Non Material Amendment to 18/502190/EIHYB: Phase 1 North - Erection of 91 dwellings accessed from Grovehurst Road, public open and amenity space (including an equipped children's play area) together with associated landscaping and ecological enhancement works, acoustic barrier to the A249, internal access roads, footpaths, cycleways and parking, drainage (including infiltration basins and tanked permeable paving), utilities and service infrastructure works. Full Planning Application - Phase 1 South - Erection of 257 dwellings (including 35 affordable dwellings) accessed from Quinton Road, public open and amenity space, together with associated landscaping and ecological enhancement works, internal access roads, footpaths, cycleways and parking, drainage (including infiltration swales, ring soakaways, and permeable paving), utilities and service infrastructure works.Outline Planning Application - for up to 852 new dwellings (including 10% affordable housing), a site of approximately 10 ha for a secondary and primary school, a mixed use local centre, including land for provision of a convenience store, public open and amenity space (including equipped children's play areas), together with associated landscaping and ecological enhancement works, acoustic barrier to the A249, internal access roads, footpaths, cycleways and parking, drainage (including a foul water pumping station and sustainable drainage systems), utilities and service infrastructure. All matters reserved - a series of minor amendments to the approved site layout and house types through amendments to the approved plans. The minor layout change is to allow the addition of a required substation to be situated south of the Plots at 245-246 and to replace affordable housing types so that they now comply with Part M4.2 of the Building Regulations.
Land North Quinton Road Sittingbourne Kent ME10 2SX
Non Material Amendment to 18/502190/EIHYB: Phase 1 North - Erection of 91 dwellings accessed from Grovehurst Road, public open and amenity space (including an equipped children's play area) together with associated landscaping and ecological enhancement works, acoustic barrier to the A249, internal access roads, footpaths, cycleways and parking, drainage (including infiltration basins and tanked permeable paving), utilities and service infrastructure works. Full Planning Application - Phase 1 South - Erection of 257 dwellings (including 35 affordable dwellings) accessed from Quinton Road, public open and amenity space, together with associated landscaping and ecological enhancement works, internal access roads, footpaths, cycleways and parking, drainage (including infiltration swales, ring soakaways, and permeable paving), utilities and service infrastructure works.Outline Planning Application - for up to 852 new dwellings (including 10% affordable housing), a site of approximately 10 ha for a secondary and primary school, a mixed use local centre, including land for provision of a convenience store, public open and amenity space (including equipped children's play areas), together with associated landscaping and ecological enhancement works, acoustic barrier to the A249, internal access roads, footpaths, cycleways and parking, drainage (including a foul water pumping station and sustainable drainage systems), utilities and service infrastructure. All matters reserved - a series of minor amendments to the approved site layout and house types through amendments to the approved plans. The minor layout change is to allow the addition of a required substation to be situated south of the Plots at 245-246 and to replace affordable housing types so that they now comply with Part M4.2 of the Building Regulations.
Reference
26/504478/NMAMD
Alternative references
PP-15377997
Ward
Bobbing, Iwade And Lower Halstow
Parish
Bobbing
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.