Council planning record

T1 = AlderT2 = AlderT3 = PineT4 = PineAs per attached photos, taken during winter so not showing full extent of foliage and size, the work required as described below:T1, T2, T3, T4 all require branches to be cut back to property border and lopped.Top of trunk / crown of T1 leaning over into property so may need to be crowned.Reasons1. T3 has a very large branch that has been seen to swing dangerously during high winds.2. Small weaker branches from T1 and T2 breaking off in wind and hitting children playing in garden.3. Birds perched on overhanging, dropping mess, hitting children in garden and damaging property.4. All trees dropping excessive pine cones, needles and leaves damaging property.5. Excessive shading and low amenity value caused by all indicated trees.

18 Gomer Road Bagshot Surrey GU19 5DQ

DecidedReference: TWA/22/0213Surrey Heath Borough Council

Last published check: 8 Oct 2026, 08:28. Check the council record for more recent changes.

Application location

18 Gomer Road Bagshot Surrey GU19 5DQ

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Tree Works Application
Received
8 Aug 2022
Validated
30 Aug 2022
Determination deadline
25 Oct 2022
Local authority
Surrey Heath Borough Council

Application overview

T1 = AlderT2 = AlderT3 = PineT4 = PineAs per attached photos, taken during winter so not showing full extent of foliage and size, the work required as described below:T1, T2, T3, T4 all require branches to be cut back to property border and lopped.Top of trunk / crown of T1 leaning over into property so may need to be crowned.Reasons1. T3 has a very large branch that has been seen to swing dangerously during high winds.2. Small weaker branches from T1 and T2 breaking off in wind and hitting children playing in garden.3. Birds perched on overhanging, dropping mess, hitting children in garden and damaging property.4. All trees dropping excessive pine cones, needles and leaves damaging property.5. Excessive shading and low amenity value caused by all indicated trees.

Proposal details

Reference
TWA/22/0213
Alternative references
TPO 06/00 Group G7
Ward
Bagshot

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 6 of 6

DocumentPublishedAction
DecisionDecision · PDF4 Oct 2022View
LOCATION PLANPlans30 Aug 2022View
APPLICATION FORMApplication Form Redacted PDF · PDF30 Aug 2022View
TRUNK OF TREE GROWING AT ANGLE OVER BOUNDARYPhoto8 Aug 2022View
VERY LARGE PINE BRANCH COMING INTO BOUNDARYPhoto8 Aug 2022View
WIDE VIEW OF TREESPhoto8 Aug 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Decision Issued Date

    Published milestoneCouncil source
  4. Decision Made Date

    Published milestoneCouncil source
  5. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Split Decision
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.