Council planning record

Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase, to provide 300MW of battery storage with associated infrastructure and mitigation

Thurrock Flexible Generation Plant Fort Road Tilbury Essex

PermittedReference: 23/00549/DCOAPPThurrock Council

Application location

Thurrock Flexible Generation Plant Fort Road Tilbury Essex

This record has no verified map location.

View council map

Application summary

Status
Permitted
Application type
Development Consent Order Application
Received
5 May 2023
Validated
16 May 2023
Determination deadline
11 Jul 2023
Local authority
Thurrock Council

Application overview

Application to discharge requirements in part, for requirements 4 (detailed design); 10 (surface water drainage); and 14 (landscape and environmental management plan) of the Thurrock Flexible Generation Plant Development Consent Order 2022 (the DCO) for the first phase, to provide 300MW of battery storage with associated infrastructure and mitigation

Proposal details

Reference
23/00549/DCOAPP
Ward
OLD Tilbury Riverside And Thurrock Park

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 33 of 33

DocumentPublishedAction
ECC-SD-0700-008 - EDGE HAUNCH DETAILCurrent Plan · PDF14 Jul 2023View
DRAWING PACK 23015-101 - 23015-108 COOPERS SHAW ROAD ACCESSCurrent Plan · PDF14 Jul 2023View
DRAWING PACK 23015-001 ? 23015-010 ? STATION ROAD ACCESSCurrent Plan · PDF14 Jul 2023View
HIGHWAYSConsultee Comment · PDF14 Jul 2023View
HIGHWAYSConsultee Comment · PDF13 Jul 2023View
PHASE 1 LANDSCAPE AND ENVIRONMENTAL MANAGEMENT PLANStudies and Reports · PDF19 Jun 2023View
PORT OF TILBURY COMMENTS TO THE LEMPNeighbour Comment · PDF14 Jun 2023View
ENVIRONMENT AGENCYConsultee Comment · PDF12 Jun 2023View
NATIONAL GASConsultee Comment · PDF19 May 2023View
APPLICATIONFORMREDACTEDApplication Form · PDF5 May 2023View
GENERAL ARRANAGEMENT-SHEET2Current Plan · PDF5 May 2023View
GENERAL ARRANAGEMENT-SHEET3Current Plan · PDF5 May 2023View
GENERAL ARRANAGEMENT-SHEET1Current Plan · PDF5 May 2023View
BATTERY UNITSCurrent Plan · PDF5 May 2023View
PCS UNITSCurrent Plan · PDF5 May 2023View
GENERAL ARRANAGEMENTCurrent Plan · PDF5 May 2023View
GENERAL ARRANAGEMENTCurrent Plan · PDF5 May 2023View
THURROCK LEMP DRAWING PACKCurrent Plan · PDF5 May 2023View
TYPICAL DETAILSCurrent Plan · PDF5 May 2023View
FOOTBRIDGE TO THE EXCHANGE COMMON LANDCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE LAYOUTCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGECurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE LAYOUTCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE LAYOUTCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE LAYOUTCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE LAYOUTCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE LAYOUTCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE LAYOUTCurrent Plan · PDF5 May 2023View
HEADWALL CONNECTION DETAILSCurrent Plan · PDF5 May 2023View
HEADWALL CONNECTION DETAILSCurrent Plan · PDF5 May 2023View
SURFACE WATER DRAINAGE STRATEGY REF 29682DIA - REPLSB REV01Studies and Reports · PDF5 May 2023View
CONCEPTUAL DRAINAGE STRATEGY FROM DCO APPLICATION (FOR INFORMATION)Studies and Reports · PDF5 May 2023View
COVER LETTER 5.5.23Cover Letter · PDF5 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Approved
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.