Council planning record

Approval of details required by conditions 3 (road works), 4 (temp vehicle facilities), 5 (lighting), 6 (drainage and surfacing), 7 (CCTV) and 10 (materials) of 12/00102/FUL - Metrolink Park and Ride Facility at Ashton Moss Station

Ashton Moss Metrolink Station Gardeners Way Ashton-Under-Lyne Tameside

Awaiting decisionReference: 13/00023/PLCONDTameside Metropolitan Borough Council

Application location

Ashton Moss Metrolink Station Gardeners Way Ashton-Under-Lyne Tameside

This record has no verified map location.

View council map

Application summary

Status
Awaiting decision
Application type
Formal Discharge Of Planning Conditions
Received
27 Mar 2013
Validated
3 Apr 2013
Determination deadline
26 Jun 2013
Local authority
Tameside Metropolitan Borough Council

Application overview

Approval of details required by conditions 3 (road works), 4 (temp vehicle facilities), 5 (lighting), 6 (drainage and surfacing), 7 (CCTV) and 10 (materials) of 12/00102/FUL - Metrolink Park and Ride Facility at Ashton Moss Station

Proposal details

Reference
13/00023/PLCOND
Alternative references
PP-02537555
Ward
Audenshaw
Parish
Ashton-under-lyne
Agent
MPact-Thales

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 26 of 26

DocumentPublishedAction
Condition 10 - Finish to substation building exampleBackground Papers · PDF17 Apr 2013View
Condition 5 Submission - Lighting CalculationBackground Papers · PDF17 Apr 2013View
Condition 7 - CCTV Camera Positions Coverage Overview 2 of 2Background Papers · PDF17 Apr 2013View
Condition 10 - Finish to TSS compound fence and gate exampleBackground Papers · PDF17 Apr 2013View
Condition 10 - Finish to DNO Cabinet ExampleBackground Papers · PDF17 Apr 2013View
Condition 7 - CCTV Camera Positions Coverage Cameras 10-11Background Papers · PDF17 Apr 2013View
Condition 7 - CCTV Camera Positions Coverage Overview 1 of 2Background Papers · PDF17 Apr 2013View
Condition3 - Decision Notice 09/00963/FULBackground Papers · PDF17 Apr 2013View
Condition 7 - CCTV Camera Coverage 1-9Background Papers · PDF17 Apr 2013View
Condition 3 - Submission Notice 1000074/PLCONDBackground Papers · PDF17 Apr 2013View
Condition 6 - Cross Section 3Drawings · PDF16 Apr 2013View
Condition 6 - Cross Section 4Drawings · PDF16 Apr 2013View
Condition 6 - Drainage SheetDrawings · PDF16 Apr 2013View
Condition 5 submission - Street Lighting SheetDrawings · PDF16 Apr 2013View
Condition 6 submission - urban realm and landscapeDrawings · PDF16 Apr 2013View
Condition 10 submission - Substation compound typical detailsDrawings · PDF16 Apr 2013View
Condition 6 - Cross Section 2Drawings · PDF16 Apr 2013View
Location mapDrawings · PDF16 Apr 2013View
Condition 10 - typical phase 4b traction substationDrawings · PDF16 Apr 2013View
Condition 6 submission - longitudinal sectionsDrawings · PDF16 Apr 2013View
Condition 10 submission - gpr enclosure general arrangment detailsDrawings · PDF16 Apr 2013View
Street Lighting ContoursDrawings · PDF16 Apr 2013View
Condition 6 - Cross Section 1Drawings · PDF16 Apr 2013View
Condition 6 -Kerbing And EdgingDrawings · PDF16 Apr 2013View
Condition 6 submission - Park and Ride Highway ConstructionDrawings · PDF4 Apr 2013View
Application Form And CertificateApplication Form · PDF28 Mar 2013View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Decision not yet published
Condition3 - Decision Notice 09/00963/FUL
Planning conditions

We haven’t collected any decision conditions for this application.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.