RefusedCouncil status: Refusal of Non Material Amendment
Erection of a 2 metre high Proctor Pro-mesh Palladin perimeter fencing (colour green) and a 1.8 metre high Proctor Rondo Feature fence railings at the site accesses off Rugby Road and Napton Road (colour black) (see Drawing 17106GA-90-003); Insertion of roof lantern into existing outbuilding (see Drawing 17106GA-31-003); Alternation of the external colour appearance of the main property (see Drawings 17106GA-20-007 Rev B, 17106GA-20-009A, 17106GA-20-101, and 17106GA-20-102) and erection of a grazed link to connect the main property with the outbuilding (see 17106GA-20-002M, 17106GA-20-007B, and 17106GA-20-009A); and replacement of proposed outbuilding (Drawing OBT/STP/001C) with a three bay garage (see Drawings 17106GA-20-001 K and drawing titled '3 Bay Garage with catslide').
Erection of a 2 metre high Proctor Pro-mesh Palladin perimeter fencing (colour green) and a 1.8 metre high Proctor Rondo Feature fence railings at the site accesses off Rugby Road and Napton Road (colour black) (see Drawing 17106GA-90-003); Insertion of roof lantern into existing outbuilding (see Drawing 17106GA-31-003); Alternation of the external colour appearance of the main property (see Drawings 17106GA-20-007 Rev B, 17106GA-20-009A, 17106GA-20-101, and 17106GA-20-102) and erection of a grazed link to connect the main property with the outbuilding (see 17106GA-20-002M, 17106GA-20-007B, and 17106GA-20-009A); and replacement of proposed outbuilding (Drawing OBT/STP/001C) with a three bay garage (see Drawings 17106GA-20-001 K and drawing titled '3 Bay Garage with catslide').
Reference
18/01351/AMD
Ward
Long Itchington And Stockton
Parish
Stockton
Agent
Mr Oliver Burton-Taylor
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.