Hybrid planning application for the comprehensive redevelopment of the Site to deliver a data centre campus comprising: 1. Full planning application for the demolition of existing buildings and structures, preparatory earthworks including remediation and levelling, and access works; and 2. Outline planning application (with all matters reserved except access) for the construction of up to four data centre buildings (Use Class B8) with a total gross external area (GEA) of up to 130,500 sqm (excluding external plant) and a separate office building of up to 4,000 sqm (GEA), together with ancillary equipment and associated works including security fencing, entrance and service yards, external plant, utility infrastructure (including sub-stations and emergency back-up power generators), energy storage (fuel tanks and/or battery storage), electric vehicle charging stations, internal road networks, car parking for up to 450 vehicles, cycle spaces, hard and soft landscaping, and habitat creation and open space enhancements including the provision of a mountain bike track, pedestrian and cycle linkages to the Mar Dyke Local Wildlife Site and Lakeside, as well as associated access and public realm works.
Arena Essex And Fishing Lake Arterial Road Purfleet-on-thames Essex
Hybrid planning application for the comprehensive redevelopment of the Site to deliver a data centre campus comprising: 1. Full planning application for the demolition of existing buildings and structures, preparatory earthworks including remediation and levelling, and access works; and 2. Outline planning application (with all matters reserved except access) for the construction of up to four data centre buildings (Use Class B8) with a total gross external area (GEA) of up to 130,500 sqm (excluding external plant) and a separate office building of up to 4,000 sqm (GEA), together with ancillary equipment and associated works including security fencing, entrance and service yards, external plant, utility infrastructure (including sub-stations and emergency back-up power generators), energy storage (fuel tanks and/or battery storage), electric vehicle charging stations, internal road networks, car parking for up to 450 vehicles, cycle spaces, hard and soft landscaping, and habitat creation and open space enhancements including the provision of a mountain bike track, pedestrian and cycle linkages to the Mar Dyke Local Wildlife Site and Lakeside, as well as associated access and public realm works.
Reference
25/00573/OUT
Ward
OLD West Thurrock And South Stifford
Agent
Mallory Land Ltd
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.