Council planning record

Full discharge of Condition 4 (Operating Hours), Condition 7 (Windows) Condition 9 (Noise Mitigation Measures), Condition 10 (Sound Proofing), Condition 12 (Waste Storage), Condition 13 (CLS2B Screening Form), Condition 14 (Cycle Storage) and Condition 15 (Biodiversity) of planning reference 23/00797/FUL

1 Old Street Ashton-under-lyne Tameside OL6 6LA

DecidedReference: 25/00015/PLCONDTameside Metropolitan Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Formal Discharge Of Planning Conditions
Received
24 Feb 2025
Validated
24 Feb 2025
Determination deadline
19 May 2025
Local authority
Tameside Metropolitan Borough Council

Application overview

Full discharge of Condition 4 (Operating Hours), Condition 7 (Windows) Condition 9 (Noise Mitigation Measures), Condition 10 (Sound Proofing), Condition 12 (Waste Storage), Condition 13 (CLS2B Screening Form), Condition 14 (Cycle Storage) and Condition 15 (Biodiversity) of planning reference 23/00797/FUL

Proposal details

Reference
25/00015/PLCOND
Alternative references
PP-13798768
Ward
Ashton-under-Lyne St Peters
Parish
Ashton-under-lyne
Agent
Saleem Architects

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

1 Old Street Ashton-under-lyne Tameside OL6 6LA

This record has no verified map location.

View council map

Documents 24 of 24

DocumentPublishedAction
DECISION NOTICEDecision · PDF2 Oct 2025View
BAT BOXES AND LANDSCAPINGRevised Drawings · PDF10 Jun 2025View
WASTE STORAGERevised Drawings · PDF10 Jun 2025View
CONSULTATION RESPONSE - CONTAMINATED LANDConsultee Comment · PDF12 May 2025View
COAL MINING REPORTBackground Papers · PDF1 May 2025View
CLS2B FORMBackground Papers · PDF1 May 2025View
PHOTOOther1 May 2025View
BIRD AND BAT BOXESDrawings · PDF17 Apr 2025View
ACOUSTIC-VENTILATORSBackground Papers · PDF17 Apr 2025View
BIRD AND BAT BOXESBackground Papers · PDF25 Mar 2025View
CONSULTATION RESPONSE - ENVIRO SERVICESConsultee Comment · PDF19 Mar 2025View
CONSULTATION RESPONSE - CONTAMINATED LANDConsultee Comment · PDF12 Mar 2025View
CONSULTEE COMMENT - GMEUConsultee Comment · PDF12 Mar 2025View
WASTE STORAGEBackground Papers · PDF28 Feb 2025View
CONSULTATION RESPONSE - LHAConsultee Comment · PDF27 Feb 2025View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF24 Feb 2025View
C4 - OPERATING HOURS FOR COMMERCIAL P01Background Papers · PDF24 Feb 2025View
C7 - WINDOWS / P01 DETAILSBackground Papers · PDF24 Feb 2025View
C9 - NOISE MITIGATION MEASURES / P01 - ELEVATIONSBackground Papers · PDF24 Feb 2025View
C10 -SOUNDPROOFING PARTY WALLS/FLOOR / P01Drawings · PDF24 Feb 2025View
SITE CHECK ASSESSMENTBackground Papers · PDF24 Feb 2025View
C15 - BIO DIVERSITY - BAT BOXES / P01Background Papers · PDF24 Feb 2025View
C14 - CYCLE STORAGE / P01Background Papers · PDF24 Feb 2025View
CLS2B CONTAMINATED LAND FORM P01Background Papers · PDF24 Feb 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Approve
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.