ApprovedCouncil status: Listed Build - Prop Lawful Dev Granted
The area considered by this application relates specifically to the party wall between 32 Rother Street and the retail unit currently occupied by Oxfam on the corner of Wood Street. The buildings share a short section of wall beyond the rear historic building line constructed of C20th brickwork. The modern floors on either side of this wall are at different heights resulting in damp penetration through to 32 Rother Street. This may also have been exacerbated by a water leak in the retail unit. It is proposed to remove the damaged modern gypsum plaster from one side of the part wall (32 Rother Street), remove the modern softwood skirting, inject a chemical dpc and re-plaster in water resistant render. A new skirting board with profile to match existing will be fitted.
The area considered by this application relates specifically to the party wall between 32 Rother Street and the retail unit currently occupied by Oxfam on the corner of Wood Street. The buildings share a short section of wall beyond the rear historic building line constructed of C20th brickwork. The modern floors on either side of this wall are at different heights resulting in damp penetration through to 32 Rother Street. This may also have been exacerbated by a water leak in the retail unit. It is proposed to remove the damaged modern gypsum plaster from one side of the part wall (32 Rother Street), remove the modern softwood skirting, inject a chemical dpc and re-plaster in water resistant render. A new skirting board with profile to match existing will be fitted.
Reference
17/01163/LBP
Ward
Guildhall
Parish
Stratford-upon-Avon
Agent
Hawkes, Edwards And Cave
Sign in to view all collected council fields and recorded changes.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.