Council planning record

Full discharge of Condition 3 (Contaminated Land), Condition 4 (Highways), Condition 7 (Secured Cycle Storage) and Condition 8 (Surface Water Drainage Scheme) of planning reference 22/00619/FUL

Redfern Industrial Estate Dawson Street Hyde Tameside

DecidedReference: 23/00048/PLCONDTameside Metropolitan Borough Council

Last published check: 30 Sept 2026, 09:49. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source

Application summary

Status
Decided
Application type
Formal Discharge Of Planning Conditions
Received
2 May 2023
Validated
2 May 2023
Determination deadline
25 Jul 2023
Local authority
Tameside Metropolitan Borough Council

Application overview

Full discharge of Condition 3 (Contaminated Land), Condition 4 (Highways), Condition 7 (Secured Cycle Storage) and Condition 8 (Surface Water Drainage Scheme) of planning reference 22/00619/FUL

Proposal details

Reference
23/00048/PLCOND
Alternative references
PP-12129159
Ward
Hyde Werneth
Parish
Hyde

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Redfern Industrial Estate Dawson Street Hyde Tameside

This record has no verified map location.

View council map

Documents 18 of 18

DocumentPublishedAction
CONTAMINATED LAND WATCHING BRIEFReport · PDF31 May 2024View
DECISION NOTICEDecision · PDF8 Feb 2024View
CONSULTATION RESPONSE - CONTAMINATED LANDConsultee Comment · PDF30 Jan 2024View
CONSULTEE COMMENT - CONTAMINATED LANDConsultee Comment · PDF2 Oct 2023View
CONSULTEE COMMENT - CONTAMINATED LANDConsultee Comment · PDF21 Jul 2023View
CONSULTEE COMMENT - CONTAMINATED LANDConsultee Comment · PDF21 Jul 2023View
PROPOSED DRAINAGEDrawings · PDF28 Jun 2023View
CONSULTEE COMMENT - CONTAMINATED LANDConsultee Comment · PDF8 Jun 2023View
APPENDIX 2 GEOTECHNICAL TESTING RESULTSBackground Papers · PDF8 Jun 2023View
APPENDIX 3 CHEMICAL TESTING RESULTSBackground Papers · PDF8 Jun 2023View
APPENDIX 4 MONITORING DATABackground Papers · PDF8 Jun 2023View
APPENDIX 5 SOIL WASTE ASSESSMENTBackground Papers · PDF8 Jun 2023View
PHASE 1 PRELIMINARY RISK ASSESSMENTBackground Papers · PDF8 Jun 2023View
SITE INVESTIGATION REPORTBackground Papers · PDF8 Jun 2023View
APPENDIX 1 EXPLORATORY HOLE LOGSBackground Papers · PDF8 Jun 2023View
CONSULTATION RESPONSE - LLFAConsultee Comment · PDF15 May 2023View
APPLICATION FORM - WITHOUT PERSONAL DATAApplication Form · PDF2 May 2023View
PROPOSED DRAINAGE STRATEGY WITH LOCATION PLANDrawings · PDF2 May 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Refuse
DECISION NOTICE
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.