Council planning record

Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure

Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

PermittedReference: 24/00811/DCOAPPThurrock Council

Last published check: 30 Sept 2026, 09:43. Check the council record for more recent changes.

Application location

Thurrock Flexible Generation Plant Station Road East Tilbury Essex RM18 8QR

This record has no verified map location.

View council map

Application summary

Status
Permitted
Application type
Development Consent Order Application
Received
24 Jul 2024
Validated
24 Jul 2024
Determination deadline
18 Sept 2024
Local authority
Thurrock Council

Application overview

Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the second phase, to provide 450MW gas reciprocating engine facility, gas pipeline, gas connected compound and associated infrastructure

Proposal details

Reference
24/00811/DCOAPP
Ward
OLD Tilbury Riverside And Thurrock Park

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 27 of 27

DocumentPublishedAction
DECISION NOTICEDecision Notice · PDF19 Nov 2024View
LLFAConsultee Comment15 Nov 2024View
LOCAL LEAD FLOOD AUTHORITYConsultee Comment13 Nov 2024View
LOCAL LEAD FLOOD AUTHORITYConsultee Comment31 Oct 2024View
DECISION NOTICE REQ 14Decision Notice · PDF15 Oct 2024View
OVERALL GENERAL ARRANGEMENT - PIPELINE EAST.Current Plan · PDF25 Sept 2024View
ENVIRONMENT AGENCY.Consultee Comment · PDF20 Aug 2024View
ROOF DRAINAGE & RAIN WATER SYSTEMCurrent Plan · PDF29 Jul 2024View
PEAKER OVERALL DRAINAGE GENERAL ARRANGEMENTCurrent Plan · PDF29 Jul 2024View
THURROCK SITE LAYOUT FOR G37Current Plan · PDF29 Jul 2024View
APPENDIX A - DRAINAGE IMPACT ASSESSMENT & STRATEGYStudies and Reports · PDF29 Jul 2024View
APPENDIX A - SL245_L_X_GCP_1_GAS CONNECTION AND PLANTINGCurrent Plan · PDF29 Jul 2024View
PEAKER OVERALL ARCHITECTURAL ELEVATIONSCurrent Plan · PDF29 Jul 2024View
WEST ELEVATIONCurrent Plan · PDF29 Jul 2024View
EAST ELEVATIONCurrent Plan · PDF29 Jul 2024View
PEAKER LAYOUTCurrent Plan · PDF29 Jul 2024View
THURROCK PRS SITE LAYOUTCurrent Plan · PDF29 Jul 2024View
OVERALL GENERAL ARRANGEMENT - MAIN SITECurrent Plan · PDF29 Jul 2024View
OVERALL GENERAL ARRANGEMENT - PIPELINE WESTCurrent Plan · PDF29 Jul 2024View
REQUIREMENT 14 - PHASE 2 LEMP ADDENDUMStudies and Reports · PDF29 Jul 2024View
TYPICAL CROSSING & INSTALL ARRANGEMENTS.Current Plan · PDF29 Jul 2024View
PRESSURE REDUCTION STATION SITE -SIDE ELEVATIONCurrent Plan · PDF29 Jul 2024View
PTF-MOC - SIDE SECTION VIEWCurrent Plan · PDF29 Jul 2024View
DRAINAGE DESIGN - GAS PEAKERStudies and Reports · PDF29 Jul 2024View
GAS CONNECTION AND PLANTINGCurrent Plan · PDF29 Jul 2024View
COVERING LETTERCover Letter · PDF24 Jul 2024View
GAS CONNECTION COMPOUNDS AND LANDSCAPE WORKSCurrent Plan · PDF24 Jul 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Approved
DECISION NOTICE DECISION NOTICE REQ 14

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.