Council planning record

Discharge of Condition 7. Surface Water Drainage. For planning permission SCC/0090/22IP

Land between Bramford Rd and Europa Way, (New Link Road) Ipswich, Suffolk IP1 5BH

Application ApprovedReference: SCC/0090/22IP/ART27c7Suffolk County Council

Last published check: 14 Sept 2026, 18:05. Check the council record for more recent changes.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Application summary

Status
Application Approved
Application type
Article 27
Received
19 May 2025
Validated
1 Jul 2025
Determination deadline
Not published
Local authority
Suffolk County Council

Application overview

Discharge of Condition 7. Surface Water Drainage. For planning permission SCC/0090/22IP

Proposal details

Reference
SCC/0090/22IP/ART27c7
Agent
Concertus Design and Property Consultants

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Application location

Land between Bramford Rd and Europa Way, (New Link Road) Ipswich, Suffolk IP1 5BH

This record has no verified map location.

Documents 34 of 34

DocumentPublishedAction
Application Form RedactedApplication Form_redacted.pdf ( kb)19 May 2025View
Surface Water Verification Report Rev 1.1 SignedSurface Water Verification Report Rev 1.1_Signed.pdf ( kb)19 May 2025View
Appendix A - Site Photos ConstructionAppendix A - Site photos construction.pdf ( kb)19 May 2025View
Appendix B - As Built DrawingsAppendix B - As-built Drawings.pdf ( kb)19 May 2025View
Appendix C - Proposed Drainage DrawingsAppendix C - Proposed Drainage Drawings.pdf ( kb)19 May 2025View
Appendix D - CCTV Drainage SurveyAppendix D - CCTV Drainage Survey.pdf ( kb)19 May 2025View
Appendix E - Site Photos Post ConstructionAppendix E- Site photos post-construction.pdf ( kb)19 May 2025View
Appendix F - Product CertificatesAPPENDIX F - Product Certificates.pdf ( kb)19 May 2025View
Appendix G - Section 106 Agreement Rev AAppendix G - Section 106 Agreement Rev A.pdf ( kb)19 May 2025View
Appendix H - Asset Data Collection FormAppendix H - Asset-data-collection-form.xlsx ( kb)19 May 2025View
ACO V-Septor Data SheetACO V-Septor Data Sheet.pdf ( kb)19 May 2025View
DES022865 V1 Hydraulic ReportDES022865 V1 Hydraulic Report.pdf ( kb)19 May 2025View
DES022865 Run Breakdown and Parts ScheduleDES022865 Run Breakdown and Parts Schedule.pdf ( kb)19 May 2025View
DES022865 V1 Run Breakdown and Parts ScheduleDES022865 V1 Run Breakdown and Parts Schedule.pdf ( kb)19 May 2025View
KerbDrain Brochure 2025KerbDrain Brochure 2025.pdf ( kb)19 May 2025View
KerbDrain E600 Brochure 2024KerbDrain E600 Brochure 2024.pdf ( kb)19 May 2025View
Wrekin Geosynthetic CatalogueWrekin Geosynthetic Catalogue.pdf ( kb)19 May 2025View
WREKIN GT 500WREKIN GT 500.pdf ( kb)19 May 2025View
PDS033_Standard_GeotextilesPDS033_Standard_Geotextiles.pdf ( kb)19 May 2025View
Terram-T1000-Iss-10-UKCACE-NF_redactedTerram-T1000-Iss-10-UKCACE-NF_redacted.pdf ( kb)19 May 2025View
241122_Weir Wall Proposal-Brick-A3241122_Weir Wall Proposal-Brick-A3.pdf ( kb)19 May 2025View
Engineering-Brick-Summary-Of-UseEngineering-Brick-Summary-Of-Use.pdf ( kb)19 May 2025View
Preisliste 2014_EN.inddPreisliste 2014_EN.indd.pdf ( kb)19 May 2025View
wrekin-products-accessories-h2go-gully-chute-connector-dgcc6545gwrekin-products-accessories-h2go-gully-chute-connector-dgcc6545g.pdf ( kb)19 May 2025View
DCEA 22-40mm Type B 2024-09-11DCEA 22-40mm Type B 2024-09-11.pdf ( kb)19 May 2025View
DCHA 22-40mm Type B 2024-09-11DCHA 22-40mm Type B 2024-09-11.pdf ( kb)19 May 2025View
Drainage_Water_Management_2023_LR_v3.9 9Drainage_Water_Management_2023_LR_v3.9 9.pdf ( kb)19 May 2025View
Drainage_Water_Management_2023_LR_v3.9 10Drainage_Water_Management_2023_LR_v3.9 10.pdf ( kb)19 May 2025View
Drainage_Water_Management_2023_LR_v3.9 11Drainage_Water_Management_2023_LR_v3.9 11.pdf ( kb)19 May 2025View
Drainage_Water_Management_2023_LR_v3.9 23Drainage_Water_Management_2023_LR_v3.9 23.pdf ( kb)19 May 2025View
1696942695_pp_polypipe_product_guide_2023_digital_v21696942695_pp_polypipe_product_guide_2023_digital_v2.pdf ( kb)19 May 2025View
Response From Flood & WaterResponse from Flood & Water.pdf ( kb)11 Jun 2025View
2025-07-03 Ipswich Europa Way Article 27 Drainage Verification Officer Delegated Summary2025-07-03 Ipswich Europa Way Article 27 Drainage Verification Officer Delegated Summary.pdf ( kb)3 Jul 2025View
2025-07-03 Ipswich Europa Way Article 27 Drainage Verification Agent Letter_redacted2025-07-03 Ipswich Europa Way Article 27 Drainage Verification Agent Letter_redacted.pdf ( kb)3 Jul 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision & conditions

DOR - Fully Discharged
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.