Council planning record

Application for the variation of condition 10 (Site Layout, Design and Fire Protection) of the deemed planning permission ref: (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power).

Tilbury Green Power Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

PermittedReference: 23/01014/CONDCThurrock Council

Last published check: 8 Oct 2026, 21:23. Check the council record for more recent changes.

Application location

Tilbury Green Power Port Of Tilbury Tilbury Freeport Tilbury Essex RM18 7NU

This record has no verified map location.

View council map

Application summary

Status
Permitted
Application type
Condition Clearance
Received
14 Aug 2023
Validated
16 Aug 2023
Determination deadline
11 Oct 2023
Local authority
Thurrock Council

Application overview

Application for the variation of condition 10 (Site Layout, Design and Fire Protection) of the deemed planning permission ref: (ref. 12.04.09.04/266C - as varied) for the construction and operation of a biomass and energy from waste fuelled electricity generating station at Tilbury Docks (Tilbury Green Power).

Proposal details

Reference
23/01014/CONDC
Ward
OLD Tilbury Riverside And Thurrock Park

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 53 of 53

DocumentPublishedAction
DECISION NOTICEDecision Notice · PDF2 May 2024View
1442_PL500_D - 3D AERIAL VIEW - ALL PHASESCurrent Plan · PDF4 Apr 2024View
1442_PL304_C - TRANSFORMER - PLAN AND ELEVATIONSCurrent Plan · PDF4 Apr 2024View
1442_SK201_D - PROPOSED SITE SECTIONSCurrent Plan · PDF4 Apr 2024View
1442_PL105_D - ERF - PROPOSED SW ELEVATIONCurrent Plan · PDF4 Apr 2024View
1442_PL104_C - ERF - PROPOSED SE ELEVATION (1)Current Plan · PDF4 Apr 2024View
1442_PL103_C - ERF - PROPOSED NE ELEVATION (1)Current Plan · PDF4 Apr 2024View
1442_PL102_D - ERF - PROPOSED NW ELEVATIONCurrent Plan · PDF4 Apr 2024View
1442_PL101_C - SOUTH SITE ELEVATION - ALL PHASESCurrent Plan · PDF4 Apr 2024View
1442_PL100_D - CURZON DRIVE SITE ELEVATION - ALL PHASESCurrent Plan · PDF4 Apr 2024View
1442_PL050_E - SITE LAYOUT - OUTAGE AREASCurrent Plan · PDF4 Apr 2024View
1442_PL013_E - SITE LAYOUT - VEHICLE TRACKINGCurrent Plan · PDF4 Apr 2024View
1442_PL012_E - SITE LAYOUT - FENCINGCurrent Plan · PDF4 Apr 2024View
1442_PL011_E - SITE LAYOUT - PHASE 2Current Plan · PDF4 Apr 2024View
1442_PL010_E - SITE LAYOUT - ALL PHASESCurrent Plan · PDF4 Apr 2024View
1442_IL006 - KEY PLAN - PROPOSED SITE SECTION THROUGH CURZON DRIVE (EXTENDED) (1Current Plan · PDF4 Apr 2024View
1442_IL005 - PROPOSED SITE SECTION THROUGH CURZON DRIVE (EXTENDED) (1)Current Plan · PDF4 Apr 2024View
1442_IL004_A - FIGURE 4_3 PROPOSED PHASE 2 NW ELEVATION 2023 WITH OVERLAY OF 202Current Plan · PDF4 Apr 2024View
HIGHWAYSConsultee Comment · PDF26 Feb 2024View
ESSEX FIREConsultee Comment · PDF5 Feb 2024View
RESPONSE TO FIRE AND RESCUE COMMENTSStudies and Reports19 Jan 2024View
ESSEX FIREConsultee Comment · PDF17 Nov 2023View
FIRE AND RESCUE RESPONSE FROM AGENTStudies and Reports · PDF6 Nov 2023View
ESSEX COUNTY FIRE AND RESCUEConsultee Comment · PDF17 Oct 2023View
URBAN DESIGNConsultee Comment · PDF6 Oct 2023View
HIGHWAYSConsultee Comment · PDF27 Sept 2023View
EXCERPT FROM THE FIRE PROTECTION & LIFE SAFETY STRATEGYStudies and Reports · PDF25 Sept 2023View
PROPOSED SITE SECTION BB EXTENDED TO CURZON DRIVECurrent Plan · PDF21 Sept 2023View
PROPOSED SITE SECTION B-B - KEY PLANCurrent Plan · PDF21 Sept 2023View
PROPOSED LAYOUT - VEHICLE TRACKINGSuperseded Plan · PDF12 Sept 2023View
ENVIRONMENTAL HEALTH.Consultee Comment · PDF1 Sept 2023View
ADDITIONAL INFORMATION FROM AGENTStudies and Reports · PDF29 Aug 2023View
APPLICATIONFORMREDACTEDApplication Form · PDF14 Aug 2023View
THAMESIDE ERF_ SCHEDULE OF PROPOSED CHANGES_110723 (1)Studies and Reports · PDF14 Aug 2023View
TERF_APPENDIX 3 LIGHTING ASSESSEMENTStudies and Reports · PDF14 Aug 2023View
TERF_APPENDIX 2 ACOUSTIC ASSESSMENTStudies and Reports · PDF14 Aug 2023View
TER_APPENDIX E_3D PHOTOMONTAGESStudies and Reports · PDF14 Aug 2023View
TERF_APPENDIX 1D_3D IMAGESStudies and Reports · PDF14 Aug 2023View
TERF_APPENDIX 1C_ANCILLARY BUILDINGSStudies and Reports · PDF14 Aug 2023View
TERF_APPENDIX 1B_MAIN ERF BUILDINGStudies and Reports · PDF14 Aug 2023View
TERF_APPENDIX 1A_SITEStudies and Reports · PDF14 Aug 2023View
TERF_CONDITION 10_OVERARCHING DESIGN STATEMENT_JUL 23Studies and Reports · PDF14 Aug 2023View
SITE LAYOUTSuperseded Plan · PDF14 Aug 2023View
SITE LAYOUT PHASE 2Superseded Plan · PDF14 Aug 2023View
PROPOSED LAYOUTSuperseded Plan · PDF14 Aug 2023View
SITE ELEVATIONSuperseded Plan · PDF14 Aug 2023View
SOUTHERN SITE ELEVATIONSuperseded Plan · PDF14 Aug 2023View
PROPOSED NORTH WEST ELEVATIONSuperseded Plan · PDF14 Aug 2023View
PROPOSED NORTH EAST ELEVATIONSuperseded Plan · PDF14 Aug 2023View
PROPOSED SOUTH ELEVATIONSuperseded Plan · PDF14 Aug 2023View
PROPOSED SOUTH WEST ELEVATIONSuperseded Plan · PDF14 Aug 2023View
PROPOSED SITE SECTIONSCurrent Plan · PDF14 Aug 2023View
FUEL TANK PLANS AND ELEVATIONSCurrent Plan · PDF14 Aug 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Approved
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.