Council planning record

Submission of details to comply with Condition 24 (Construction Transport Management Plan) for phase 3 of 24/0703/PMR Hybrid planning application comprising: Full planning application for the erection of one industrial and logistics unit within Use Classes E(g)(iii), B2, and B8 together with access, parking and landscaping and Outline application (all matters reserved) for the erection of up to 19,000 sqm of flexible industrial and logistics floorspace within Use Classes E(g)(iii), B2, and B8 following demolition of existing buildings on land at Watchmoor Park) to reduce the provision of active fast charge sockets from 50% down to 20% active charge points and to update layout and parameter plans to reflect this change together with amendment to red line boundary.

Watchmoor Park Watchmoor Road Camberley Surrey

DecidedReference: 26/0741/DTCSurrey Heath Borough Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Standard Consultation Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Application summary

Status
Decided
Application type
Details to comply
Received
13 Aug 2026
Validated
13 Aug 2026
Determination deadline
8 Oct 2026
Local authority
Surrey Heath Borough Council

Application overview

Submission of details to comply with Condition 24 (Construction Transport Management Plan) for phase 3 of 24/0703/PMR Hybrid planning application comprising: Full planning application for the erection of one industrial and logistics unit within Use Classes E(g)(iii), B2, and B8 together with access, parking and landscaping and Outline application (all matters reserved) for the erection of up to 19,000 sqm of flexible industrial and logistics floorspace within Use Classes E(g)(iii), B2, and B8 following demolition of existing buildings on land at Watchmoor Park) to reduce the provision of active fast charge sockets from 50% down to 20% active charge points and to update layout and parameter plans to reflect this change together with amendment to red line boundary.

Proposal details

Reference
26/0741/DTC
Alternative references
PP-15144292
Ward
St Michaels
Agent
MSA

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Watchmoor Park Watchmoor Road Camberley Surrey

This record has no verified map location.

View council map

Documents 6 of 6

DocumentPublishedAction
DecisionDecision · PDF7 Oct 2026View
COUNTY HIGHWAY AUTHORITYConsultee Response · PDF1 Sept 2026View
APPLICATIONFORMREDACTEDApplication Form · PDF13 Aug 2026View
CTMPReport · PDF13 Aug 2026View
SCHEDULE OF CONDITIONSReport · PDF13 Aug 2026View
CONDITION 24 LETTERCorrespondence · PDF13 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

Grant
Decision

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.