ApprovedCouncil status: Listed Build - Prop Lawful Dev Granted

Proposed works to the flat roof of the Town Hall to prevent further leaking. The existing membrane ash-felt will remain in situ (as it is unclear how easy it will be to remove the old covering) with all edges and flashings to be removed prior to installation of the new membrane. A new 18mm OSB3 board will be fixed to the existing base with maximum falls (ensuring no pooling) to form a new clean deck. A new firestone EPDM synthetic rubber membrane will be fully adhered to the new deck using water based bonding adhesive. New maintenance free Plastisol coated trims will be installed to the edges and the whole system is cold applied, thus avoiding heat or flame and tar boilers. Finally, re-bed all copings and repoint all joints

Town Hall Sheep Street Stratford-upon-Avon CV37 6EF

Stratford-on-Avon District CouncilReference 17/01501/LBPCertificate Lawful works to Listed Build

Last published check: 12 Oct 2026, 07:22. Check the council record for more recent changes.

Status and dates

Last published check: 12 Oct 2026, 07:22 (UK)

  1. DoneReceived19 May 2017
  2. DoneValidated19 May 2017
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedListed Build - Prop Lawful Dev Granted15 Jun 2017

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (4)
  1. applicationReceivedDate

    Published milestoneCouncil source
  2. applicationValidDate

    Published milestoneCouncil source
  3. dateDecisionIssued

    Published milestoneCouncil source
  4. targetDeterminationDate

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Certificate Lawful works to Listed Build
Ward
Guildhall
Parish
Stratford-upon-Avon
Documents
5 published

Proposal

Proposed works to the flat roof of the Town Hall to prevent further leaking. The existing membrane ash-felt will remain in situ (as it is unclear how easy it will be to remove the old covering) with all edges and flashings to be removed prior to installation of the new membrane. A new 18mm OSB3 board will be fixed to the existing base with maximum falls (ensuring no pooling) to form a new clean deck. A new firestone EPDM synthetic rubber membrane will be fully adhered to the new deck using water based bonding adhesive. New maintenance free Plastisol coated trims will be installed to the edges and the whole system is cold applied, thus avoiding heat or flame and tar boilers. Finally, re-bed all copings and repoint all joints

Reference
17/01501/LBP
Ward
Guildhall
Parish
Stratford-upon-Avon

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Location PlanCouncil document24 May 2017View
  • Application FormCouncil document24 May 2017View
  • Other Supporting InfoCouncil document24 May 2017View
  • DELEGATED REPORTCouncil document20 Jun 2017View
  • APPROVALCouncil document19 Jun 2017View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Listed Build - Prop Lawful Dev Granted
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.