Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Sub Station Tilbury Power Station Fort Road Tilbury Essex
Last published check: 8 Oct 2026, 19:27. Check the council record for more recent changes.
Sub Station Tilbury Power Station Fort Road Tilbury Essex
This record has no verified map location.
View council mapNon Statutory Consultation for the Norwich to Tilbury Project (Formerly known as East Anglia Green). The proposal is for the construction of a new 400kV electricity transmission line between Norwich and Tilbury and a new substation at Bramford to connect to new offshore wind farms close to the coast. The consultation runs from 27 June 2023 to 21 August 2023. For Thurrock the proposal would see the new 400kV electricity transmission line entering the Borough from the north and would head south to connect to the Tilbury sub station. The new 400kV electricity transmission line would mainly comprise of overhead lines but with some elements of underground cabling.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| PUBLIC HEALTHConsultee Comment · PDF | 28 Sept 2023 | View |
| LPA RESPONSEDecision Notice · PDF | 21 Aug 2023 | View |
| PUBLIC HEALTHConsultee Comment · PDF | 31 Jul 2023 | View |
| FEEDBACK FORMStudies and Reports · PDF | 28 Jun 2023 | View |
| PROJECT BACKGROUND DOCUMENStudies and Reports · PDF | 28 Jun 2023 | View |
| GUIDE TO INTERACTING WITH OUR CONSULTATION PLANStudies and Reports · PDF | 28 Jun 2023 | View |
| NON-STATUTORY PUBLIC CONSULTATION STRATEGYStudies and Reports · PDF | 28 Jun 2023 | View |
| PREFERRED DRAFT ALIGNMENT SECTIONStudies and Reports · PDF | 28 Jun 2023 | View |
| PREFERRED DRAFT ALIGNMENT CONSTRAINTS SECTION HStudies and Reports · PDF | 28 Jun 2023 | View |
| STRATEGIC OPTIONS BACKCHECK AND REVIEWStudies and Reports · PDF | 28 Jun 2023 | View |
| DESIGN DEVELOPMENT REPORT _0Studies and Reports · PDF | 28 Jun 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.