Council planning record

Hybrid Application comprising 442 dwellings (C3 use) including details of the means of access served from the A1290, earthworks, landscaping, public open space and drainage attenuation (full application), and construction of employment floorspace (Use Class (B8) with ancillary (E(g)(i)) office associated servicing and infrastructure, including sub-station, car parking, service yards and circulation space, drainage attenuation, earthworks and landscaping (outline application all matters reserved).

Land To The North Of A1290 Washington.

CurrentReference: 26/01691/HY4Sunderland City Council

Last published check: 27 Sept 2026, 14:07. Check the council record for more recent changes.

Application location

Land To The North Of A1290 Washington.

This record has no verified map location.

View council map

Application summary

Status
Current
Application type
Hybrid Application Regulation 4
Received
4 Aug 2026
Validated
18 Aug 2026
Determination deadline
8 Dec 2026
Local authority
Sunderland City Council

Application overview

Hybrid Application comprising 442 dwellings (C3 use) including details of the means of access served from the A1290, earthworks, landscaping, public open space and drainage attenuation (full application), and construction of employment floorspace (Use Class (B8) with ancillary (E(g)(i)) office associated servicing and infrastructure, including sub-station, car parking, service yards and circulation space, drainage attenuation, earthworks and landscaping (outline application all matters reserved).

Proposal details

Reference
26/01691/HY4
Alternative references
PP-14926008
Ward
Washington East
Agent
Barratt Homes

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 146 of 146

DocumentPublishedAction
NATIONAL HIGHWAYS COMMENTSConsultee Response · PDF24 Sept 2026View
NORTHERN GAS NETWORKS - WITHDRAWING OBJConsultee Response · PDF22 Sept 2026View
ACTIVE TRAVEL ENGLAND CONSULTEE RESPONSEConsultee Response · PDF18 Sept 2026View
CONTAMINATED LAND COMMENTSConsultee Response · PDF17 Sept 2026View
ENVIRONMENT AGENCY CONSULTEE RESPONSEConsultee Response · PDF16 Sept 2026View
PUBLIC HEALTH CONSULTEE RESPONSEConsultee Response · PDF15 Sept 2026View
CONSERVATION TEAM COMMENTSConsultee Response · PDF14 Sept 2026View
LLFA CONSULTEE RESPONSEConsultee Response · PDF9 Sept 2026View
LLFA CONSULTEE RESPONSEConsultee Response9 Sept 2026View
NORTHUMBRIA POLICE CONSULTEE RESPONSEConsultee Response · PDF8 Sept 2026View
NATURAL ENGLAND COMMENTSConsultee Response · PDF4 Sept 2026View
HSE RESPONSEConsultee Response · PDF2 Sept 2026View
COAL AUTHORITY COMMENTSConsultee Response · PDF27 Aug 2026View
PLANNING STATEMENT ADDENDUMReport/Statement · PDF26 Aug 2026View
REGULATION 19 NOTIFICATION LETTER TO NATURAL ENGLANDCorrespondence · PDF26 Aug 2026View
REGULATION 19 NOTIFICATION LETTER TO NATIONAL HIGHWAYSCorrespondence · PDF26 Aug 2026View
REGULATION 19 NOTIFICATION LETTER TO ENVIRONMENT AGENCYCorrespondence · PDF26 Aug 2026View
REGULATION 19 NOTIFICATION LETTER TO MMOCorrespondence · PDF26 Aug 2026View
REGULATION 19 NOTIFICATION LETTER TO COAL AUTHORITYCorrespondence · PDF26 Aug 2026View
REGULATION 19 NOTIFICATION LETTER TO NPCUCorrespondence · PDF26 Aug 2026View
COUNTY ARCHAEOLOGIST CONSULTEE RESPONSEConsultee Response · PDF25 Aug 2026View
PRESS NOTICEPress Notice · PDF24 Aug 2026View
TYNE AND WEAR FIRE RESECUE COMMENTSConsultee Response · PDF20 Aug 2026View
NORTHERN POWERGRID CONSULTEE RESPONSE/PLANConsultee Response · PDF19 Aug 2026View
NORTHERN POWERGRID CONSULTEE RESPONSE/PLANConsultee Response · PDF19 Aug 2026View
NORTHERN POWERGRID CONSULTEE RESPONSE/PLANConsultee Response · PDF19 Aug 2026View
NORTHERN POWERGRID CONSULTEE RESPONSE/PLANConsultee Response · PDF19 Aug 2026View
COAL AUTHORITY CONSULTEE RESPONSEConsultee Response · PDF19 Aug 2026View
NORTHERN GAS NETWORKS CONSULTATION RESPONSEConsultee Response · PDF19 Aug 2026View
NORTHERN GAS NETWORKS CONSULTATION RESPONSEConsultee Response · PDF19 Aug 2026View
WYCHWOOD OPPPlan/Drawing · PDF17 Aug 2026View
WYCHWOOD ASPlan/Drawing · PDF17 Aug 2026View
WINTERTON OPP.Plan/Drawing · PDF17 Aug 2026View
WINTERTON ASPlan/Drawing · PDF17 Aug 2026View
TORBAY OPPPlan/Drawing · PDF17 Aug 2026View
TORBAY ASPlan/Drawing · PDF17 Aug 2026View
SUDBURY OPP.Plan/Drawing · PDF17 Aug 2026View
SUDBURY ASPlan/Drawing · PDF17 Aug 2026View
SOMERLEYTON OPP.Plan/Drawing · PDF17 Aug 2026View
SOMERLEYTON ASPlan/Drawing · PDF17 Aug 2026View
SOMERFORD OPPPlan/Drawing · PDF17 Aug 2026View
SOMERFORD ASPlan/Drawing · PDF17 Aug 2026View
ROWAN OPPPlan/Drawing · PDF17 Aug 2026View
ROWAN ASPlan/Drawing · PDF17 Aug 2026View
REDFORD OPPPlan/Drawing · PDF17 Aug 2026View
REDFORD ASPlan/Drawing · PDF17 Aug 2026View
PENNINE OPPPlan/Drawing · PDF17 Aug 2026View
PENNINE ASPlan/Drawing · PDF17 Aug 2026View
NENE OPPPlan/Drawing · PDF17 Aug 2026View
NENE ASPlan/Drawing · PDF17 Aug 2026View
MEWSTONE OPPPlan/Drawing · PDF17 Aug 2026View
MEWSTONE ASPlan/Drawing · PDF17 Aug 2026View
MATLOCK OPPPlan/Drawing · PDF17 Aug 2026View
MATLOCK ASPlan/Drawing · PDF17 Aug 2026View
MARWOOD OPPPlan/Drawing · PDF17 Aug 2026View
MARWOOD ASPlan/Drawing · PDF17 Aug 2026View
MARTHAM OPP.Plan/Drawing · PDF17 Aug 2026View
MARTHAM ASPlan/Drawing · PDF17 Aug 2026View
LYNFORD OPPPlan/Drawing · PDF17 Aug 2026View
LYNFORD ASPlan/Drawing · PDF17 Aug 2026View
LINSTOCK OPPPlan/Drawing · PDF17 Aug 2026View
LINSTOCK ASPlan/Drawing · PDF17 Aug 2026View
KNIGHTWOOD OPPPlan/Drawing · PDF17 Aug 2026View
KNIGHTWOOD ASPlan/Drawing · PDF17 Aug 2026View
KENNISHAM OPPPlan/Drawing · PDF17 Aug 2026View
KENNISHAM ASPlan/Drawing · PDF17 Aug 2026View
KELLING OPPPlan/Drawing · PDF17 Aug 2026View
KELLING ASPlan/Drawing · PDF17 Aug 2026View
HOLKHAM OPPPlan/Drawing · PDF17 Aug 2026View
HOLKHAM ASPlan/Drawing · PDF17 Aug 2026View
GREYLAKE OPPPlan/Drawing · PDF17 Aug 2026View
GREYLAKE ASPlan/Drawing · PDF17 Aug 2026View
FRAMPTON OPPPlan/Drawing · PDF17 Aug 2026View
FRAMPTON ASPlan/Drawing · PDF17 Aug 2026View
ELMSWELL OPPPlan/Drawing · PDF17 Aug 2026View
ELMSWELL ASPlan/Drawing · PDF17 Aug 2026View
DEDHAM OPPPlan/Drawing · PDF17 Aug 2026View
DEDHAM ASPlan/Drawing · PDF17 Aug 2026View
CULVER OPP.Plan/Drawing · PDF17 Aug 2026View
CULVER ASPlan/Drawing · PDF17 Aug 2026View
BREAN OPP.Plan/Drawing · PDF17 Aug 2026View
BREAN ASPlan/Drawing · PDF17 Aug 2026View
BLAKENEY OPP.Plan/Drawing · PDF17 Aug 2026View
BLAKENEY ASPlan/Drawing · PDF17 Aug 2026View
ASTON OPPPlan/Drawing · PDF17 Aug 2026View
ASTON ASPlan/Drawing · PDF17 Aug 2026View
ALLERTHORPE OPPPlan/Drawing · PDF17 Aug 2026View
ALLERTHORPE ASPlan/Drawing · PDF17 Aug 2026View
LANDSCAPE STRATEGY PLANPlan/Drawing · PDF17 Aug 2026View
PROPOSED SITE LAYOUTPlan/Drawing · PDF12 Aug 2026View
DESIGN AND ACCESS STATEMENT PT 1Report/Statement · PDF12 Aug 2026View
DESIGN AND ACCESS STATEMENT PT 2Report/Statement · PDF12 Aug 2026View
DESIGN AND ACCESS STATEMENT PT 3Report/Statement · PDF12 Aug 2026View
DESIGN AND ACCESS STATEMENT PT 4Report/Statement · PDF12 Aug 2026View
BNG METRICOther12 Aug 2026View
APPLICATION FORM REDACTEDApplication Form Redacted · PDF12 Aug 2026View
STRATEGY PLAN COMPRESSEDPlan/Drawing · PDF12 Aug 2026View
ENVIRONMENTAL STATEMENT PART 1Enviromental Statement - EIA · PDF6 Aug 2026View
ENVIRONMENTAL STATEMENT PART 2Enviromental Statement - EIA · PDF6 Aug 2026View
ENVIRONMENTAL STATEMENT PART 3Enviromental Statement - EIA · PDF6 Aug 2026View
ENVIRONMENTAL STATEMENT PART 4Enviromental Statement - EIA · PDF6 Aug 2026View
ENVIRONMENTAL STATEMENT PART 5Enviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 1 - TRAFFIC AND TRANSPORTATIONEnviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 2 - WATER ENVIRONMENT.Enviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 3 - LVIAEnviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 4 - ECOLOGY (REDACTED)_PART1Enviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 4 - ECOLOGY (REDACTED)_PART 2Enviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 5 - SOCIO ECONOMIC.Enviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 6 - NOISE AND VIBRATION.Enviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 7 - AIR QUALITY, ODOUR AND DUSTEnviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 8 - HUMAN HEALTHEnviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 9 - CLIMATE CHANGE AND GREENHOUSE GASESEnviromental Statement - EIA · PDF6 Aug 2026View
ES PART 2, PAPER 10 - AGRICULTURAL LAND AND SOILSEnviromental Statement - EIA · PDF6 Aug 2026View
APPLICATIONFORMREDACTEDApplication Form Redacted · PDF4 Aug 2026View
ENGINEERING STRATEGY SHEET 3Plan/Drawing · PDF4 Aug 2026View
LOCATION PLANLocation Plan · PDF4 Aug 2026View
PROPOSED SITE LAYOUT - COLOUREDPlan/Drawing · PDF4 Aug 2026View
LAND USE PARAMETER PLANPlan/Drawing · PDF4 Aug 2026View
BUILDING HEIGHTS PARAMETER PLANPlan/Drawing · PDF4 Aug 2026View
ACCESS AND MOVEMENT PARAMETER PLANPlan/Drawing · PDF4 Aug 2026View
DENSITY PARAMETER PLANPlan/Drawing · PDF4 Aug 2026View
STRATEGY PLANPlan/Drawing · PDF4 Aug 2026View
HOUSETYPE BROCHURE 24.04.26Plan/Drawing · PDF4 Aug 2026View
ACCESS FROM A1290 WITH TRAFFIC CONTROL SYSTE,Plan/Drawing · PDF4 Aug 2026View
DRAINAGE STRATEGYPlan/Drawing · PDF4 Aug 2026View
ENGINEERING STRATEGY SHEET 1Plan/Drawing · PDF4 Aug 2026View
ENGINEERING STRATEGY SHEET 2Plan/Drawing · PDF4 Aug 2026View
SEQUENTIAL FLOOD RISK TEST REPORTReport/Statement · PDF4 Aug 2026View
HYBRID APPLICATION PLANNING SUPPORT STATEMENTReport/Statement · PDF4 Aug 2026View
5YHLS ASSESSMENTReport/Statement · PDF4 Aug 2026View
EMPLOYMENT REPORTReport/Statement · PDF4 Aug 2026View
STATEMENT OF COMMUNITY INVOLVEMENTReport/Statement · PDF4 Aug 2026View
FRAMEWORK WORKPLACE TRAVEL PLANReport/Statement · PDF4 Aug 2026View
SUSTAINABILITY STATEMENTReport/Statement · PDF4 Aug 2026View
BNG ECOLOGY REPORTOther · PDF4 Aug 2026View
HISTORIC ENVIRONMENT ASSESSMENT REPORTReport/Statement · PDF4 Aug 2026View
BNG METRIC - HEADLINE RESULTSReport/Statement · PDF4 Aug 2026View
RESIDENTIAL TRAVEL PLANReport/Statement · PDF4 Aug 2026View
TRANSPORT ASSESSMENT_PART1Report/Statement · PDF4 Aug 2026View
TRANSPORT ASSESSMENT_PART2Report/Statement · PDF4 Aug 2026View
TRANSPORT ASSESSMENT_PART3Report/Statement · PDF4 Aug 2026View
PHASE 1 LAND CONTAMINATION REPORT PART 4Report/Statement · PDF4 Aug 2026View
PHASE 1 LAND CONTAMINATION REPORT PART 1Report/Statement · PDF4 Aug 2026View
PHASE 1 LAND CONTAMINATION REPORT PART 2Report/Statement · PDF4 Aug 2026View
PHASE 1 LAND CONTAMINATION REPORT PART 3Report/Statement · PDF4 Aug 2026View
COVERING LETTERApplication Correspondence · PDF4 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Environmental Impact Assessment Received

    Published milestoneCouncil source
  2. Application Received Date

    Published milestoneCouncil source
  3. Application Validated Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Neighbour Consultation Date

    Published milestoneCouncil source
  6. Standard Consultation Date

    Published milestoneCouncil source
  7. Last Advertised In Press Date

    Published milestoneCouncil source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  10. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  11. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  12. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Current
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.