Council planning record

Demolition of existing toilet block, staff room and link corridor to provide a 600 sqm timber constructed extension. Extension will include additional teaching space as part of round 3 of the SOR programme and will have a mixture of flat and curved roofs. The walls will be a timber construction with a rendered facade.

Tudor CEVCP School, Tudor Road, Sudbury, Suffolk, CO10 1NL

Application ApprovedReference: B/11/01108/CDPSuffolk County Council

Last published check: 28 Sept 2026, 20:17. Check the council record for more recent changes.

Application location

Tudor CEVCP School, Tudor Road, Sudbury, Suffolk, CO10 1NL

This record has no verified map location.

Application summary

Status
Application Approved
Application type
Full Planning application
Received
31 Aug 2011
Validated
31 Aug 2011
Determination deadline
Not published
Local authority
Suffolk County Council

Application overview

Demolition of existing toilet block, staff room and link corridor to provide a 600 sqm timber constructed extension. Extension will include additional teaching space as part of round 3 of the SOR programme and will have a mixture of flat and curved roofs. The walls will be a timber construction with a rendered facade.

Proposal details

Reference
B/11/01108/CDP
Agent
Richard Carr

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 37 of 37

DocumentPublishedAction
13420_92992_Committee Report Tudor.doc13420_92992_Committee Report Tudor.doc ( kb)6 Dec 2011View
13420_92990_2011-12-01 Tudor Primary.doc13420_92990_2011-12-01 Tudor Primary.doc ( kb)6 Dec 2011View
13420_89689_Reps Letter Mrs J Alleston 19-09-11-.pdf13420_89689_Reps Letter Mrs J Alleston 19-09-11-.pdf ( kb)20 Sept 2011View
13420_89688_L08_08 Amended 2 4m Chainlink Fence.pdf13420_89688_L08_08 Amended 2 4m Chainlink Fence.pdf ( kb)20 Sept 2011View
13420_89687_L02_01A Amended Landscape Proposals.pdf13420_89687_L02_01A Amended Landscape Proposals.pdf ( kb)20 Sept 2011View
13420_89407_IMG_4011.JPG13420_89407_IMG_4011.JPG ( kb)13 Sept 2011View
13420_89406_IMG_4010.JPG13420_89406_IMG_4010.JPG ( kb)13 Sept 2011View
13420_89405_IMG_4009.JPG13420_89405_IMG_4009.JPG ( kb)13 Sept 2011View
13420_89404_IMG_4008.JPG13420_89404_IMG_4008.JPG ( kb)13 Sept 2011View
13420_89403_IMG_4007.JPG13420_89403_IMG_4007.JPG ( kb)13 Sept 2011View
13420_89330_2011-09-09 Tudor Primary.doc13420_89330_2011-09-09 Tudor Primary.doc ( kb)12 Sept 2011View
13420_89091_Arbboricultural Impact Assessment.pdf13420_89091_Arbboricultural Impact Assessment.pdf ( kb)1 Sept 2011View
13420_89090_Perspectives.pdf13420_89090_Perspectives.pdf ( kb)1 Sept 2011View
13420_89089_Drainage Plan.pdf13420_89089_Drainage Plan.pdf ( kb)1 Sept 2011View
13420_89077_How the fee was calculated13420_89077_How the fee was calculated.pdf ( kb)31 Aug 2011View
13420_89076_A summary of the attachments in the proposal13420_89076_A summary of the attachments in the proposal.pdf ( kb)31 Aug 2011View
13420_89075_Application Form - Without Personal Data13420_89075_Application Form - Without Personal Data.pdf ( kb)31 Aug 2011View
13420_89074_Application Form13420_89074_Application Form.pdf ( kb)31 Aug 2011View
13420_89073_A02_06REPLACEMENT WINDOWS CONSEQUENTIAL IMPROVEMENTS13420_89073_A02_06REPLACEMENT WINDOWS CONSEQUENTIAL IMPROVEMENTS.PDF ( kb)31 Aug 2011View
13420_89072_A02_05 REV A SITE PLAN13420_89072_A02_05 REV A SITE PLAN.PDF ( kb)31 Aug 2011View
13420_89071_A02_04 REV C PROPOSED ELEVATIONS13420_89071_A02_04 REV C PROPOSED ELEVATIONS.PDF ( kb)31 Aug 2011View
13420_89070_A02_03 REV C PROPOSED GF PLAN13420_89070_A02_03 REV C PROPOSED GF PLAN.PDF ( kb)31 Aug 2011View
13420_89069_A02_02 REV C Site Plan13420_89069_A02_02 REV C Site Plan.PDF ( kb)31 Aug 2011View
13420_89068_A02_01 REV B Proposed site Location plan13420_89068_A02_01 REV B Proposed site Location plan.PDF ( kb)31 Aug 2011View
13420_89067_A01_04 REV C EXISTING ELEVATIONS13420_89067_A01_04 REV C EXISTING ELEVATIONS.PDF ( kb)31 Aug 2011View
13420_89066_A01_03 REV C EXISTING GF PLAN13420_89066_A01_03 REV C EXISTING GF PLAN.PDF ( kb)31 Aug 2011View
13420_89065_A01_02 REV C TOPOGRAPHICAL SURVEY13420_89065_A01_02 REV C TOPOGRAPHICAL SURVEY.PDF ( kb)31 Aug 2011View
13420_89064_A01_01 REV B Existing site location plan13420_89064_A01_01 REV B Existing site location plan.PDF ( kb)31 Aug 2011View
13420_89063_2011-08-26 TUDOR CEVCP PRE PLANNING COMMENTS13420_89063_2011-08-26 TUDOR CEVCP PRE PLANNING COMMENTS.pdf ( kb)31 Aug 2011View
13420_89061_2011-08-05 AAA-0511 Planning Policy Statement 2313420_89061_2011-08-05 AAA-0511 Planning Policy Statement 23.pdf ( kb)31 Aug 2011View
13420_89060_2011-08-02 AAA-0511 Design and Access Statement RE13420_89060_2011-08-02 AAA-0511 Design and Access Statement RE.pdf ( kb)31 Aug 2011View
13420_89059_2011-07-28 AAA-0511 En-Check Report13420_89059_2011-07-28 AAA-0511 En-Check Report.pdf ( kb)31 Aug 2011View
13420_89058_2011-07-28 AAA-0511 En- Check Supplemental Memo13420_89058_2011-07-28 AAA-0511 En- Check Supplemental Memo.pdf ( kb)31 Aug 2011View
13420_89057_2011-07-28 AAA-0511 Archaeology details13420_89057_2011-07-28 AAA-0511 Archaeology details.pdf ( kb)31 Aug 2011View
13420_89056_2011-07-14 AAA-0511 Sewage Plan13420_89056_2011-07-14 AAA-0511 Sewage Plan.pdf ( kb)31 Aug 2011View
13420_89055_2006-08-06 AAA-0511 Existing Travel Plan13420_89055_2006-08-06 AAA-0511 Existing Travel Plan.pdf ( kb)31 Aug 2011View
13420_182682_Comments Ecology Sue Hooton 21-09-15 Park Farm Quarry.pdf13420_182682_Comments Ecology Sue Hooton 21-09-15 Park Farm Quarry.pdf ( kb)22 Sept 2015View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Date Received

    Published milestoneCouncil source
  2. Date Valid

    Published milestoneCouncil source
  3. Decision Date

    Published milestoneCouncil source

Decision & conditions

Approved
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.