A new entrance canopy with new glazed doors, a small flat roof extension cedar clad externally, cedar cladding to an existing wall by entrance. Internally the submitted application seeks consent for minor ground floor structural alterations within the later extended outbuildings and not within the main building as described in the above listing. In addition to structural alterations a full internal refurbishment on the ground floor and upstairs bedrooms comprising of the following: i. New floor finishes throughout. ii. Redecoration of existing plaster walls - paint or paper. iii. Redecoration of all ceilings throughout the ground floor - paint or paper. iv. New sanitary ware, flooring and redecoration within the toilets v. Overhaul of existing bar & bar back fitting vi. Refurbishment of existing kitchen and beer cellar
A new entrance canopy with new glazed doors, a small flat roof extension cedar clad externally, cedar cladding to an existing wall by entrance. Internally the submitted application seeks consent for minor ground floor structural alterations within the later extended outbuildings and not within the main building as described in the above listing. In addition to structural alterations a full internal refurbishment on the ground floor and upstairs bedrooms comprising of the following: i. New floor finishes throughout. ii. Redecoration of existing plaster walls - paint or paper. iii. Redecoration of all ceilings throughout the ground floor - paint or paper. iv. New sanitary ware, flooring and redecoration within the toilets v. Overhaul of existing bar & bar back fitting vi. Refurbishment of existing kitchen and beer cellar
Reference
17/03640/LBC
Ward
Wootton Wawen
Parish
Wilmcote
Agent
Mr Francesco Pillitteri
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.