Council planning record

Works to Mumbles Pier, including the erection of 2no new pavilion buildings, the refurbishment & adaption of the former off-shore lifeboat house for restaurant use and the replacement of the existing access bridge to the former off-shore lifeboat house and erection of gates at pier entrance (application for Listed Building Consent) - Variation of condition 1 of Listed Building Consent 2019/0563/LBC to extend the time in which to commence works

Mumbles Pier Access Road From Mumbles Road To Lifeboat Station And Pier Mumbles Swansea SA3 4EN

Being ConsideredReference: 2026/0453/S99Swansea Council

Last published check: 28 Sept 2026, 01:45. Check the council record for more recent changes.

Application location

Mumbles Pier Access Road From Mumbles Road To Lifeboat Station And Pier Mumbles Swansea SA3 4EN

This record has no verified map location.

View council map

Application summary

Status
Being Considered
Application type
Listed Building and Conservation Areas
Received
18 Mar 2026
Validated
25 Mar 2026
Determination deadline
20 May 2026
Local authority
Swansea Council

Application overview

Works to Mumbles Pier, including the erection of 2no new pavilion buildings, the refurbishment & adaption of the former off-shore lifeboat house for restaurant use and the replacement of the existing access bridge to the former off-shore lifeboat house and erection of gates at pier entrance (application for Listed Building Consent) - Variation of condition 1 of Listed Building Consent 2019/0563/LBC to extend the time in which to commence works

Proposal details

Reference
2026/0453/S99
Alternative references
PP-14722407
Ward
Mumbles - Area 2
Parish
Mumbles Community Council
Agent
Geraint John Planning Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
Datganiad i'r Wasg - Press NoticeDatganiad i'r Wasg - Press Notice · PDF1 Apr 2026View
HERITAGE IMPACT ASSESSMENTDogfen Gyfredol - Current Document · PDF25 Mar 2026View
Llythyr Cydnabyddiaeth -Acknowledgement LetterLlythyr Cydnabyddiaeth -Acknowledgement Letter · PDF25 Mar 2026View
Datganiad i'r Wasg - Press NoticeDatganiad i'r Wasg - Press Notice · PDF25 Mar 2026View
APPLICATIONFORMREDACTEDDogfen Gyfredol - Current Document · PDF18 Mar 2026View
SITE LOCATION PLANDogfen Gyfredol - Current Document · PDF18 Mar 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Last Advertised In Press Date

    Published milestoneCouncil source
  5. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Being Considered

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.