Council planning record

Application for approval of the following reserved matters: Appearance, Landscaping, Layout and Scale pursuant to grant of outline permission 19/01058/OUT for construction of up to 161 new dwellings (C3) with vehicular access from Churchill Road; construction of 7,650 sq.m (GEA) of flexible employment floorspace (Use Class B1c / B2 / B8) with vehicular access from Thurrock Park Way; provision of open space including landscaping and drainage measures; new pedestrian / cycle links; and associated parking and access.

Land Part Of Little Thurrock Marshes Thurrock Park Way Tilbury Essex

Awaiting decisionReference: 24/00877/REMThurrock Council

Application location

Land Part Of Little Thurrock Marshes Thurrock Park Way Tilbury Essex

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Reserved Matters Application
Received
19 Aug 2024
Validated
19 Aug 2024
Determination deadline
18 Nov 2024
Local authority
Thurrock Council

Application overview

Application for approval of the following reserved matters: Appearance, Landscaping, Layout and Scale pursuant to grant of outline permission 19/01058/OUT for construction of up to 161 new dwellings (C3) with vehicular access from Churchill Road; construction of 7,650 sq.m (GEA) of flexible employment floorspace (Use Class B1c / B2 / B8) with vehicular access from Thurrock Park Way; provision of open space including landscaping and drainage measures; new pedestrian / cycle links; and associated parking and access.

Proposal details

Reference
24/00877/REM
Ward
OLD Tilbury Riverside And Thurrock Park
Agent
Grade Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 328 of 328

DocumentPublishedAction
REVISED LANDSCAPE STRATEGYStudies and Reports · PDF24 Sept 2026View
TECHNICAL DETAILSStudies and Reports · PDF24 Sept 2026View
TECHNICAL DETAILSStudies and Reports · PDF24 Sept 2026View
REVISED DRAWING SCHEDULERevised Drawing · PDF24 Sept 2026View
REVISED DRAINAGE DETAILSRevised Drawing · PDF24 Sept 2026View
REVISED DRAINAGE DETAILSRevised Drawing · PDF24 Sept 2026View
REVISED DRAINAGE DETAILSRevised Drawing · PDF24 Sept 2026View
REVISED DRAINAGE DETAILSRevised Drawing · PDF24 Sept 2026View
REVISED DRAINAGE DETAILSRevised Drawing · PDF24 Sept 2026View
REVISED DRAINAGE DETAILSRevised Drawing · PDF24 Sept 2026View
REVISED LANDSCAPE PLANRevised Drawing · PDF24 Sept 2026View
HARD LANDSCAPINGRevised Drawing · PDF24 Sept 2026View
SOFT LANDSCAPING SCHEDULERevised Drawing · PDF24 Sept 2026View
SOFT LANDSCAPING SCHEDULERevised Drawing · PDF24 Sept 2026View
REFUSE, ASH LOCATIONSRevised Drawing · PDF24 Sept 2026View
SUSTAINABILITY STATEMENTStudies and Reports · PDF24 Sept 2026View
ENVIRONMENTAL PROTECTIONConsultee Comment · PDF3 Sept 2026View
URBAN DESIGNConsultee Comment · PDF12 Aug 2026View
H3CCurrent Plan · PDF28 May 2026View
LLFAConsultee Comment · PDF28 May 2026View
CRANKED GATING PLANCurrent Plan · PDF28 May 2026View
CC1442 THURROCK LLFA RESPONSE 260123 (HIGHLIGHTED).Other · PDF28 May 2026View
PROPOSED DRAINAGE LAYOUTCurrent Plan · PDF24 Feb 2026View
PROPOSED DRAINAGE LAYOUT (SHEET 1)Current Plan · PDF24 Feb 2026View
PROPOSED DRAINAGE LAYOUT (SHEET 2)Current Plan · PDF24 Feb 2026View
PROPOSED DRAINAGE LAYOUT (SHEET 3)Current Plan · PDF24 Feb 2026View
PROPOSED DRAINAGE SECTIONS (SHEET 2 OF 4)Current Plan · PDF24 Feb 2026View
PROPOSED DRAINAGE SECTIONS (SHEET 3 OF 4)Current Plan · PDF24 Feb 2026View
PROPOSED DRAINAGE SECTIONS (SHEET 4 OF 4)Current Plan · PDF24 Feb 2026View
PROPOSED MANHOLE SCHEDULES (SHEET 2).Current Plan · PDF24 Feb 2026View
PROPOSED MANHOLE SCHEDULES (SHEET 3)Current Plan · PDF24 Feb 2026View
PROPOSED MANHOLE SCHEDULES (SHEET 4)Current Plan · PDF24 Feb 2026View
DRAWING SCHEDULEStudies and Reports · PDF24 Feb 2026View
ANGLIAN WATERConsultee Comment · PDF17 Mar 2025View
2410-GUA-XX-XX-DR-L-1027-P06 BOUNDARY TREATMENT PLAN .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1026-P05 DETAILED SOFT LANDSCAPING SCHEDULE .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1025-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 14Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1024-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 13Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1023-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 12 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1022-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 11 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1021-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 10Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1020-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 9Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1019-P04 DETAILED SOFT LANDSCAPE PROPOSALS - PART 8 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1018-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 7 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1017-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 6 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1016-P04 DETAILED SOFT LANDSCAPE PROPOSALS - PART 5Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1015-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 4 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1014-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 3 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1013-P04 DETAILED SOFT LANDSCAPE PROPOSALS - PART 2Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1012-P03 DETAILED SOFT LANDSCAPE PROPOSALS - PART 1 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1011-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 11Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1010-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 10 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1009-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 9 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1008-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 8Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1007-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 7Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1006-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 6 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1005-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 5 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1004-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 4Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1003-P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 3 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1002-P06 DETAILED HARD LANDSCAPE PROPOSALS - PART 2 .Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1001- P05 DETAILED HARD LANDSCAPE PROPOSALS - PART 1Current Plan · PDF13 Mar 2025View
2410-GUA-XX-XX-DR-L-1000-P06 LANDSCAPE LOCATION PLANCurrent Plan · PDF13 Mar 2025View
721_(20)_321_P4_INDUSTRIAL BUILDING NORTH AND EAST ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_320_P3_INDUSTRIAL BUILDING SOUTH AND WEST ELEVATIONSCurrent Plan · PDF13 Mar 2025View
721_(20)_290_P3 HOUSE TYPE G ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_280_P3 HOUSE TYPE F ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_270_P3 HOUSE TYPE E ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_260_P3 HOUSE TYPE D1 ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_250_P3 HOUSE TYPE D ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_240_P3 HOUSE TYPE C ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_230_P3 HOUSE TYPE B ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_220_P3 HOUSE TYPE A ELEVATIONS.Current Plan · PDF13 Mar 2025View
721_(20)_213_P2 FLAT BLOCKS COURTYARD ELEVATIONS SHEET 2.Current Plan · PDF13 Mar 2025View
721_(20)_212_P2 FLAT BLOCKS COURTYARD ELEVATIONS SHEET 1.Current Plan · PDF13 Mar 2025View
721_(20)_211_P4 FLAT BLOCKS ELEVATIONS SHEET 2.Current Plan · PDF13 Mar 2025View
721_(20)_210_P4 FLAT BLOCKS ELEVATIONS SHEET 1.Current Plan · PDF13 Mar 2025View
721_(20)_201_P1_SITE SECTIONS SHEET 2.Current Plan · PDF13 Mar 2025View
721_(20)_200_P3_SITE SECTIONS SHEET 1.Current Plan · PDF13 Mar 2025View
721_(20)_190_P3 HOUSE TYPE G FLOOR PLANS AND ROOF PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_180_P3 HOUSE TYPE F FLOOR PLANS AND ROOF PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_170_P3 HOUSE TYPE E GROUND AND FIRST FLOOR PLANS.Current Plan · PDF13 Mar 2025View
721_(20)_160_P2 HOUSE TYPE D1 FLOOR PLANS.Current Plan · PDF13 Mar 2025View
721_(20)_150_P3 HOUSE TYPE D FLOOR PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_140_P3 HOUSE TYPE C FLOOR PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_130_P3 HOUSE TYPE B FLOOR PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_120_P3 HOUSE TYPE A FLOOR PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_113_P3 FLAT BLOCKS THIRD FLOOR GA PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_112_P3 FLAT BLOCKS SECOND FLOOR GA PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_111_P3 FLAT BLOCKS FIRST FLOOR GA PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_110_P4 FLAT BLOCKS GROUND FLOOR GA PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_107_P02_PROPOSED TOPOGRAPHICAL SITE PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_103_P03_GARDEN AREA PLAN.Current Plan · PDF13 Mar 2025View
721_(20)_102_P03_REFUSE AND CYCLE PLANCurrent Plan · PDF13 Mar 2025View
721_(20)_100_P12_PROPOSED SITE PLANCurrent Plan · PDF13 Mar 2025View
721_(00)_107_P01_EXISTING TOPOGRAPHICAL SITE PLANCurrent Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0803 P2 ACCESS ROADS VERTICAL ALIGNMENT SHEET3.Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0802 P2 ACCESS ROADS VERTICAL ALIGNMENT SHEET2Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0801 P2 ACCESS ROADS VERTICAL ALIGNMENT SHEET1.Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0722 P2 ROAD MARKINGS AND SIGNAGE (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0721 P2 ROAD MARKINGS AND SIGNAGE (SHEET 1).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0720 P1 ROAD MARKINGS AND SIGNAGE OVERALL PLAN.Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0717 P2 EMERGENCY ACCESS LINK.Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0716 P4 ACCESS ROADS KERBS AND SURFACING (SHEET 6).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0715 P4 ACCESS ROADS KERBS AND SURFACING (SHEET 5).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0714 P4 ACCESS ROADS KERBS AND SURFACING (SHEET 4).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0713 P4 ACCESS ROADS KERBS AND SURFACING (SHEET 3)Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0712 P4 ACCESS ROADS KERBS AND SURFACING (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0711 P4 ACCESS ROADS KERBS AND SURFACING (SHEET 1).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0710 P2 ACCESS ROADS KERBS AND SURFACING OVERALL PLAN.Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0706 P5 ACCESS ROADS LAYOUT (SHEET 6).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0705 P5 ACCESS ROADS LAYOUT (SHEET 5).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0704 P5 ACCESS ROADS LAYOUT (SHEET 4).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0703 P5 ACCESS ROADS LAYOUT (SHEET 3).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0702 P5 ACCESS ROADS LAYOUT (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0701 P5 ACCESS ROADS LAYOUT (SHEET 1).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0700 P5 ACCESS ROADS LAYOUT (OVERALL).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0128 P3 FIRE TENDER TRACKING (SHEET 4).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0127 P3 FIRE TENDER TRACKING (SHEET 3).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0126 P3 FIRE TENDER TRACKING (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0125 P3 FIRE TENDER TRACKING (SHEET 1).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0124 P3 MAX LEGAL ARTIC VEHICLE TRACKING.Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0123 P3 REFUSE VEHICLE TRACKING (SHEET 3).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0122 P3 REFUSE VEHICLE TRACKING (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442-CAM ZZ XX DR C 0121 P3 REFUSE VEHICLE TRACKING (SHEET 1).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 1195 P02 HIGHWAY CONSTRUCTION DETAILS (SHEET 6).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 1194 P02 HIGHWAY CONSTRUCTION DETAILS (SHEET 5).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 1193 P02 HIGHWAY CONSTRUCTION DETAILS (SHEET 4).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 1192 P02 HIGHWAY CONSTRUCTION DETAILS (SHEET 3).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 1191 P02 HIGHWAY CONSTRUCTION DETAILS (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 1190 P02 HIGHWAY CONSTRUCTION DETAILS (SHEET 1).Current Plan · PDF13 Mar 2025View
CC1442-CAM-ZZ-XX-DR-C-504 P03 PROPOSED DRAINAGE LAYOUT (SHEET 4).Current Plan · PDF13 Mar 2025View
CC1442-CAM-ZZ-XX-DR-C-503 P03 DRAINAGE LAYOUT (SHEET 3).Current Plan · PDF13 Mar 2025View
CC1442-CAM-ZZ-XX-DR-C-502 P03 DRAINAGE LAYOUT (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442-CAM-ZZ-XX-DR-C-501 P03 DRAINAGE LAYOUT (SHEET 1)Current Plan · PDF13 Mar 2025View
CC1442-CAM-ZZ-XX-DR-C-500 P03 DRAINAGE LAYOUT (OVERALL)Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 540 P01 SURFACE WATER FLOOD RISK MAP OVERLAY 2040-2060.Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 522 P02 PROPOSED MANHOLE SCHEDULES (SHEET 3).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 521 P02 PROPOSED MANHOLE SCHEDULES (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 511 P02 PROPOSED DRAINAGE SECTIONS (SHEET 2).Current Plan · PDF13 Mar 2025View
CC1442 CAM ZZ XX DR C 1203 P02 DRAINAGE CONSTRUCTION DETAILS SHEET 4.Current Plan · PDF13 Mar 2025View
24-00891-CONDC_RESPONSE_061124 - CAMBRIA RESPONSE 250224.Studies and Reports · PDF13 Mar 2025View
TRANSPORT NOTE FEBRUARY 2025.Studies and Reports · PDF13 Mar 2025View
SUSTAINABLE DESIGN AND CONSTRUCTION STATEMENT FEBRUARY 2025.Studies and Reports · PDF13 Mar 2025View
ROAD SAFETY AUDIT 1 & 2 AUGUST 2024.Studies and Reports · PDF13 Mar 2025View
ENVIRONMENTAL NOISE ASSESSMENT FEBRUARY 2025.Studies and Reports · PDF13 Mar 2025View
DESIGNERS RESPONSE TO STAGE 1 AND 2 RSA.Studies and Reports · PDF13 Mar 2025View
DESIGN AND ACCESS STATEMENT ADDENDUM.Studies and Reports · PDF13 Mar 2025View
DAYLIGHT SUNLIGHT STUDY JANUARY 2025.Studies and Reports · PDF13 Mar 2025View
COVER LETTERCover Letter · PDF13 Mar 2025View
URBAN DESIGNConsultee Comment · PDF15 Nov 2024View
URBAN DESIGNConsultee Comment14 Nov 2024View
PETITIONNeighbour Comment · PDF7 Nov 2024View
BUGLIFEConsultee Comment · PDF4 Oct 2024View
1/2 6 CHURCHILL ROAD GRAYS ESSEX RM17 6TWNeighbour Comment · PDF4 Oct 2024View
2/2 6 CHURCHILL ROAD GRAYS ESSEX RM17 6TWNeighbour Comment · PDF4 Oct 2024View
ENVIRONMENTAL HEALTHConsultee Comment · PDF1 Oct 2024View
ENVIRONMENT AGENCYConsultee Comment · PDF24 Sept 2024View
ESSEX FIELD CLUBConsultee Comment · PDF23 Sept 2024View
ESSEX CO. FIRE/RESCUE CONSULTATIONConsultee Comment · PDF16 Sept 2024View
ESSEX COUNTY FIRE AND RESCUE SERVICEConsultee Comment · PDF16 Sept 2024View
ESSEX POLICEConsultee Comment · PDF13 Sept 2024View
APPLICATIONFORMREDACTEDApplication Form · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1000-P1-LANDSCAPE LOCATION PLANSuperseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1001-DETAILED HARD LANDSCAPE PROPOSALS - PART 1Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1002-DETAILED HARD LANDSCAPE PROPOSALS - PART 2Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1003-DETAILED HARD LANDSCAPE PROPOSALS - PART 3Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1004-DETAILED HARD LANDSCAPE PROPOSALS - PART 4Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1005-DETAILED HARD LANDSCAPE PROPOSALS - PART 5Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1006-DETAILED HARD LANDSCAPE PROPOSALS - PART 6Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1007-DETAILED HARD LANDSCAPE PROPOSALS - PART 7Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1008-DETAILED HARD LANDSCAPE PROPOSALS - PART 8Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1009-DETAILED HARD LANDSCAPE PROPOSALS - PART 9Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1010-DETAILED HARD LANDSCAPE PROPOSALS - PART 10Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1011-DETAILED HARD LANDSCAPE PROPOSALS - PART 11Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1012-DETAILED SOFT LANDSCAPE PROPOSALS - PART 1Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1013-DETAILED SOFT LANDSCAPE PROPOSALS - PART 2Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1014-DETAILED SOFT LANDSCAPE PROPOSALS - PART 3Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1015-DETAILED SOFT LANDSCAPE PROPOSALS - PART 4Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1016-DETAILED SOFT LANDSCAPE PROPOSALS - PART 5Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1017-DETAILED SOFT LANDSCAPE PROPOSALS - PART 6Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1018-DETAILED SOFT LANDSCAPE PROPOSALS - PART 7Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1019-DETAILED SOFT LANDSCAPE PROPOSALS - PART 8Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1020-DETAILED SOFT LANDSCAPE PROPOSALS - PART 9Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1021-DETAILED SOFT LANDSCAPE PROPOSALS - PART 10Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1022-DETAILED SOFT LANDSCAPE PROPOSALS - PART 11Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1023-DETAILED SOFT LANDSCAPE PROPOSALS - PART 12Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1024-DETAILED SOFT LANDSCAPE PROPOSALS - PART 13Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1025-DETAILED SOFT LANDSCAPE PROPOSALS - PART 14Superseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1026-DETAILED SOFT LANDSCAPING SCHEDULESuperseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1027-BOUNDARY TREATMENTS PLANSuperseded Plan · PDF19 Aug 2024View
2410-GUA-XX-XX-DR-L-1028-LANDSCAPE DETAILSSuperseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 500 P02 PROPOSED DRAINAGE LAYOUT (OVERALL)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 501 P02 PROPOSED DRAINAGE LAYOUT (SHEET 1)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 502 P02 PROPOSED DRAINAGE LAYOUT (SHEET 2)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 503 P02 PROPOSED DRAINAGE LAYOUT (SHEET 3)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 504 P02 PROPOSED DRAINAGE LAYOUT (SHEET 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 510 P01 PROPOSED DRAINAGE SECTIONS (SHEET 1 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 511 P01 PROPOSED DRAINAGE SECTIONS (SHEET 2 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 512 P01 PROPOSED DRAINAGE SECTIONS (SHEET 3 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 513 P01 PROPOSED DRAINAGE SECTIONS (SHEET 4 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 520 P01 PROPOSED MANHOLE SCHEDULES (SHEET 1 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 521 P01 PROPOSED MANHOLE SCHEDULES (SHEET 2 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 522 P01 PROPOSED MANHOLE SCHEDULES (SHEET 3 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 523 P01 PROPOSED MANHOLE SCHEDULES (SHEET 4 OF 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1200 P01 DRAINAGE CONSTRUCTION DETAILS (SHEET 1 OF 6)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1201 P01 DRAINAGE CONSTRUCTION DETAILS (SHEET 2 OF 6)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1202 P01 DRAINAGE CONSTRUCTION DETAILS (SHEET 3 OF 6)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1203 P01 DRAINAGE CONSTRUCTION DETAILS (SHEET 4 OF 6)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1204 P01 DRAINAGE CONSTRUCTION DETAILS (SHEET 5 OF 6)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1205 P01 DRAINAGE CONSTRUCTION DETAILS (SHEET 6 OF 6)Superseded Plan · PDF19 Aug 2024View
CC1442-102_C - TYPICAL CULVERT DETAILS (NORTH)Superseded Plan · PDF19 Aug 2024View
CC1442-107_A - TYPICAL CULVERT DETAILS (SOUTH)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1190 P01 HIGHWAY CONSTRUCTION DETAILS (SHEET 1)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1191 P01 HIGHWAY CONSTRUCTION DETAILS (SHEET 2)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1192 P01 HIGHWAY CONSTRUCTION DETAILS (SHEET 3)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1193 P01 HIGHWAY CONSTRUCTION DETAILS (SHEET 4)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1194 P01 HIGHWAY CONSTRUCTION DETAILS (SHEET 5)Superseded Plan · PDF19 Aug 2024View
CC1442 CAM ZZ XX DR C 1195 P01 HIGHWAY CONSTRUCTION DETAILS (SHEET 6)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0121 P2 REFUSE VEHICLE TRACKING (SHEET 1)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0122 P2 REFUSE VEHICLE TRACKING (SHEET 2)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0123 P2 REFUSE VEHICLE TRACKING (SHEET 3)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0124 P2 MAX LEGAL ARTIC VEHICLE TRACKINGSuperseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0125 P2 FIRE TENDER TRACKING (SHEET 1)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0126 P2 FIRE TENDER TRACKING (SHEET 2)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0127 P2 FIRE TENDER TRACKING (SHEET 3)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0128 P2 FIRE TENDER TRACKING (SHEET 4)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0700 P2 ACCESS ROADS LAYOUT (OVERALL)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0701 P2 ACCESS ROADS LAYOUT (SHEET 1)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0702 P2 ACCESS ROADS LAYOUT (SHEET 2)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0703 P2 ACCESS ROADS LAYOUT (SHEET 3)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0704 P2 ACCESS ROADS LAYOUT (SHEET 4)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0705 P2 ACCESS ROADS LAYOUT (SHEET 5)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0706 P2 ACCESS ROADS LAYOUT (SHEET 6)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0711 P2 ACCESS ROADS KERBS AND SURFACING (SHEET 1)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0712 P2 ACCESS ROADS KERBS AND SURFACING (SHEET 2)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0713 P2 ACCESS ROADS KERBS AND SURFACING (SHEET 3)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0714 P2 ACCESS ROADS KERBS AND SURFACING (SHEET 4)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0715 P2 ACCESS ROADS KERBS AND SURFACING (SHEET 5)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0716 P2 ACCESS ROADS KERBS AND SURFACING (SHEET 6)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 717 P1 EMERGENCY ACCESS LINK SHARED FOOTWAY CYCLEWAYSuperseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0801 P1 ACCESS ROADS VERTICAL ALIGNMENT (SHEET 1)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0802 P1 ACCESS ROADS VERTICAL ALIGNMENT (SHEET 2)Superseded Plan · PDF19 Aug 2024View
CC1442-CAM ZZ XX DR C 0803 P1 ACCESS ROADS VERTICAL ALIGNMENT (SHEET 3)Superseded Plan · PDF19 Aug 2024View
721_(20)_001_P01 LOCATION PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_100_P08 PROPOSED SITE PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_101_P01 MASSING PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_102_P01 REFUSE AND CYCLE PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_103_P01 GARDEN AREA PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_104_P02 SITE TENURE PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_105_P01 BLOCK OF FLATS TENURE PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_106_P02 PARKING AND EV CHARGING PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_110_P2 FLAT BLOCKS GROUND FLOOR GA PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_111_P2 FLAT BLOCKS FIRST FLOOR GA PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_112_P2 FLAT BLOCKS SECOND FLOOR GA PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_113_P2 FLAT BLOCKS THIRD FLOOR GA PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_114_P1 FLAT BLOCKS ROOF PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_120_P2 HOUSE TYPE A FLOOR PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_121_P2 HOUSE TYPE A ROOF PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_130_P2 HOUSE TYPE B FLOOR PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_131_P2 HOUSE TYPE B ROOF PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_140_P2 HOUSE TYPE C FLOOR PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_141_P2 HOUSE TYPE C ROOF PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_150_P2 HOUSE TYPE D FLOOR PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_151_P2 HOUSE TYPE D ROOF PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_170_P2 HOUSE TYPE E GROUND AND FIRST FLOOR PLANSSuperseded Plan · PDF19 Aug 2024View
721_(20)_171_P2 HOUSE TYPE E SECOND FLOOR AND ROOF PLANSSuperseded Plan · PDF19 Aug 2024View
721_(20)_180_P2 HOUSE TYPE F FLOOR AND ROOF PLANSSuperseded Plan · PDF19 Aug 2024View
721_(20)_190_P2 HOUSE TYPE G FLOOR AND ROOF PLANSSuperseded Plan · PDF19 Aug 2024View
721_(20)_195_P01 DOUBLE GARAGE FLOOR PLAN AND ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_196_P01 SINGLE GARAGE FLOOR PLAN AND ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_197_P01 BIN AND CYCLE STORE PLAN AND ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_220_P2 HOUSE TYPE A ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_230_P2 HOUSE TYPE B ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_240_P2 HOUSE TYPE C ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_250_P2 HOUSE TYPE D ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_270_P2 HOUSE TYPE E ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_280_P2 HOUSE TYPE F ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_290_P2 HOUSE TYPE G ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_300_P03 INDUSTRIAL BUILDING GROUND FLOOR PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_301_P03 INDUSTRIAL BUILDING FIRST FLOOR PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_302_P02 INDUSTRIAL BUILDING ROOF PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_310_P02 INDUSTRIAL BUILDING SECTIONS AA BBSuperseded Plan · PDF19 Aug 2024View
721_(20)_320_P02 INDUSTRIAL BUILDING SOUTH AND WEST ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_321_P02 INDUSTRIAL BUILDING NORTH AND EAST ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_350_P01 INDUSTRIAL BUILDING BIN BIKE STORE PLANSSuperseded Plan · PDF19 Aug 2024View
721_(20)_351_P01 INDUSTRIAL BUILDING BIN BIKE STORE ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
ARBORICULTURAL SURVEYStudies and Reports · PDF19 Aug 2024View
COVER LETTER RESERVED MATTERS APPLICATIONCover Letter · PDF19 Aug 2024View
DETAILED UXO RISK ASSESSMENTStudies and Reports · PDF19 Aug 2024View
DRAINAGE STRATEGY REPORT PART 1Studies and Reports · PDF19 Aug 2024View
DRAINAGE STRATEGY REPORT PART 2Studies and Reports · PDF19 Aug 2024View
DRAINAGE STRATEGY REPORT PART 3Studies and Reports · PDF19 Aug 2024View
DRAINAGE STRATEGY REPORT PART 4Studies and Reports · PDF19 Aug 2024View
DRAINAGE STRATEGY REPORT PART 5Studies and Reports · PDF19 Aug 2024View
ENVIRONMENTAL NOISE ASSESSMENTStudies and Reports · PDF19 Aug 2024View
ESSEX SUDS WATER PROFORMAStudies and Reports · PDF19 Aug 2024View
FIRE ACCESS ADVICE LETTERStudies and Reports · PDF19 Aug 2024View
GROUND INVESTIGATION REPORTStudies and Reports · PDF19 Aug 2024View
LANDSCAPE STRATEGY REPORTStudies and Reports · PDF19 Aug 2024View
OVERSHADOWING ASSESSMENTStudies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENT APPENDICES PART 1Studies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENT APPENDICES PART 2Studies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENT APPENDICES PART 3Studies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENT APPENDICES PART 4Studies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENT APPENDICES PART 5Studies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENT APPENDICES PART 6Studies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENT APPENDICES PART 7Studies and Reports · PDF19 Aug 2024View
PRELIMINARY RISK ASSESSMENTStudies and Reports · PDF19 Aug 2024View
SUSTAINABLE DESGIN AND CONSTRUCTION STATEMENTStudies and Reports · PDF19 Aug 2024View
TRANSPORT NOTEStudies and Reports · PDF19 Aug 2024View
TREE PLANStudies and Reports · PDF19 Aug 2024View
721_(20)_160_P1 HOUSE TYPE D1 FLOOR PLANSSuperseded Plan · PDF19 Aug 2024View
721_(20)_161_P1 HOUSE TYPE D1 ROOF PLANSuperseded Plan · PDF19 Aug 2024View
721_(20)_200_P01 SITE SECTIONSSuperseded Plan · PDF19 Aug 2024View
721_(20)_210_P3 FLAT BLOCKS ELEVATIONS SHEET 1Superseded Plan · PDF19 Aug 2024View
721_(20)_211_P3 FLAT BLOCKS ELEVATIONS SHEET 2Superseded Plan · PDF19 Aug 2024View
721_(20)_212_P1 FLAT BLOCKS COURTYARD ELEVATIONS SHEET 1Superseded Plan · PDF19 Aug 2024View
721_(20)_213_P1 FLAT BLOCKS COURTYARD ELEVATIONS SHEET 2Superseded Plan · PDF19 Aug 2024View
721_(20)_260_P1 HOUSE TYPE D1 ELEVATIONSSuperseded Plan · PDF19 Aug 2024View
DRAWING SCHEDULEOther · PDF19 Aug 2024View
ACCOMMODATION SCHEDULEStudies and Reports · PDF19 Aug 2024View
PLANNING STATEMENTStudies and Reports · PDF19 Aug 2024View
DESIGN AND ACCESS STATEMENT PART 1Studies and Reports · PDF19 Aug 2024View
DESIGN AND ACCESS STATEMENT PART 2Studies and Reports · PDF19 Aug 2024View
DESIGN AND ACCESS STATEMENT PART 3Studies and Reports · PDF19 Aug 2024View
DESIGN AND ACCESS STATEMENT PART 4Studies and Reports · PDF19 Aug 2024View
DESIGN AND ACCESS STATEMENT PART 5Studies and Reports · PDF19 Aug 2024View
DESIGN AND ACCESS STATEMENT PART 6Studies and Reports · PDF19 Aug 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.