ApprovedCouncil status: Variation Permitted with Conditions

Variation / removal of conditions 2 (approved plans), 6 (LEMP), 7 (CTMP), 9 (Tree protection), 10 (landscaping), 11 (landscaping),12 (drainage),13 (landscaping), 20 (glint and glare), 26 (ecological mitigation), 27 (approved FRA) and 28 (FRA mitigation measures) of planning permission 24/01479/VARY (date of decision 25 October 2024) to account for layout changes Application 24/01479/VARY description of development: 'Variation of conditions 27 (approved FRA) and 28 (FRA mitigation measures) of planning permission 21/03194/FUL (date of decision 21 September 2022) to ensure accordance with the revised FRA Addendum Application 21/03194/FUL description of development: 'Installation and operation of a renewable energy generating station comprising ground-mounted photovoltaic solar arrays and battery-based electricity storage containers together with substation, point of connection mast, switchgear container, inverter/transformer units, site access, internal access tracks, security measures, access gates, other ancillary infrastructure and landscaping and biodiversity enhancements. (Cross boundary application for 44.62ha within Stratford District and 55.5ha within Warwick District under application ref W/21/1801).'

Chesterton Fields Farm Fosse Way Chesterton Leamington Spa CV33 9JY

Stratford-on-Avon District CouncilReference 25/00637/VARYRemoval/Variation of Conds.of Prev. Perm

Last published check: 1 Nov 2026, 10:48. Check the council record for more recent changes.

Status and dates

Last published check: 1 Nov 2026, 10:48 (UK)

  1. DoneReceived17 Mar 2025
  2. DoneValidated20 May 2025
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedVariation Permitted with Conditions26 Sept 2025

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. applicationReceivedDate

    Published milestoneCouncil source
  2. applicationValidDate

    Published milestoneCouncil source
  3. targetDeterminationDate

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. standardConsultationExpiryDate

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. overallExpiryDate

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. dateDecisionIssued

    Published milestoneCouncil source
Application type
Removal/Variation of Conds.of Prev. Perm
Ward
Harbury
Parish
Chesterton & Kingston
Documents
37 published

Proposal

Variation / removal of conditions 2 (approved plans), 6 (LEMP), 7 (CTMP), 9 (Tree protection), 10 (landscaping), 11 (landscaping),12 (drainage),13 (landscaping), 20 (glint and glare), 26 (ecological mitigation), 27 (approved FRA) and 28 (FRA mitigation measures) of planning permission 24/01479/VARY (date of decision 25 October 2024) to account for layout changes Application 24/01479/VARY description of development: 'Variation of conditions 27 (approved FRA) and 28 (FRA mitigation measures) of planning permission 21/03194/FUL (date of decision 21 September 2022) to ensure accordance with the revised FRA Addendum Application 21/03194/FUL description of development: 'Installation and operation of a renewable energy generating station comprising ground-mounted photovoltaic solar arrays and battery-based electricity storage containers together with substation, point of connection mast, switchgear container, inverter/transformer units, site access, internal access tracks, security measures, access gates, other ancillary infrastructure and landscaping and biodiversity enhancements. (Cross boundary application for 44.62ha within Stratford District and 55.5ha within Warwick District under application ref W/21/1801).'

Reference
25/00637/VARY
Ward
Harbury
Parish
Chesterton & Kingston
Agent
Mr Paul Burrell

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • 12. U P D A T E D Compounddetails Part ICouncil document25 Mar 2025View
  • 3. U P D A T E D Cable Trench Detailsand CrossingsCouncil document25 Mar 2025View
  • 5. U P D A T E D Spares Containet DetailsCouncil document25 Mar 2025View
  • 7. U P D A T E D Battery Inverter Station DetailsCouncil document25 Mar 2025View
  • 9. U P D A T E D Construction CompoundCouncil document25 Mar 2025View
  • 233107000304 Ashorne Solar Farm_ F R A AddendumCouncil document25 Mar 2025View
  • Application Form RedactedCouncil document25 Mar 2025View
  • Ashorne Updated Noise AssessmentCouncil document25 Mar 2025View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Variation Permitted with Conditions
Decision Letter
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.