Demolition of the existing Equipment Maintenance Unit (EMU) building and separate Changing/Showering Block, installation of a SCC owned single temporary classbase unit currently sited at Cedarwood Primary School (Kesgrave), and alterations to the existing Pre-School building and reshaping of the external areas.
Witnesham Primary School, High Road, Witnesham, Ipswich, IP6 9EX
Demolition of the existing Equipment Maintenance Unit (EMU) building and separate Changing/Showering Block, installation of a SCC owned single temporary classbase unit currently sited at Cedarwood Primary School (Kesgrave), and alterations to the existing Pre-School building and reshaping of the external areas.
Reference
SCC\0035\18C
Agent
Concertus - Anson Lockwood
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.