Council planning record

Redevelopment of Vivian and Musgrave Engine Houses and Chimneys, including restoration and intervention works, with new link building - Discharge of condition 6 (various details) of planning permission 2024/1662/LBC approved 27th January 2025

Vivian Engine House Neath Road Landore Swansea SA1 2LE

Being ConsideredReference: 2026/0122/DOCSwansea Council

Last published check: 27 Sept 2026, 21:17. Check the council record for more recent changes.

Application location

Vivian Engine House Neath Road Landore Swansea SA1 2LE

This record has no verified map location.

View council map

Application summary

Status
Being Considered
Application type
Discharge of Conditions
Received
27 Jan 2026
Validated
27 Jan 2026
Determination deadline
24 Mar 2026
Local authority
Swansea Council

Application overview

Redevelopment of Vivian and Musgrave Engine Houses and Chimneys, including restoration and intervention works, with new link building - Discharge of condition 6 (various details) of planning permission 2024/1662/LBC approved 27th January 2025

Proposal details

Reference
2026/0122/DOC
Alternative references
PP-14655253
Ward
Landore - Area 1
Agent
GWP Architecture

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 54 of 54

DocumentPublishedAction
Llythyr Cydnabyddiaeth -Acknowledgement LetterLlythyr Cydnabyddiaeth -Acknowledgement Letter · PDF2 Feb 2026View
APPLICATIONFORMREDACTEDDogfen Gyfredol - Current Document · PDF27 Jan 2026View
SITE LOCATION PLANDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE DOMESTIC WATER SERVICES LAYOUT GROUND LEVELDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE DOMESTIC WATER SERVICES LAYOUT - BASEMENT LEVELDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE BUILDERS WORK - BASEMENT LEVELDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE BUILDERS WORK - GROUND LEVELDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE VENTILATION SERVICES LAYOUT - HIGH LEVELDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE HEATING SERVICES LAYOUT - GROUND FLOORDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE BUILDERS WORK - GROUND FLOORDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE MAINS COLD WATER SERVICES LAYOUT - BASEMENTDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE HEATING SERVICES LAYOUT - BASEMENTDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE BUILDERS WORK - BASEMENTDogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-SOUTH EAST ENTRANCE STAIR PLANDogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-WEST ENTRANCE PLATFORM STAIR NO. 1 PLANDogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-WEST ENTRANCE PLATFORM STAIR NO.2 PLANDogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-NORTH ENTRANCE RAMP PLANDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE - SOUTH-EAST ESCAPE STAIR PLANDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE-INTERNAL STAIR SECTIONSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE-CONDITION & REPAIR WORKSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE-WINDOW SCHEDULEDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE - SECONDARY GLAZING ELEVATIONSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE - WINDOW SCHEDULEDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE - WINDOW ELEVATIONS 2 0F 2Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE - SECONDARY GLAZING ELEVATIONSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE - EXTERNAL DOOR ELEVATIONS (1 OF 3)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE - EXTERNAL DOOR ELEVATIONS (2 OF 3)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE - EXTERNAL DOOR ELEVATIONS (3 OF 3)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE - EXTERNAL DOOR ELEVATIONSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE - INTERNAL DOOR ELEVATIONSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE NEW ENTRANCE DOOR HEAD & THRESHOLD DETAILDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE NEW ENTRANCE DOOR OVERLIGHT HEAD & CILL DETAILDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE NEW ENTRANCE DOOR & OVERLIGHT JAMB DETAILSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE TYPICAL TIMBER JAMB DETAIL (WITH SECONDARY GLAZING)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE NEW TYPICAL DOOR HEAD & THRESHOLD DETAILDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE NEW TYPICAL DOOR JAMB DETAILDogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE TYPICAL TIMBER WINDOW WITH SECONDARY GLAZING (TYPE 1)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE TYPICAL TIMBER WINDOW WITH SECONDARY GLAZING (TYPE 2)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE NEW INTERNAL DOOR HEAD & THRESHOLD DETAILDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE NEW EXTERNAL DOOR HEAD & THRESHOLD DETAILDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE NEW INTERNAL & EXTERNAL DOOR JAMB DETAILSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE TYPICAL TIMBER WINDOW HEAD & CILL (WITH SECONDARY GLAZING)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE TYPICAL TIMBER WINDOW JAM DETAILS (WITH SECONDARY GLAZING)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG - SOUTH-EAST ENTRANCE STAIR SECTIONS & ELEVATIONSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-WEST ENTRANCE PLATFORM STAIR SECTIONS & ELEVATIONS (1 OF 2)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-WEST ENTRANCE PLATFORM STAIR SECTIONS & ELEVATIONS (2 OF 2)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-NORTH ENTRANCE RAMP SECTIONS & ELEVATIONS (1 OF 2)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
LINK BLDG-NORTH ENTRANCE RAMP SECTIONS & ELEVATIONS (2 OF 2)Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
MUS HSE-SOUTH-EAST ESCAPE STAIR ELEVATIONSDogfen Gyfredol - Current Document · PDF27 Jan 2026View
VIV HSE-INTERNAL STAIR PLANDogfen Gyfredol - Current Document · PDF27 Jan 2026View
FASTCLAMP CATALOGUEDogfen Gyfredol - Current Document · PDF27 Jan 2026View
SECTION 3Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
V&M NOTES & SPECIFICATION SHEET 2 OF 2Dogfen Gyfredol - Current Document · PDF27 Jan 2026View
CONDITION 6 DETAILSDogfen Gyfredol - Current Document · PDF27 Jan 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Standard Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Being Considered

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.