Council planning record

Full discharge of Condition 3 (Materials), Condition 4 (Highway Construction), Condition 5 (Highways Condition Survey), Condition 6 (Relocation Of The Existing Bus Stop), Condition 10 (Demolition Construction Environment Management Plan), Condition 13 (Sustainable Surface Water Drainage Scheme), Condition 14 (Cycle Storage), Condition 17 (Updated Bat Assessment), Condition 18 (WSI Archaeological Works), Condition 19 (Remediation Strategy and Preliminary Risk Assessment), Condition 21 (Coal Mining), Condition 23 (Biodiversity Enhancement Scheme), Condition 25 (Relocation Of Item SL11), and Condition 27 (Method Statement) of planning reference 23/00971/FUL

St Lukes Church Of England Church And Sunday School King Street Dukinfield Tameside SK16 4HH

DecidedReference: 25/00049/PLCONDTameside Metropolitan Borough Council

Last published check: 13 Oct 2026, 16:45. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Formal Discharge Of Planning Conditions
Received
27 May 2025
Validated
27 May 2025
Determination deadline
19 Aug 2025
Local authority
Tameside Metropolitan Borough Council

Application overview

Full discharge of Condition 3 (Materials), Condition 4 (Highway Construction), Condition 5 (Highways Condition Survey), Condition 6 (Relocation Of The Existing Bus Stop), Condition 10 (Demolition Construction Environment Management Plan), Condition 13 (Sustainable Surface Water Drainage Scheme), Condition 14 (Cycle Storage), Condition 17 (Updated Bat Assessment), Condition 18 (WSI Archaeological Works), Condition 19 (Remediation Strategy and Preliminary Risk Assessment), Condition 21 (Coal Mining), Condition 23 (Biodiversity Enhancement Scheme), Condition 25 (Relocation Of Item SL11), and Condition 27 (Method Statement) of planning reference 23/00971/FUL

Proposal details

Reference
25/00049/PLCOND
Alternative references
PP-14044045
Ward
Dukinfield
Parish
Dukinfield
Agent
Mark English Architecture

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

St Lukes Church Of England Church And Sunday School King Street Dukinfield Tameside SK16 4HH

This record has no verified map location.

View council map

Documents 66 of 66

DocumentPublishedAction
DECISION NOTICEDecision · PDF23 Apr 2026View
LOCAL HIGHWAYS AUTHORITYConsultee Comment · PDF17 Apr 2026View
CONTAMINATED LANDConsultee Comment · PDF8 Apr 2026View
CONSULTATION RESPONSE - COALConsultee Comment · PDF23 Oct 2025View
CONSULTATION RESPONSE - CONTAMINATED LANDConsultee Comment · PDF15 Oct 2025View
COMPLETION REPORT FOR THE DRILLING & GROUTING TREATMENT OF SHALLOW MINE WORKINGSBackground Papers · PDF13 Oct 2025View
PHASE 1 AND PHASE 2 GEOENVIRONMENTAL SITE INVESTIGATIONBackground Papers · PDF24 Sept 2025View
REMEDIATION STRATEGYBackground Papers · PDF24 Sept 2025View
APPENDIX 2 EXPLORATORY HOLE LOGSBackground Papers · PDF24 Sept 2025View
APPENDIX 3 GEOTECHNICAL TESTING RESULTSBackground Papers · PDF24 Sept 2025View
APPENDIX 4 CHEMICAL TESTING RESULTSBackground Papers · PDF24 Sept 2025View
APPENDIX 5 SOIL WASTE ASSESSMENTBackground Papers · PDF24 Sept 2025View
APPENDIX 6 FALLING HEAD TESTING RESULTSBackground Papers · PDF24 Sept 2025View
APPENDIX 7 GROUND GAS MONITORING RESULTSBackground Papers · PDF24 Sept 2025View
APPENDIX 8 UNITED UTILITIES RISK ASSESSMENT FOR WATER PIPESBackground Papers · PDF24 Sept 2025View
APPENDIX 9 SDL4842 DUKINFIELD - D&G COMPLETION REPORTBackground Papers · PDF24 Sept 2025View
CONSULTATION RESPONSE - CONTAMINATED LANDConsultee Comment · PDF5 Sept 2025View
PROPOSED LEVELS & CONTOURS LAYOUTDrawings · PDF5 Sept 2025View
S278 WORKSDrawings · PDF5 Sept 2025View
S278 WORKS HIGHWAYS CONSTRUCTION DETAILSDrawings · PDF5 Sept 2025View
HIGHWAYS PHASING PLANBackground Papers · PDF5 Sept 2025View
BELOW GROUND DRAINAGEDrawings · PDF5 Sept 2025View
BELOW GROUND DRAINAGE STRATEGY A1 WITH APPENDICESBackground Papers · PDF5 Sept 2025View
MATERIAL SCHEDULEBackground Papers · PDF3 Sept 2025View
PHASE 1 & PHASE 2 GEOENVIRONMENTAL SITE INVESITGATION REPORT ST LUKE'S CHURCH DUBackground Papers · PDF29 Aug 2025View
CONSULTATION RESPONSE - LHAConsultee Comment · PDF8 Aug 2025View
CONSULTATION RESPONSE - LHAConsultee Comment · PDF8 Aug 2025View
CONSULTATION RESPONSE - LHAConsultee Comment · PDF8 Aug 2025View
CONSULTATION RESPONSE - LHAConsultee Comment · PDF8 Aug 2025View
CONSULTATION RESPONSE - COALConsultee Comment · PDF5 Aug 2025View
DEMOLITION CONSTRUCTION ENVIRONMENT MANAGEMENT PLANBackground Papers · PDF29 Jul 2025View
CONSULTATION RESPONSE - GMEUConsultee Comment · PDF28 Jul 2025View
S278 WORKS HIGHWAYS CONSTRUCTION DETAILSDrawings · PDF21 Jul 2025View
S278 WORKS BUS STOP RELOCATIONDrawings · PDF21 Jul 2025View
SITE INVESTIGATION APPENDICES 14.07.2025Background Papers · PDF15 Jul 2025View
RETAINING WALL STRUCTUREDrawings · PDF2 Jul 2025View
ESTIMATE - STEEL FRAME HOMESBackground Papers · PDF2 Jul 2025View
VE GROUTING GRIDDrawings · PDF2 Jul 2025View
CONSULTATION RESPONSE - COALConsultee Comment · PDF17 Jun 2025View
CONSULTATION RESPONSE - CONTAMINATED LANDConsultee Comment · PDF16 Jun 2025View
CONSULTATION RESPONSE - TFGMConsultee Comment · PDF13 Jun 2025View
CONSULTATION RESPONSE - TFGMConsultee Comment · PDF11 Jun 2025View
BAT REPORTBackground Papers · PDF9 Jun 2025View
BAT SURVEYBackground Papers · PDF9 Jun 2025View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANBackground Papers · PDF4 Jun 2025View
STONE SAMPLE FOR WINDOW HEADSBackground Papers3 Jun 2025View
CONSULTATION RESPONSE - GMAASConsultee Comment · PDF29 May 2025View
BRICK SAMPLEBackground Papers · PDF28 May 2025View
MATERIAL DETAILS SCHEDULE CONDITION 3 & 14 - REV:02Background Papers · PDF27 May 2025View
DETAILS OF STREET LIGHTING (BOLLARDS & LAMP POSTS) - CONDITION 4.6Background Papers · PDF27 May 2025View
S278 WORKS BUS STOP RELOCATIONDrawings · PDF27 May 2025View
TYPICAL CELLULAR ATTENUATION TANKDrawings · PDF27 May 2025View
TYPICAL BELOW GROUND DRAINAGE DETAILSDrawings · PDF27 May 2025View
TYPICAL BELOW GROUND DRAINAGE DETAILSDrawings · PDF27 May 2025View
S278 WORKS HIGHWAYS CONSTRUCTION DETAILSDrawings · PDF27 May 2025View
PHOTOGRAPHIC LOCATIONSDrawings · PDF27 May 2025View
APPLICATION FORMApplication Form · PDF27 May 2025View
KING STREET ROAD CONDITION SURVEYBackground Papers · PDF27 May 2025View
DISCHARGE OF CONDITIONS 23 & 27 23/00971/FUL PROJECT REF:RHE.3589Background Papers · PDF27 May 2025View
BUILDING RECORDING AND WATCHING BRIEF WSIBackground Papers · PDF27 May 2025View
ST LUKES CHURCH, KINGS STREET BELOW GROUND DRAINAGE STRATEGY 2024 MAN 11157Background Papers · PDF27 May 2025View
GEOENVIRONMENTAL SITE INVESTIGATION APPENDICES 1-6 (2 OF 2)Background Papers · PDF27 May 2025View
GEOENVIRONMENTAL SITE INVESTIGATION REPORT (1 OF 2)Background Papers · PDF27 May 2025View
LOCATION PLANDrawings · PDF27 May 2025View
PROPOSED SITE PLANDrawings · PDF27 May 2025View
ITEMS RELOCATION EMAILSCorrespondence · PDF27 May 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
DECISION NOTICE

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.