Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Purfleet Railway Station Railway Line And Land Adjacent London Road Purfleet-on-Thames Essex
Purfleet Railway Station Railway Line And Land Adjacent London Road Purfleet-on-Thames Essex
This record has no verified map location.
View council mapApplication for approval of reserved matters (layout, scale, appearance and landscaping) following outline approval ref. 20/01129/CV (for development of 2,850 dwellinghouses and associated uses on land at Land at Purfleet, bounded to the north by Tank Lane and the High Speed 1 Rail Link; to the east by the chalk cliffs of Botany Quarry, the Carpetright storage and distribution centre and to the southeast by Esso Petroleum storage facility; to the south-west and south by the River Thames and to the west / north-west by residential properties and the Essex Thameside railway line and associated), for a replacement railway station building comprising station ticketing facilities and gatelines works, railway station footbridge, associated office space and services; platform concourse and canopies; pedestrian, cycle and vehicular accesses; car and cycle parking facilities; and, public realm plus associated energy and waste facilities, engineering, drainage, utilities, landscaping and infrastructure works (Purfleet Centre).
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| GENERAL ARRANGEMENT PLAN RAILWAY STATIONCurrent Plan · PDF | 7 Aug 2023 | View |
| PURFLEET STATION WEST AND EAST SECTIONCurrent Plan · PDF | 7 Aug 2023 | View |
| SOUTH ELEVATION RAILWAY STATIONCurrent Plan · PDF | 7 Aug 2023 | View |
| URBAN DESIGNConsultee Comment | 27 Jul 2023 | View |
| LANDSACPE & ECOLOGYConsultee Comment · PDF | 16 Jun 2023 | View |
| HIGHWAYSConsultee Comment · PDF | 15 Jun 2023 | View |
| NETWORK RAILConsultee Comment · PDF | 14 Jun 2023 | View |
| ESSEX POLICEConsultee Comment · PDF | 2 Jun 2023 | View |
| ENVIRONMENT AGENCYConsultee Comment · PDF | 31 May 2023 | View |
| EMERGENCY PLANNINGConsultee Comment | 24 May 2023 | View |
| ENVIRONMENTAL HEALTHConsultee Comment · PDF | 23 May 2023 | View |
| FLOOD RISKConsultee Comment · PDF | 15 May 2023 | View |
| HIGHWAYSConsultee Comment · PDF | 15 May 2023 | View |
| ESSEX CO. FIRE/RESCUE CONSULTATION GRAYSConsultee Comment · PDF | 9 May 2023 | View |
| ESSEX CO. FIRE/RESCUE CONSULTATION GRAYSConsultee Comment · PDF | 9 May 2023 | View |
| ECOLOGICAL IMPACT ASSESSMENTStudies and Reports · PDF | 4 May 2023 | View |
| APPLICATIONFORMREDACTEDApplication Form · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 11Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 12Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 1Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 2Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 3Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 4Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 5Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 6Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 7Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 8Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 9Studies and Reports · PDF | 25 Apr 2023 | View |
| DESIGN & ACCESS STATEMENT PART 10Studies and Reports · PDF | 25 Apr 2023 | View |
| RAILWAY STATION TOWN CENTRE CAR PARK SECTIONSCurrent Plan · PDF | 25 Apr 2023 | View |
| DRAWING REGISTERStudies and Reports · PDF | 25 Apr 2023 | View |
| RAILWAY STATION PROPOSED GROUND FLOOR PLANCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION SITE LOCATION PLANCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION PROPOSED BLOCK ARRANGEMENTCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION EXISTING FLOOR PLANCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION EXISTING EAST & WEST SECTIONSCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION EXISTING NORTH & SOUTH SECTIONSCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION PLATFORM LEVEL PLANCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION PROPOSED ROOF PLANCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION PROPOSED NORTH & SOUTH ELEVATIONSCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION EXISTING EAST & WEST ELEVATIONSCurrent Plan · PDF | 25 Apr 2023 | View |
| RAILWAY STATION SOUTH ELEVATIONCurrent Plan · PDF | 25 Apr 2023 | View |
| PURFLEET STATION FOOTBRIDGE SECTION A-ACurrent Plan · PDF | 25 Apr 2023 | View |
| PURFLEET STATION EAST & WEST SECTIONSCurrent Plan · PDF | 25 Apr 2023 | View |
| GENERAL ARRANGEMENT PLAN RAILWAY STATIONCurrent Plan · PDF | 25 Apr 2023 | View |
| LANDSCAPE STATEMENT PART 2Studies and Reports · PDF | 25 Apr 2023 | View |
| LANDSCAPE STATEMENT PART 1Studies and Reports · PDF | 25 Apr 2023 | View |
| PERMANENT STATION BUILDING & FOOTBRIDGE GENERAL ARRANGEMENT SHEET 2 PLATFORM LCurrent Plan · PDF | 25 Apr 2023 | View |
| PERMANENT STATION BUILDING & FOOTBRIDGE GENERAL ARRANGEMENT SHEET 5 CROSS SECTCurrent Plan · PDF | 25 Apr 2023 | View |
| PERMANENT STATION BUILDING & FOOTBRIDGE GENERAL ARRANGEMENT SHEET 3 FOOTBRIDGECurrent Plan · PDF | 25 Apr 2023 | View |
| PLANNING STATEMENT MARCH 2023Studies and Reports · PDF | 25 Apr 2023 | View |
| STATEMENT OF COMMUNITY INVOLVEMENTStudies and Reports · PDF | 25 Apr 2023 | View |
| ARBORICULTURAL STATEMENTStudies and Reports · PDF | 25 Apr 2023 | View |
| AIR QUALITY TECHNICAL NOTEStudies and Reports · PDF | 25 Apr 2023 | View |
| DAYLIGHT AND SUNLIGHT REPORTStudies and Reports · PDF | 25 Apr 2023 | View |
| ECOLOGICAL IMPACT ASSESSMENTSuperseded · PDF | 25 Apr 2023 | View |
| ENERGY STATEMENTStudies and Reports · PDF | 25 Apr 2023 | View |
| EIA STATEMENT OF CONFORMITYStudies and Reports · PDF | 25 Apr 2023 | View |
| PROPOSED CONCOURSE PLANCurrent Plan · PDF | 25 Apr 2023 | View |
| PROPOSED PLATFORM PLANCurrent Plan · PDF | 25 Apr 2023 | View |
| PEDESTRIAN LEVEL WIND DESK-BASED ASSESSMENTStudies and Reports · PDF | 25 Apr 2023 | View |
| TRANSPORT TECHNICAL NOTEStudies and Reports · PDF | 25 Apr 2023 | View |
| FRAMEWORK TRAVEL PLANStudies and Reports · PDF | 25 Apr 2023 | View |
| PURFLEET RAILWAY STATION - COVERING LETTER ISSUEDCover Letter · PDF | 25 Apr 2023 | View |
| DETAILED SURFACE WATER DRAINAGE STRATEGY PART 2Studies and Reports · PDF | 25 Apr 2023 | View |
| DETAILED SURFACE WATER DRAINAGE STRATEGY PART 1Studies and Reports · PDF | 25 Apr 2023 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.