T1 Silver Birch - Reduce size of crown height by reducing all live, over-extended branches by 1-2m - entire canopy.T2 Purple Leaf Plum - Reduce all live, interfering, over-extended branches, 1m length reduction, growing toward garden (back tofence line)T3 Cherry - Reduce live, interfering, over-extended branches as needed, 2m length reduction, growing toward neighbouring property.T4 Acacia - Reduce and/or remove live, interfering branches as needed, growing toward and over garden area.T5 Hawthorn - Reduce all live, interfering branches, 1-2m length reduction, entire canopy and remove dead, declining branches as needed, entire canopy.Reason for all above listed works: part of a cyclical maintenance plan to ensure the overall health and safety of the trees.
101 Oaklands Avenue Oxhey Hall Watford Hertfordshire WD19 4TN
T1 Silver Birch - Reduce size of crown height by reducing all live, over-extended branches by 1-2m - entire canopy.T2 Purple Leaf Plum - Reduce all live, interfering, over-extended branches, 1m length reduction, growing toward garden (back tofence line)T3 Cherry - Reduce live, interfering, over-extended branches as needed, 2m length reduction, growing toward neighbouring property.T4 Acacia - Reduce and/or remove live, interfering branches as needed, growing toward and over garden area.T5 Hawthorn - Reduce all live, interfering branches, 1-2m length reduction, entire canopy and remove dead, declining branches as needed, entire canopy.Reason for all above listed works: part of a cyclical maintenance plan to ensure the overall health and safety of the trees.
Reference
26/0450/TCA
Alternative references
PP-14791289
Ward
Oxhey Hall And Hayling
Parish
Watford Rural Parish Council
Agent
Mr Kevin Woodham
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.