Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Former Power Station And Land Running Parallel With Printworks Road And River Tame Spring Bank Lane Stalybridge Tameside
Former Power Station And Land Running Parallel With Printworks Road And River Tame Spring Bank Lane Stalybridge Tameside
This record has no verified map location.
View council mapHybrid Planning Application consisting of the construction of a new road running from Grove Road to Wakefield Road (Alternative A - diversion of Springbank, Alternative B - creation of new road alongside Printworks Road) and Outline consent for the erection of 38no. houses on the former Hartshead Power Station
Sign in to view all collected council fields and recorded changes.
Sign in to view collected details| Document | Published | Action |
|---|---|---|
| Rural Park Works - Specification PlanDrawings · PDF | 2 Nov 2011 | View |
| Proposed Springbank Lane Improvement / Cross Valley Route Cross SectionsDrawings · PDF | 2 Nov 2011 | View |
| Existing condition of Printworks RoadDrawings · PDF | 2 Nov 2011 | View |
| Tree SurveyDrawings · PDF | 2 Nov 2011 | View |
| Planning Statement - Road Improvements to Springbank LaneBackground Papers · PDF | 2 Nov 2011 | View |
| Proposed Springbank Lane Realignment And Improvements And Residential LayoutDrawings · PDF | 2 Nov 2011 | View |
| Part of printworks road to be closed to vehicular trafficDrawings · PDF | 2 Nov 2011 | View |
| Transportation StatementBackground Papers · PDF | 2 Nov 2011 | View |
| Arboricultural ReportBackground Papers · PDF | 2 Nov 2011 | View |
| Existing condition of The Cross Valley RouteDrawings · PDF | 2 Nov 2011 | View |
| Location and Existing Layout PlanDrawings · PDF | 2 Nov 2011 | View |
| Existing Power Cable LocationsDrawings · PDF | 2 Nov 2011 | View |
| Site DescriptionBackground Papers · PDF | 2 Nov 2011 | View |
| Site Topographical SurveyDrawings · PDF | 2 Nov 2011 | View |
| Tree SurveyDrawings · PDF | 2 Nov 2011 | View |
| Flood Risk AssessmentBackground Papers · PDF | 2 Nov 2011 | View |
| Arboricultural ReportBackground Papers · PDF | 2 Nov 2011 | View |
| Masterplan - Proposed rural park and residential areas A and BDrawings · PDF | 2 Nov 2011 | View |
| Proposed Springbank Lane Improvement / Cross Valley route alternative - along existing raceDrawings · PDF | 2 Nov 2011 | View |
| Design and access statement and Sustainability StatementBackground Papers · PDF | 2 Nov 2011 | View |
Documents open on the council website. Browse council documents if a link has changed.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceA published target or deadline. It does not confirm an outcome.
Council sourceConditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.