Council planning record

Requirement 19(1) and 32(2)of the DCO state the following: Pre-commencement archaeology execution plan 19.—(1) No intrusive onshore preparation works (including pre-commencement archaeological surveys, archaeological investigations or site preparation works in respect of such surveys or investigations) may be carried out until a pre-commencement archaeology execution plan (which accords with the outline pre-commencement archaeology execution plan and the outline written scheme of investigation (onshore archaeology)) in respect of those works has been submitted to and approved by Suffolk County Council in consultation with the relevant planning authority. Public rights of way 32.—(1) No stage of the authorised development or onshore preparation works that would affect a public right of way specified in Schedule 3 (public rights of way to be temporarily stopped up) or Schedule 4 (footpaths to be stopped up) is to be undertaken until a public rights of way strategy in respect of that stage and in accordance with the outline public rights of way strategy, including the specification for the making up of an alternative right of way (where appropriate) has been submitted to and approved by the relevant highway authority in consultation with the relevant planning authority.

East Anglia One North Offshore Wind Farm

Application ApprovedReference: SCC/0039/24/DoR/EA1NSuffolk County Council

Last published check: 14 Sept 2026, 20:14. Check the council record for more recent changes.

Application location

East Anglia One North Offshore Wind Farm

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Discharge of Requirements
Received
8 Apr 2024
Validated
8 Apr 2024
Determination deadline
Not published
Local authority
Suffolk County Council

Application overview

Requirement 19(1) and 32(2)of the DCO state the following: Pre-commencement archaeology execution plan 19.—(1) No intrusive onshore preparation works (including pre-commencement archaeological surveys, archaeological investigations or site preparation works in respect of such surveys or investigations) may be carried out until a pre-commencement archaeology execution plan (which accords with the outline pre-commencement archaeology execution plan and the outline written scheme of investigation (onshore archaeology)) in respect of those works has been submitted to and approved by Suffolk County Council in consultation with the relevant planning authority. Public rights of way 32.—(1) No stage of the authorised development or onshore preparation works that would affect a public right of way specified in Schedule 3 (public rights of way to be temporarily stopped up) or Schedule 4 (footpaths to be stopped up) is to be undertaken until a public rights of way strategy in respect of that stage and in accordance with the outline public rights of way strategy, including the specification for the making up of an alternative right of way (where appropriate) has been submitted to and approved by the relevant highway authority in consultation with the relevant planning authority.

Proposal details

Reference
SCC/0039/24/DoR/EA1N
Agent
SLR - Kay Griffin

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 3 of 3

DocumentPublishedAction
Email From SLR Consulting Limited RedactedEmail from SLR Consulting Limited_redacted.pdf ( kb)3 Apr 2024View
Officer Delegated Summary - Ecol Mit DOR1932Officer Delegated Summary - Ecol Mit DOR1932_.pdf ( kb)30 May 2024View
EA1N Decision Letter Ecol Mit SCC.0039.24.DOR.EA1N RedactedEA1N Decision Letter Ecol Mit SCC.0039.24.DoR.EA1N_ redacted.pdf ( kb)30 May 2024View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Decision & conditions

Approved
EA1N Decision Letter Ecol Mit SCC.0039.24.DOR.EA1N Redacted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.