ApprovedCouncil status: Listed Building Consent Approved
Works of repair and stabilisation to the blocked windows in the south gable of 19th century wing of the house. Works will consist of:- - Raking out defective / loose cementitious pointing around perimeter of the oak frames and repoint in lime mortar.- Careful removal of the brick infill panels and refixing, integrating Stainless Steel frame cramps to secure the brickwork to the oak frame as appropriate. Brickwork to be bedded and repointed in lime mortar to match the existing.- Replacement of decayed cill to window WF01 in oak. - Introduction of oak face patches to cover exposed tenons to decayed corner joints to all 3 windows. See drawing 883/07 for marked up photos of blocked windows
The Little House 17 Chestnut Square Wellesbourne CV35 9QS
Works of repair and stabilisation to the blocked windows in the south gable of 19th century wing of the house. Works will consist of:- - Raking out defective / loose cementitious pointing around perimeter of the oak frames and repoint in lime mortar.- Careful removal of the brick infill panels and refixing, integrating Stainless Steel frame cramps to secure the brickwork to the oak frame as appropriate. Brickwork to be bedded and repointed in lime mortar to match the existing.- Replacement of decayed cill to window WF01 in oak. - Introduction of oak face patches to cover exposed tenons to decayed corner joints to all 3 windows. See drawing 883/07 for marked up photos of blocked windows
Reference
18/02450/LBC
Ward
Wellesbourne East
Parish
Wellesbourne & Walton
Agent
Mrs Sarah Baldwin
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.