Council planning record

Discharge of Requirement 25: Main Development Site: Fen Meadow (1) Vegetation clearance within Sizewell Marshes SSSI must not be carried out until: (i) a fen meadow plan for the development of fen meadow at Work No. 6 and 7 has been submitted to and approved by East Suffolk Council, in consultation with Natural England; and (ii) a fen meadow plan for the development of fen meadow at Work No. 18 has been submitted to and approved by Suffolk County Council in its capacity as local planning authority on behalf of West Suffolk Council in consultation with West Suffolk Council and Natural England. (2) The fen meadow plans must be developed in general accordance with the Fen Meadow Strategy and Draft Fen Meadow Plan and include details of proposed works, including – (i) Landscape and planting details; (ii) Water management measures; and (iii) An implementation timetable for the works. (3) Work No. 6, Work No. 7 and Work No. 18 must be carried out in accordance with the relevant approved fen meadow plans.

Sizewell C Nuclear Power Station

InformativeReference: SCC/0106/22/DORSuffolk County Council

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Informative
Application type
Discharge of Requirements
Received
9 Dec 2022
Validated
14 Dec 2022
Determination deadline
Not published
Local authority
Suffolk County Council

Application overview

Discharge of Requirement 25: Main Development Site: Fen Meadow (1) Vegetation clearance within Sizewell Marshes SSSI must not be carried out until: (i) a fen meadow plan for the development of fen meadow at Work No. 6 and 7 has been submitted to and approved by East Suffolk Council, in consultation with Natural England; and (ii) a fen meadow plan for the development of fen meadow at Work No. 18 has been submitted to and approved by Suffolk County Council in its capacity as local planning authority on behalf of West Suffolk Council in consultation with West Suffolk Council and Natural England. (2) The fen meadow plans must be developed in general accordance with the Fen Meadow Strategy and Draft Fen Meadow Plan and include details of proposed works, including – (i) Landscape and planting details; (ii) Water management measures; and (iii) An implementation timetable for the works. (3) Work No. 6, Work No. 7 and Work No. 18 must be carried out in accordance with the relevant approved fen meadow plans.

Proposal details

Reference
SCC/0106/22/DOR

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Sizewell C Nuclear Power Station

This record has no verified map location.

Documents 19 of 19

DocumentPublishedAction
Final Letter To SCC Fen Meadow R25 (pakenham)FINAL Letter to SCC Fen Meadow_R25 (Pakenham).pdf ( kb)9 Dec 2022View
Fen Meadow Plan Pakenham Work No. 18Fen_ Meadow_Plan_Pakenham_Work_No._18.pdf ( kb)9 Dec 2022View
Fen Meadow Plan Pakenham Work No. 18 Tracked ChangesFen_ Meadow_Plan_Pakenham_Work_No._18_Tracked_Changes.pdf ( kb)9 Dec 2022View
Fen Meadow Plan Pakenham Work No. 18 Appendices 1 Of 2Fen_ Meadow_Plan_Pakenham_Work_No._18_Appendices_1_of_2.pdf ( kb)9 Dec 2022View
Fen Meadow Plan Pakenham Work No. 18 Appendices 2 Of 2Fen_ Meadow_Plan_Pakenham_Work_No._18_Appendices_2_of_2.pdf ( kb)9 Dec 2022View
Creation Of Off Site Habitat Compensation Sites For Fen Meadow And Wet WoodlandCreation of Off-site Habitat Compensation Sites for Fen Meadow and Wet Woodland.pdf ( kb)15 Dec 2022View
Response From SCC Landscape RedactedResponse from SCC Landscape_redacted.pdf ( kb)16 Dec 2022View
Acknowledgement From East Suffolk CouncilAcknowledgement from East Suffolk Council.pdf ( kb)22 Dec 2022View
2022 12 28 Response From Floods2022-12-28 Response from Floods.pdf ( kb)28 Dec 2022View
Response From SCC Transport StrategyResponse from SCC Transport Strategy.pdf ( kb)11 Jan 2023View
Response From Natural EnglandResponse from Natural England.pdf ( kb)12 Jan 2023View
Response From East Suffolk CouncilResponse from East Suffolk Council.pdf ( kb)12 Jan 2023View
Response From Ecology Team RedactedResponse from Ecology Team_redacted.pdf ( kb)12 Jan 2023View
Response From Public Rights Of WayResponse from Public Rights of Way.pdf ( kb)15 Jan 2023View
Response From Ixworth & Ixworth Thorpe Parish CouncilResponse from Ixworth & Ixworth Thorpe Parish Council.pdf ( kb)17 Jan 2023View
Response From Pakenham Fen And IxworthResponse from Pakenham Fen and Ixworth.pdf ( kb)18 Jan 2023View
Response From Pakenham Parish CouncilResponse from Pakenham Parish Council.pdf ( kb)18 Jan 2023View
Response From West Suffolk CouncilResponse from West Suffolk Council.pdf ( kb)18 Jan 2023View
SCC Decision Letter Dor25 Pakenham Fen Meadow 03.02.23 RedactedSCC Decision Letter DoR25 Pakenham Fen Meadow 03.02.23 - Signed_redacted.pdf ( kb)3 Feb 2023View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

DOR - Partially Discharged
SCC Decision Letter Dor25 Pakenham Fen Meadow 03.02.23 Redacted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.