RefusedCouncil status: Listed Building Consent Refused
1. DPC injected into all GF Walls 2. Rotten timber replaced on front with oak 3. Air bricks added to GF Bedroom 4. Air vent removed from Lounge 5. New rafters to existing GF extn and increased pitch. 6. New raised ceiling to GF bedroom and Shower 7. Ceilings skimmed throughout (and walls) 8. Walls in bathroom rebuilt with extra for shower. 9. 2 new built in wardrobes in main bed 10. GF cupboard walls rebuilt for new cylinder. 11. Extra sockets, ethernet throughout. 12. Suspended timber floor in GF bed replaced and insulation added underneath. 13. Level floor added to main bed and bathroom. 14. All internal doors replaced with oak doors 15. Rainwater pipes replaced: 3 new gulleys. 16. Existing wall lights replaced 17. New recessed lights to kitchen, shower, and front bed, bathroom and WC. 18. New oak surround to landing archway. 19. Stairs handed, risers filled. 20. Airing cupboard changed to WC. 21 Fireplaces rehearthed inc walls in lounge 22. Electric underfloor heating in kitchen, shower and bathroom new floors 23. New Oak lintel put in over re-opened window between dining and kitchen. 24. Timber column in dining replaced with new oak column 25. Extended SVP above roof to rear 26. FH tiles to GF shower replaced 27. FH tiles to bathroom shower and floor new. 28 Exisiting radiators and pipres replaced with new. 29. New shower in bathroom and WC and basin in converted AC have new waste pipes 30. Foundations over water main to rear under new utility room.
1. DPC injected into all GF Walls 2. Rotten timber replaced on front with oak 3. Air bricks added to GF Bedroom 4. Air vent removed from Lounge 5. New rafters to existing GF extn and increased pitch. 6. New raised ceiling to GF bedroom and Shower 7. Ceilings skimmed throughout (and walls) 8. Walls in bathroom rebuilt with extra for shower. 9. 2 new built in wardrobes in main bed 10. GF cupboard walls rebuilt for new cylinder. 11. Extra sockets, ethernet throughout. 12. Suspended timber floor in GF bed replaced and insulation added underneath. 13. Level floor added to main bed and bathroom. 14. All internal doors replaced with oak doors 15. Rainwater pipes replaced: 3 new gulleys. 16. Existing wall lights replaced 17. New recessed lights to kitchen, shower, and front bed, bathroom and WC. 18. New oak surround to landing archway. 19. Stairs handed, risers filled. 20. Airing cupboard changed to WC. 21 Fireplaces rehearthed inc walls in lounge 22. Electric underfloor heating in kitchen, shower and bathroom new floors 23. New Oak lintel put in over re-opened window between dining and kitchen. 24. Timber column in dining replaced with new oak column 25. Extended SVP above roof to rear 26. FH tiles to GF shower replaced 27. FH tiles to bathroom shower and floor new. 28 Exisiting radiators and pipres replaced with new. 29. New shower in bathroom and WC and basin in converted AC have new waste pipes 30. Foundations over water main to rear under new utility room.
Reference
22/01981/LBC
Ward
Wellesbourne North & Rural
Parish
Hampton Lucy
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.