Council planning record

Conversion of existing two storey buildings and extension to form new factoryConstruction of two new light industrial units

Land Opposite 7 South Street Ashton-Under-Lyne Tameside

DecidedReference: 12/00435/FULTameside Metropolitan Borough Council

Last published check: 9 Oct 2026, 23:16. Check the council record for more recent changes.

Application location

Land Opposite 7 South Street Ashton-Under-Lyne Tameside

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
30 Apr 2012
Validated
19 Jun 2012
Determination deadline
14 Aug 2012
Local authority
Tameside Metropolitan Borough Council

Application overview

Conversion of existing two storey buildings and extension to form new factoryConstruction of two new light industrial units

Proposal details

Reference
12/00435/FUL
Alternative references
PP-01901402
Ward
Ashton-under-Lyne St Peters
Parish
Ashton-under-lyne
Agent
Bruce And Bruce

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 15 of 15

DocumentPublishedAction
ElevationsDrawings · PDF21 Aug 2012View
Gen arrangement Ground and First FloorDrawings · PDF7 Aug 2012View
Elevations (amended)Drawings · PDF7 Aug 2012View
Design and Access statement (amended)Background Papers7 Aug 2012View
Site Location Plan (Amended)Drawings · PDF7 Aug 2012View
Site plan (Amended)Drawings · PDF7 Aug 2012View
Existing ElevationsDrawings · PDF10 Jul 2012View
Existing LayoutDrawings · PDF10 Jul 2012View
Proposed ElevationsDrawings · PDF10 Jul 2012View
Design and access statementBackground Papers1 May 2012View
General Arrangement Ground and First Floor PlansDrawings · PDF1 May 2012View
Location mapDrawings · PDF1 May 2012View
Proposed Plans And Elevations - Unit BDrawings · PDF1 May 2012View
Application form + CertificateApplication Form · PDF1 May 2012View
Proposed Site PlanDrawings · PDF1 May 2012View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Decision Issued Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Application Withdrawn
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.