Council planning record

Submission of details to comply with conditions 7 (external materials) 23 (visibility zones), 24 (pedestrian visibility splays), 25 (car parking), 26 (electric vehicle charging points), 27 (cycle parking), 31 (retained trees), 32 (hard and soft landscaping), 33 (Landscape Management Plan), 35 (Code for Sustainable Homes), 37 (refuse and recycling), 38 (water butt), 40 (surface water drainage),43 (foul sewerage), 55 (contaminated land) and 61 (construction environmental management plan) attached to 12/0546 as amended by 18/0619 and 18/1002 in respect of the Officers Mess (Phase 6e).

Princess Royal Barracks Brunswick Road Deepcut Camberley Surrey GU16 6RN

DecidedReference: 23/0956/DTCSurrey Heath Borough Council

Application location

Princess Royal Barracks Brunswick Road Deepcut Camberley Surrey GU16 6RN

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Details to comply
Received
11 Sept 2023
Validated
2 Oct 2024
Determination deadline
27 Nov 2024
Local authority
Surrey Heath Borough Council

Application overview

Submission of details to comply with conditions 7 (external materials) 23 (visibility zones), 24 (pedestrian visibility splays), 25 (car parking), 26 (electric vehicle charging points), 27 (cycle parking), 31 (retained trees), 32 (hard and soft landscaping), 33 (Landscape Management Plan), 35 (Code for Sustainable Homes), 37 (refuse and recycling), 38 (water butt), 40 (surface water drainage),43 (foul sewerage), 55 (contaminated land) and 61 (construction environmental management plan) attached to 12/0546 as amended by 18/0619 and 18/1002 in respect of the Officers Mess (Phase 6e).

Proposal details

Reference
23/0956/DTC
Alternative references
PP-12447602
Ward
Mytchett & Deepcut

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 146 of 146

DocumentPublishedAction
FROM APPLICANT CONFIRMING DETAILS TO BE APPROVEDCorrespondence · PDF16 Oct 2025View
DecisionDecision · PDF16 Oct 2025View
COVERING E-MAILCorrespondence · PDF15 Oct 2025View
SOUTHERN SANGS DRAINAGE LAYOUT IN SO FAR AS IT RELATES TO THE DRAINAGE CONNECTIOAmended Plans · PDF15 Oct 2025View
FROM APPLICANT CONFIRMING DETAILS TO BE APPROVEDCorrespondence · PDF10 Oct 2025View
SURREY WILDLIFE TRUSTConsultee Response · PDF9 Oct 2025View
SURREY WILDLIFE TRUST 2Consultee Response · PDF9 Oct 2025View
COPY OF SPECIFICATION FOR LEO CCT BOLLARD 1000MMAmended Plans · PDF7 Oct 2025View
COPY OF LUMINAIRE DATA ADJUSTABLE UPLIGHTCorrespondence · PDF7 Oct 2025View
COPY OF SPECIFICATION FOR GU10 ADJUSTABLE INGROUND UPLIGHTCorrespondence · PDF7 Oct 2025View
FOR INFORMATION MONITORING , MANAGEMENT AND MAINTENACNE OF THE BAT TOWERPlans · PDF7 Oct 2025View
COVERING E-MAILCorrespondence · PDF7 Oct 2025View
COUNTY HIGHWAY AUTHORITYConsultee Response · PDF6 Oct 2025View
SURREY WILDLIFE TRUSTConsultee Response · PDF24 Sept 2025View
COUNTY HIGHWAY AUTHORITY 2Consultee Response · PDF23 Sept 2025View
ENVIRONMENTAL HEALTHConsultee Response · PDF23 Sept 2025View
ARBORICULTURAL OFFICERConsultee Response · PDF23 Sept 2025View
COUNTY HIGHWAY AUTHORITY 1Consultee Response · PDF23 Sept 2025View
COVERING E-MAILCorrespondence · PDF19 Sept 2025View
EXTERNAL LIGHTING SCHEDULECorrespondence · PDF19 Sept 2025View
PROPOSED LANDSCAPING PLAN INC CAR AND CYCLE PARKING AND EV PROVISION AND LOCATIOAmended Plans · PDF19 Sept 2025View
EXTERNAL LIGHTING SCHEDULECorrespondence · PDF17 Sept 2025View
LIGHTING STATEMENTReport · PDF17 Sept 2025View
SPECIFICATION FOR GU10 ADJUSTABLE INGROUND UPLIGHTCorrespondence · PDF17 Sept 2025View
SPECIFICATION FOR LEO CCT BOLLARD 1000MMCorrespondence · PDF17 Sept 2025View
SPECIFICATION FOR ZEKER CCT SECURITY LIGHT PIR BLACKCorrespondence · PDF17 Sept 2025View
LUMINAIRE DATA ADJUSTABLE UPLIGHTCorrespondence · PDF17 Sept 2025View
COVERING E-MAILCorrespondence · PDF17 Sept 2025View
SUPERSEDED PROPOSED LANDSCAPING PLAN INC CAR AND CYCLE PARKING AND EV PROVISIONAmended Plans · PDF16 Sept 2025View
COVERING E-MAILCorrespondence · PDF16 Sept 2025View
LEAD LOCAL FLOOD AUTHORITYConsultee Response · PDF11 Sept 2025View
COVERING E-MAILCorrespondence · PDF8 Sept 2025View
CYCLE SHELTER ELEVATIONSAmended Plans · PDF8 Sept 2025View
BETWEEN CASE OFFICER AND LEAD LOCAL FLOOD AUTHORITY TO CONFIRM INFORMATION TO BCorrespondence · PDF5 Sept 2025View
UPPER AND LOWER POND DESIGNAmended Plans · PDF21 Aug 2025View
COUNTY HIGHWAY AUTHORITYConsultee Response · PDF19 Aug 2025View
PLANTING SCHEDULEAmended Report · PDF6 Aug 2025View
LANDSCAPE MANAGEMENT PLANAmended Report · PDF6 Aug 2025View
SUPERSEDED CYCLE SHELTER ELEVATIONSAmended Plans · PDF6 Aug 2025View
SUPERSEDED PROPOSED LANDSCAPING PLAN INC CAR AND CYCLE PARKING AND EV PROVISIONAmended Plans · PDF6 Aug 2025View
COVERING E-MAILCorrespondence · PDF6 Aug 2025View
SUPERSEDED PROPOSED LANDSCAPING PLANINC CAR AND CYCLE PARKING AND EV PROVISION AAmended Plans · PDF31 Jul 2025View
SUPERSEDED PROPOSED CYCLE STORES - ELEVATIONSAmended Plans · PDF31 Jul 2025View
COVERING E-MAILCorrespondence · PDF31 Jul 2025View
SUPERSEDED PROPOSED LANDSCAPING PLANINC CAR AND CYCLE PARKING AND EV PROVISION AAmended Plans · PDF10 Jul 2025View
COVERING E-MAILCorrespondence · PDF10 Jul 2025View
COUNTY HIGHWAY AUTHORITYConsultee Response · PDF4 Jul 2025View
LEAD LOCAL FLOOD AUTHORITYConsultee Response · PDF30 Jun 2025View
COVERING E-MAILCorrespondence · PDF30 Jun 2025View
EXTERNAL SURFACES SCHEDULECorrespondence · PDF30 Jun 2025View
ADDENDUM TO DRAINAGE REPORTCorrespondence · PDF13 Jun 2025View
SUPERSEDED LANDSCAPING PLAN INC CAR AND CYCLE PARKING AND EV PROVISION AND LOCATAmended Plans · PDF13 Jun 2025View
SUPERSEDED PROPOSED CYCLE STORES - ELEVATIONSAmended Plans · PDF13 Jun 2025View
SUPERSEDED PROPOSED BLOCK PLANAmended Plans · PDF13 Jun 2025View
COVERING E-MAILCorrespondence · PDF13 Jun 2025View
CONTAMINATED LAND OFFICERConsultee Response · PDF15 May 2025View
CONTAMINATED LAND OFFICER (CLARIFICATION)Consultee Response · PDF15 May 2025View
JOINT WASTE SOLUTIONSConsultee Response · PDF14 May 2025View
JOINT WASTE SOLUTIONSConsultee Response · PDF13 May 2025View
JOINT WASTE SOLUTIONSConsultee Response · PDF13 May 2025View
CONTAMINATION LETTER REPORTAmended Report · PDF9 May 2025View
COVERING E-MAILCorrespondence · PDF9 May 2025View
ARBORICULTURAL METHOD STATEMENTAmended Report · PDF30 Apr 2025View
LEAD LOCAL FLOOD AUTHORITYConsultee Response · PDF29 Apr 2025View
FROM APPLICANT IN RESPONSE TO JOINT WASTE SOLUTION CONSULTATION RESPONSECorrespondence · PDF29 Apr 2025View
COVERING E-MAILCorrespondence · PDF16 Apr 2025View
SURFACE WATER DRAINAGE REPORTAmended Report · PDF16 Apr 2025View
ARBORICULTURAL OFFICERConsultee Response · PDF31 Mar 2025View
COUNTY HIGHWAY AUTHORITYConsultee Response · PDF28 Mar 2025View
COVERING E-MAILCorrespondence · PDF26 Mar 2025View
SUPERSEDED PROPOSED LANDSCAPING PLAN INC CAR AND CYCLE PARKING AND EV PROVISIONAmended Plans · PDF26 Mar 2025View
JOINT WASTE SOLUTIONSConsultee Response · PDF25 Mar 2025View
SUPERSEDED PLANTING SCHEDULEAmended Report · PDF19 Mar 2025View
SUPERSEDED LANDSCAPE MANAGEMENT PLANAmended Report · PDF19 Mar 2025View
SUPERSEDED EXTERNAL SURFACES SCHEDULECorrespondence · PDF19 Mar 2025View
SUPERSEDED WARDALE CYCLE SHELTER SPECIFICATION SHEETCorrespondence · PDF19 Mar 2025View
SUPERSEDED PROPOSED LANDSCAPING PLAN INC CAR AND CYCLE PARKING AND EV PROVISIONAmended Plans · PDF19 Mar 2025View
COVERING E-MAILCorrespondence · PDF19 Mar 2025View
COUNTY HIGHWAY AUTHORITYConsultee Response · PDF13 Feb 2025View
OHME E-V CHARGING SPECIFICATIONReport · PDF13 Dec 2024View
SUPERSEDED PROPOSED LANDSCAPING PLAN INC CAR AND CYCLE PARKING AND EV PROVISIONAmended Plans · PDF13 Dec 2024View
COVERING E-MAILCorrespondence · PDF13 Dec 2024View
COUNTY HIGHWAY AUTHORITYConsultee Response · PDF10 Dec 2024View
JOINT WASTE SOLUTIONSConsultee Response · PDF24 Oct 2024View
THAMES WATERConsultee Response · PDF22 Oct 2024View
COVERING E-MAILCorrespondence · PDF21 Oct 2024View
GARAGE DOORPhoto · PDF21 Oct 2024View
JOINT WASTE SOLUTIONSConsultee Response · PDF17 Oct 2024View
COVERING E-MAIL LEAD LOCAL FLOOD AUTHORITYConsultee Response · PDF15 Oct 2024View
LEAD LOCAL FLOOD AUTHORITYConsultee Response · PDF15 Oct 2024View
ENVIRONMENTAL HEALTHConsultee Response · PDF15 Oct 2024View
CONTAMINATED LAND OFFICERConsultee Response · PDF14 Oct 2024View
TREE PROTECTION PLANPlans · PDF2 Oct 2024View
SITE LOCATION PLAN (OFFICERS MESS LICENCE PLAN)OS Extract · PDF2 Oct 2024View
SUPERSEDED EXTERNAL SURFACES SCHEDULECorrespondence · PDF2 Oct 2024View
SUPERSEDED PLANTING SCHEDULEReport · PDF2 Oct 2024View
FOR INFORMATION SITE WIDE (MINDENHURST) SURFACE WATER DRAINAGEPlans · PDF2 Oct 2024View
SUPERSEDED NEW SHEFFIELD CYCLE SHELTER SPECIFICATION SHEETPhoto · PDF2 Oct 2024View
SUPERSEDED ALLOCATION OF PARKING AND EV CHARGING POINTSReport · PDF2 Oct 2024View
LOGISTICS PLAN (CEMP)Plans · PDF2 Oct 2024View
LETTER OF RELIANCE FROM SURREY WILDLIFE TRUST ECOLOGICAL SERVICESCorrespondence · PDF2 Oct 2024View
OHME-EPOD DATASHEETPhoto · PDF2 Oct 2024View
SHEFFIELD CYCLE STAND SPECIFICATIONCorrespondence · PDF2 Oct 2024View
PROPOSED REFUSE STORE FLOOR PLANS AND ELEVATIONSPlans · PDF2 Oct 2024View
PROPOSED BLOCK PLANPlans · PDF2 Oct 2024View
OFFICERS MESS PROPOSED DRAINAGE CONNECTIONS WITH CONTOURSPlans · PDF2 Oct 2024View
OFFICERS MESS FACTUAL GROUND INVESTIGATION REPORTReport · PDF2 Oct 2024View
ROAD LAYOUT DEPICTING ROADS LORRIES CANNOT USE.Plans · PDF2 Oct 2024View
CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLANReport · PDF2 Oct 2024View
GENERAL ARRANGEMENT PLAN BRUNSWICK ROAD EAST (VISIBILITY ZONES AND SPLAYS)Plans · PDF2 Oct 2024View
WINDOW DETAILS LOGIK OVOLOPlans · PDF2 Oct 2024View
WINDOW DETAILS - MASTERFRAME - HERITAGE CROSS SECTIONPlans · PDF2 Oct 2024View
COVERING LETTERCorrespondence · PDF2 Oct 2024View
SHEFFIELD STAND SPECIFICATIONPhoto · PDF2 Oct 2024View
SUPERSEDED PROPOSED LANDSCAPE PLAN INC CAR AND CYCLE PARKING AND EV PROVISION ANPlans · PDF2 Oct 2024View
SUPERSEDED WARDALE CYCLE SHELTERPhoto · PDF2 Oct 2024View
SUPERSEDED LANDSCAPE MANAGEMENT PLANReport · PDF2 Oct 2024View
SUPERSEDED OFFICERS MESS LICENCE PLAN (FOR CONDITION 32)Plans · PDF2 Oct 2024View
SUPERSEDED LANDSCAPE SCHEDULECorrespondence · PDF2 Oct 2024View
TREE PROTECTION PLANPlans · PDF2 Oct 2024View
SUPERSEDED ARBORICULTURAL METHOD STATEMENTReport · PDF2 Oct 2024View
COPY OF DECISION NOTICE 23/0907/NMACorrespondence · PDF2 Oct 2024View
DOUBLE PATIO DOORPlans2 Oct 2024View
COVERING E-MAILCorrespondence · PDF2 Oct 2024View
PATIO DOOR FRAME SECTIONPlans · PDF2 Oct 2024View
EXTERNAL FRONT DOOR PICTUREPhoto2 Oct 2024View
SINGLE PATIO DOORPlans2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View
CERTIFICATE OF REOCCUPATIONCorrespondence · PDF2 Oct 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Standard Consultation Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Decision Made Date

    Published milestoneCouncil source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant
Decision COPY OF DECISION NOTICE 23/0907/NMA
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.