ApprovedCouncil status: Tree Preservation Order - Approved Works
-ID 0603 ash - Prune crown to give approximately 3 metres clearance from adjacent property, 7 Norgren Crescent. Achieved by pruning off lowest limb growing towards front left corner of property and pruning off 2no. low branches on an adjacent ash tree growing over front lawn. -ID 0604 cherry - Remove secondary, leaning stem back to source, where in contact with adjacent outbuilding (sub-station). -ID 0605 ash - Prune back branches to growth points, where overhanging adjacent driveway/parking area. -ID 0606 ash tree - Fell, as main stem splitting at union. -ID 0608 cherry - Fell (Dead/dying). -ID 0609 ash - Fell, as main stem splitting at union. Remove deadwood less than 25mm in diameter, from tree stock, across site.
Former IMI Norgren Site Campden Road Shipston-on-Stour
-ID 0603 ash - Prune crown to give approximately 3 metres clearance from adjacent property, 7 Norgren Crescent. Achieved by pruning off lowest limb growing towards front left corner of property and pruning off 2no. low branches on an adjacent ash tree growing over front lawn. -ID 0604 cherry - Remove secondary, leaning stem back to source, where in contact with adjacent outbuilding (sub-station). -ID 0605 ash - Prune back branches to growth points, where overhanging adjacent driveway/parking area. -ID 0606 ash tree - Fell, as main stem splitting at union. -ID 0608 cherry - Fell (Dead/dying). -ID 0609 ash - Fell, as main stem splitting at union. Remove deadwood less than 25mm in diameter, from tree stock, across site.
Reference
21/03914/TPO
Ward
Shipston South
Parish
Shipston-on-Stour
Agent
Mr Mark Hodder
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.