ApprovedCouncil status: HS2 Approval with Conditions
Amendments to HS2BW/00032/22 to change: application boundary to follow the revised alignment of the River Itchen diversion; application boundary to include provision of Vehicle Restraint Systems (VRS) along the A452 Leamington Road, together with associated earthworks and boundary fencing; realignment of a section of the Maintenance Access Strip (MAS) beneath the River Itchen Viaduct; amendment to the location of security fencing and boundary fencing; provision of VRS along the Maintenance Access Track and MAS; earthworks to form drainage ditches and associated headwalls; engineering earthworks around the balancing pond and landscape earthworks across the site; and provision of a short section of retaining wall at the corner of the South Portal Structure.
Long Itchington Wood Tunnel Leamington Road Southam
Amendments to HS2BW/00032/22 to change: application boundary to follow the revised alignment of the River Itchen diversion; application boundary to include provision of Vehicle Restraint Systems (VRS) along the A452 Leamington Road, together with associated earthworks and boundary fencing; realignment of a section of the Maintenance Access Strip (MAS) beneath the River Itchen Viaduct; amendment to the location of security fencing and boundary fencing; provision of VRS along the Maintenance Access Track and MAS; earthworks to form drainage ditches and associated headwalls; engineering earthworks around the balancing pond and landscape earthworks across the site; and provision of a short section of retaining wall at the corner of the South Portal Structure.
Reference
HS2NMC/00058/26
Ward
Southam North & Long Itchington
Parish
Long Itchington
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.