T1 - lime - There is a limb going over the footpath/highway we would like to prune back/remove, we would also like to reduce the tree by 2-3 metres in height and 1.5 metres in spread. Positioned behind parking areas, work aims to reduce waste falling from the tree onto cars. T2 - lime - We would like to reduce the height by 2-3 metres and the width by up to 1 metre. Positioned behind parking areas, work aims to reduce waste falling from the tree onto cars. T3 - lime - We would like to reduce the height by 2-3 metres and the width by approx 1.5 metres. Positioned behind parking areas, work aims to reduce waste falling from the tree onto cars. T4 - lime - We would like to reduce the whole tree by approx 2-3 metres in heigh and 1.5-2 metres in width. Positioned behind a car port area.
T1 - lime - There is a limb going over the footpath/highway we would like to prune back/remove, we would also like to reduce the tree by 2-3 metres in height and 1.5 metres in spread. Positioned behind parking areas, work aims to reduce waste falling from the tree onto cars. T2 - lime - We would like to reduce the height by 2-3 metres and the width by up to 1 metre. Positioned behind parking areas, work aims to reduce waste falling from the tree onto cars. T3 - lime - We would like to reduce the height by 2-3 metres and the width by approx 1.5 metres. Positioned behind parking areas, work aims to reduce waste falling from the tree onto cars. T4 - lime - We would like to reduce the whole tree by approx 2-3 metres in heigh and 1.5-2 metres in width. Positioned behind a car port area.
Reference
26/02876/TPO
Ward
Stratford Orchard Hill
Parish
Stratford-upon-Avon
Agent
Mr Joshua Robbins
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.