Council planning record

Submission of details to comply with conditions 40 (surface water drainage) and 41 (wetland features) attached to planning permission 12/0546 dated 4 April 2014 (as amended by 18/0619 dated 19 July 2019 and 18/1002 dated 14 November 2019) in respect of the Southern SANG (Phase 5a western area only)

Princess Royal Barracks Brunswick Road Deepcut Camberley Surrey GU16 6RN

DecidedReference: 23/0945/DTCSurrey Heath Borough Council

Last published check: 30 Sept 2026, 06:51. Check the council record for more recent changes.

Application location

Princess Royal Barracks Brunswick Road Deepcut Camberley Surrey GU16 6RN

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Details to comply
Received
8 Sept 2023
Validated
11 Sept 2023
Determination deadline
29 Oct 2023
Local authority
Surrey Heath Borough Council

Application overview

Submission of details to comply with conditions 40 (surface water drainage) and 41 (wetland features) attached to planning permission 12/0546 dated 4 April 2014 (as amended by 18/0619 dated 19 July 2019 and 18/1002 dated 14 November 2019) in respect of the Southern SANG (Phase 5a western area only)

Proposal details

Reference
23/0945/DTC
Alternative references
PP-12428283
Ward
Mytchett & Deepcut
Agent
WSP

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 13 of 13

DocumentPublishedAction
DecisionDecision · PDF16 Oct 2023View
DRAINAGE OFFICERConsultee Response · PDF9 Oct 2023View
LEAD LOCAL FLOOD AUTHORITYConsultee Response · PDF25 Sept 2023View
Application FormApplication Form · PDF11 Sept 2023View
SITE PLAN (PART PHASE 5A WESTERN AREA ONLY)OS Extract · PDF11 Sept 2023View
SOUTHERN SANG SUDS OVERVIEW (PHASE 5A WESTERN AREA ONLY)Plans · PDF11 Sept 2023View
POND G OUTFALL DETAILS SOUTHERN SANGS WESTERN AREA ONLYPlans · PDF11 Sept 2023View
RAILWAY CULVERT AND BASIN A SOUTHERN SANGS WESTERN AREA ONLYPlans · PDF11 Sept 2023View
BASIN G AND CANAL OUTFALL SOUTHERN SANGS WESTERN AREA ONLYPlans · PDF11 Sept 2023View
MAINTENANCE ACCESS PLAN SOUTHERN SANG WESTERN AREA ONLYPlans · PDF11 Sept 2023View
EXISTING STRUCTURES -REMEDIATION STRATEGY SOUTHERN SANGS WESTERN AREA ONLYPlans · PDF11 Sept 2023View
COVERING LETTERCorrespondence · PDF11 Sept 2023View
SURFACE WATER MANAGEMENT AND DRAINAGE STRATEGYReport · PDF11 Sept 2023View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Standard Consultation Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Issued Date

    Published milestoneCouncil source
  6. Decision Made Date

    Published milestoneCouncil source
  7. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Permission Expiry Date

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Grant
Decision
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.