and Reports · PDF13 Aug 2025View
BAKER STREET, ORSETT ENERGY AND SUSTAINABILITY STATEMENT 15.07.25Studies and Reports · PDF13 Aug 2025View
P25-0135 - LE OF BAKER STREET ORSETT - COVER LETTER - FINALCover Letter · PDF13 Aug 2025View
P25_0135_NTS_170725Studies and Reports · PDF13 Aug 2025View
P25-0135_00_CONTENTS_FINALStudies and Reports · PDF13 Aug 2025View
P25-0135_01_INTRO_FINALOther · PDF13 Aug 2025View
P25-0135_02_ASM_FINALStudies and Reports · PDF13 Aug 2025View
P25-0135_03_APPSITE_FINALStudies and Reports · PDF13 Aug 2025View
P25-0135_04_PRODEV_REVC.Studies and Reports · PDF13 Aug 2025View
P25-0135_05_HERITAGE_ES-RPSARCHAEOLOGY V5_FINALStudies and Reports · PDF13 Aug 2025View
P25-0135_06_SUMMARYStudies and Reports · PDF13 Aug 2025View
P25-0135_07_GLOSSARYStudies and Reports · PDF13 Aug 2025View
P25-0135_08_REFERENCESStudies and Reports · PDF13 Aug 2025View
FIG_4.1_P25-0135_DE_003_M_01 - SITE LAYOUTCurrent Plan · PDF13 Aug 2025View
BUILDING HEIGHTS PLANCurrent Plan · PDF13 Aug 2025View
FIGS 5.1-5.5-ORSETT ESOther · PDF13 Aug 2025View
FIGURE 1.1 SITE CONTEXTOther · PDF13 Aug 2025View
SITE LOCATION PLANCurrent Plan · PDF13 Aug 2025View
PROPOSED ACCESSCurrent Plan · PDF13 Aug 2025View
BAKER ST TRAFFIC CALMINGCurrent Plan · PDF13 Aug 2025View
PROPOSED PED CROSSINGCurrent Plan · PDF13 Aug 2025View
PROPOSED PED CROSSINCurrent Plan · PDF13 Aug 2025View
APP 1.2_THURROCK GAZETTE PUBLIC NOTICE JULY 2025Other · PDF13 Aug 2025View
PHOTOPhoto13 Aug 2025View
PHOTOPhoto13 Aug 2025View
PHOTOPhoto13 Aug 2025View
PHOTOPhoto13 Aug 2025View
PHOTOPhoto13 Aug 2025View
PHOTOPhoto13 Aug 2025View
25_00226_SCR-ESSEX_POLICE-1102374.Consultee Comment · PDF13 Aug 2025View
25_00226_SCR-HISTORIC_ENGLAND-1115348Consultee Comment · PDF13 Aug 2025View
25_00226_SCR-LISTED_BUILDINGS_CONSERVATION-1115822Other · PDF13 Aug 2025View
25_00226_SCR-NATURAL_ENGLANDS-1114823Other · PDF13 Aug 2025View
ARCHAEOLOGICAL_SECTION_ESSEX_COUNTY_COUNCIL-1120309Other · PDF13 Aug 2025View
OFFICER_RESPONSE-1120782Other · PDF13 Aug 2025View
APP 1.1_COMPETENCY_STATEMENTStudies and Reports · PDF13 Aug 2025View
APP 2.4 EIA SCREENING CONSULTATION RESPONSE_SES_ISSUED.Studies and Reports · PDF13 Aug 2025View
APP 4.2_PROPOSED DRAINAGE & FFL_FINALOther · PDF13 Aug 2025View
APP 5.4 BAKERST-ARCHAEOLOGYSETTINGASSESSMENT-16JULY25.Studies and Reports · PDF13 Aug 2025View
APP5.1 00316 ORSETT DBA-JAN24RStudies and Reports · PDF13 Aug 2025View
APP5.2 04.24 GEOPHYSICAL SURVEY, ORSETTStudies and Reports · PDF13 Aug 2025View
APP5.3 04.24 ARCHAEOLOGICAL EVALUATION, BAKER STREET, ORSETTStudies and Reports · PDF13 Aug 2025View
APPENDIX 2.1 SCR-EIA_SCREENING_REPORT.-1093475Studies and Reports · PDF13 Aug 2025View
APPENDIX 2.3 TOPICS SCOPED OUTStudies and Reports · PDF13 Aug 2025View
P25-0135 - BAKER STREET ORSETT - DOCUMENT REGISTER - 21.07.25Other · PDF13 Aug 2025View
AFFORDABLE HOUSING PLAN.Current Plan · PDF13 Aug 2025View
KEY FRONTAGES PLANCurrent Plan · PDF13 Aug 2025View
PUBLIC OPEN SPACE PROVISIONCurrent Plan · PDF13 Aug 2025View
CHARACTER AREAS PLAN (CA3).Current Plan · PDF13 Aug 2025View
CHARACTER AREAS PLAN (CA2Current Plan · PDF13 Aug 2025View
CHARACTER AREAS PLAN (CA1)Current Plan · PDF13 Aug 2025View
CHARACTER AREAS PLAN (CA1)Current Plan · PDF13 Aug 2025View
STREET HIERARCHY PLANCurrent Plan · PDF13 Aug 2025View
MATERIALS PLANCurrent Plan · PDF13 Aug 2025View
PARKING STRATEGY PLANCurrent Plan · PDF13 Aug 2025View
- BUILDING HEIGHTS PLANCurrent Plan · PDF13 Aug 2025View
REFUSE STRATEGY PLANCurrent Plan · PDF13 Aug 2025View
BOUNDARY TREATMENTS PLANCurrent Plan · PDF13 Aug 2025View
SEPARATION DISTANCESCurrent Plan · PDF13 Aug 2025View
GARDEN COMPLIANCECurrent Plan · PDF13 Aug 2025View
AIA BAKER STREET ORSETT 16.07.25Studies and Reports · PDF13 Aug 2025View
BHA BAKER STREETStudies and Reports · PDF13 Aug 2025View
SITE LAYOUTStudies and Reports · PDF13 Aug 2025View
ILLUSTRATIVE LANDSCAPE MASTERPLANStudies and Reports · PDF13 Aug 2025View
DETAILED SOFT LANDSCAPE PROPOSALSOther · PDF13 Aug 2025View
127 HIGH ROAD ORSETT ESSEX RM16 3LDNeighbour Comment · PDF31 Jul 2025View
ENVIRONMENTAL HEALTHConsultee Comment · PDF21 Jul 2025View
ESSEX COUNTY COUNCIL ARCHAEOLOGICAL SECTIONConsultee Comment · PDF17 Jul 2025View
17 BAKER STREET ORSETT ESSEX RM16 3LJNeighbour Comment · PDF17 Jul 2025View
9 BAKER STREET ORSETT ESSEX RM16 3LJNeighbour Comment · PDF17 Jul 2025View
161 HIGH ROAD ORSETT ESSEX RM16 3LDNeighbour Comment · PDF17 Jul 2025View
159 HIGH ROAD ORSETT ESSEX RM16 3LDNeighbour Comment · PDF17 Jul 2025View
8 BAKER STREET ORSETT ESSEX RM16 3LJNeighbour Comment · PDF17 Jul 2025View
163 HIGH ROAD ORSETT ESSEX RM16 3LDNeighbour Comment · PDF17 Jul 2025View
NATURAL ENGLAND 1 OF 2Consultee Comment · PDF16 Jul 2025View
NATURAL ENGLAND 2 OF 2Consultee Comment · PDF16 Jul 2025View
ANGLIAN WATERConsultee Comment · PDF15 Jul 2025View
NATIONAL HIGHWAYSConsultee Comment · PDF14 Jul 2025View
LISTED BUILDINGS/CONSERVATIONConsultee Comment · PDF14 Jul 2025View
PUBLIC FOOTPATHSConsultee Comment14 Jul 2025View
117 HIGH ROAD ORSETT ESSEX RM16 3LDNeighbour Comment · PDF10 Jul 2025View
142 HIGH ROAD ORSETT ESSEX RM16 3LHNeighbour Comment · PDF10 Jul 2025View
WICKHAM LODGE PRINCE CHARLES AVENUE ORSETT RM16 3HSNeighbour Comment · PDF10 Jul 2025View
119 HIGH ROAD ORSETT ESSEX RM16 3LDNeighbour Comment · PDF10 Jul 2025View
HIGH ROAD ORSETT ESSEX RM16 3LDNeighbour Comment · PDF10 Jul 2025View
WICKHAM LODGE PRINCE CHARLES AVENUE ORSETT ESSEX RM16 3HSNeighbour Comment · PDF10 Jul 2025View
WICKHAM LODGE PRINCE CHARLES AVENUE ORSETT ESSEX RM16 3HSNeighbour Comment · PDF10 Jul 2025View
TC EDUCATIONConsultee Comment7 Jul 2025View
13 PARKWAYNeighbour Comment · PDF7 Jul 2025View
ESSEX POLICEConsultee Comment · PDF3 Jul 2025View
145 HIGH ROADNeighbour Comment · PDF2 Jul 2025View
145 HIGH ROADNeighbour Comment · PDF2 Jul 2025View
22 BUTTERY WELL ROAD KENDAL LA9Neighbour Comment · PDF25 Jun 2025View
LIGHTING DESIGN LAYOUTCurrent Plan · PDF5 Jun 2025View
PROPOSED BUILDOUT PLANCurrent Plan · PDF5 Jun 2025View
PROPOSED UNCONTROLLED CROSSING PLANCurrent Plan · PDF5 Jun 2025View
PROPOSED SPEED CUSHIONSCurrent Plan · PDF5 Jun 2025View
PROPOSED SITE ACCESSCurrent Plan · PDF5 Jun 2025View
HOUSETYPE REPORTStudies and Reports · PDF5 Jun 2025View
MATERIALS PLANCurrent Plan · PDF5 Jun 2025View
PARKING STRATEGY PLANCurrent Plan · PDF5 Jun 2025View
BUILDING HEIGHTS PLANCurrent Plan · PDF5 Jun 2025View
REFUSE STRATEGY PLANCurrent Plan · PDF5 Jun 2025View
BOUNDARY TREATMENTS PLANCurrent Plan · PDF5 Jun 2025View
SEPARATION DISTANCESCurrent Plan · PDF5 Jun 2025View
GARDEN COMPLIANCE PLANCurrent Plan · PDF5 Jun 2025View
LOCATION PLANCurrent Plan · PDF5 Jun 2025View
ENERGY AND SUSTAINABILITY STATEMENTStudies and Reports · PDF5 Jun 2025View
LIGHTING RISK ASSESSMENTStudies and Reports · PDF5 Jun 2025View
LIGHTING CALCULATIONSStudies and Reports · PDF5 Jun 2025View
LIGHTING STRATEGY AND CONSIDERATIONSStudies and Reports · PDF5 Jun 2025View
ORDNANCE SURVEY PLAN / ORDNANCE SURVEY PLAN MINING AND GROUND STABILITY DATASHEEStudies and Reports · PDF5 Jun 2025View
PUBLISHED SOURCE MAPSStudies and Reports · PDF5 Jun 2025View
GEOLOGY REPORTSStudies and Reports · PDF5 Jun 2025View
LANDMARK ENVIROCHECK REPORTStudies and Reports · PDF5 Jun 2025View
GEOENVIRONMENTAL ASSESSMENTStudies and Reports · PDF5 Jun 2025View
AIR QUALITY ASSESSMENTStudies and Reports · PDF5 Jun 2025View
COVER LETTERCover Letter · PDF5 Jun 2025View
ARCHAEOLOGICAL EVALUATIONStudies and Reports · PDF5 Jun 2025View
ARCHAEOLOGICAL ASSESSMENTStudies and Reports · PDF5 Jun 2025View
BUILT HERITAGE STATEMENTStudies and Reports · PDF5 Jun 2025View
ARBORICULTURAL IMPACT ASSESSMENTStudies and Reports · PDF5 Jun 2025View
BNG METRIC STATUTORY FINAL ISSUEDStudies and Reports5 Jun 2025View
BIODIVERSITY GAIN PLANStudies and Reports · PDF5 Jun 2025View
ECOLOGICAL IMPACT ASSESSMENTStudies and Reports · PDF5 Jun 2025View
UTILITY STATEMENT PART 2Studies and Reports · PDF5 Jun 2025View
UTILITY STATEMENT PART 1Studies and Reports · PDF5 Jun 2025View
GEMCO INFILTRATION TESTSStudies and Reports · PDF5 Jun 2025View
TOPOGRAPHIC SURVEYStudies and Reports · PDF5 Jun 2025View
FLOOD RISK ASSESSMENT AND CONCEPTUAL DRANAGE STRATEGYStudies and Reports · PDF5 Jun 2025View
TRAVEL PLANStudies and Reports · PDF5 Jun 2025View
TRANSPORT ASSESSMENT 4 OF 4Studies and Reports · PDF5 Jun 2025View
TRANSPORT ASSESSMENT 3 OF 4Studies and Reports · PDF5 Jun 2025View
TRANSPORT ASSESSMENT 2 OF 4Studies and Reports · PDF5 Jun 2025View
TRANSPORT ASSESSMENT 1 OF 4Studies and Reports · PDF5 Jun 2025View
DESIGN AND ACCESS STATEMENTStudies and Reports · PDF5 Jun 2025View
STATEMENT OF COMMUNITY INVOLVEMENTStudies and Reports · PDF5 Jun 2025View
PLANNING AND AFFORDABLE HOUSING STATEMENTStudies and Reports · PDF5 Jun 2025View
COVER LETTERCover Letter · PDF5 Jun 2025View
DOCUMENT REGISTERStudies and Reports · PDF5 Jun 2025View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Actual Committee Date

    Published milestoneCouncil source
  10. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Permission Refused

Appeal status: Unknown

DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.