Council planning record

Construction of two buildings for the housing of process plant and CHP and the storage of wood biomass fuel together with ancillary administrative facilities including offices incorporating a learning centre

Land On The East Side Of Lumm Farm Lumb Lane Droylsden Tameside M43 7LB

DecidedReference: 11/00745/FULTameside Metropolitan Borough Council

Application location

Land On The East Side Of Lumm Farm Lumb Lane Droylsden Tameside M43 7LB

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Full Planning Permission
Received
26 Aug 2011
Validated
26 Oct 2011
Determination deadline
25 Jan 2012
Local authority
Tameside Metropolitan Borough Council

Application overview

Construction of two buildings for the housing of process plant and CHP and the storage of wood biomass fuel together with ancillary administrative facilities including offices incorporating a learning centre

Proposal details

Reference
11/00745/FUL
Alternative references
PP-01610139
Ward
Droylsden East
Parish
Droylsden
Agent
A L P Ambrose Minerals Planning

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 28 of 28

DocumentPublishedAction
Ventilation Statement (received 17/10/11)Background Papers · PDF13 Oct 2011View
Lighting Design and Assessment (received 29/9/11)Background Papers · PDF13 Oct 2011View
Habitat Survey Report Phase 1 (received 7/10/11)Background Papers · PDF13 Oct 2011View
Lighting Design Plan (received 29/9/11)Drawings · PDF13 Oct 2011View
Crime Impact Statement (received 26/9/11)Background Papers · PDF27 Sept 2011View
Community Involvement Statement (received 26/9/11)Background Papers · PDF27 Sept 2011View
Transport Statement (received 26/9/11)Background Papers · PDF27 Sept 2011View
Noise Assessment (received 26/9/11)Background Papers · PDF27 Sept 2011View
Utilities Statement (received 26/9/11)Background Papers · PDF27 Sept 2011View
Renewable Energy Statement (received 26/9/11)Background Papers · PDF27 Sept 2011View
Annex 6 (received 26/9/11)Background Papers · PDF27 Sept 2011View
Materials colour specificationBackground Papers · PDF30 Aug 2011View
Interceptor DetailsBackground Papers · PDF30 Aug 2011View
Design and Access StatementBackground Papers · PDF30 Aug 2011View
Nature ConservationBackground Papers · PDF30 Aug 2011View
Modular Unit SpecificationBackground Papers · PDF30 Aug 2011View
Company InformationBackground Papers · PDF30 Aug 2011View
Planning StatementBackground Papers · PDF30 Aug 2011View
Proposed site layoutDrawings · PDF26 Aug 2011View
Proposed Landscape PlanDrawings · PDF26 Aug 2011View
Location PlanDrawings · PDF26 Aug 2011View
Boundary Fence DetailsDrawings · PDF26 Aug 2011View
Site Drainage PlanDrawings · PDF26 Aug 2011View
Site LocationDrawings · PDF26 Aug 2011View
Roof PlansDrawings · PDF26 Aug 2011View
Site Contour PlanDrawings · PDF26 Aug 2011View
Elevations - Wood Fuel process buildingDrawings · PDF26 Aug 2011View
Elevations - wood fuel drying and CHP buildingDrawings · PDF26 Aug 2011View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Decision Issued Date

    Published milestoneCouncil source

Decision & conditions

Approve
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.