Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
ApprovedCouncil status: Listed Build - Prop Lawful Dev Granted
2 The Coach House Compton Verney Warwick CV35 9HJ
Last published check: 29 Oct 2026, 18:38. Check the council record for more recent changes.
Last published check: 29 Oct 2026, 18:38 (UK)
Dates come from the council record. A target date passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceWe wish to remove the existing (and non-functional/defunct) electric boiler (assuming it was installed in the 190s when the coach house was converted) and to install a Viessmann Vitotron 24Kw wall hung electric boiler. This will include installing any necessary copper pipework and fittings to connect the new boiler to our existing heating pipework, a boiler filter, suitable cleanser and inhibitor, and a new digital heating controller. The boiler is currently located on the ground floor, under the stairs, and we will keep it in this location. In the attic store room, we will remove the dated vented hot water cylinder and cold water tanks (plus all redundant items). We will install a new Telford Tempest 300 litre twin immersion direct hot water cylinder, 2 x 100-gallon coffin cold water break tanks and a DAB Esybox single booster hot water circulation pump (plus all necessary copper pipe work and fittings). In slower time, we will also replace all existing radiators and radiator valves (including the night storage ones on the top floor); all these look to have been installed in the 1980s) with more traditional-looking column radiators.
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsDocuments open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.