ApprovedCouncil status: Variation Permitted with Conditions

Variation of condition 2 (time limit for cessation of use) of planning permission 15/00767/FUL (Installation of up to 27,480 solar panels supported on up to 409 module tables capable of generating up to 8.8 MWp of energy, together with associated equipment to include 9 inverter cabins, 4 communication cabins, switch gear housing, cabling, fencing, CCTV and connection to grid) to increase time limit from 29.06.2040 to 29.06.2050 together with revised wording of condition as detailed within the supporting letter.

Fields Farm Station Road Southam CV47 2DH

Stratford-on-Avon District CouncilReference 16/02903/VARYRemoval/Variation of Conds.of Prev. Perm

Last published check: 13 Oct 2026, 08:10. Check the council record for more recent changes.

Status and dates

Last published check: 13 Oct 2026, 08:10 (UK)

  1. DoneReceived2 Sept 2016
  2. DoneValidated6 Sept 2016
  3. Not publishedConsultationNo date on council record
  4. Not publishedTarget decision dateNo date on council record
  5. DecidedVariation Permitted with Conditions6 Dec 2016

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (6)
  1. applicationReceivedDate

    Published milestoneCouncil source
  2. applicationValidDate

    Published milestoneCouncil source
  3. standardConsultationExpiryDate

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. overallExpiryDate

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. dateDecisionIssued

    Published milestoneCouncil source
  6. targetDeterminationDate

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Removal/Variation of Conds.of Prev. Perm
Ward
Southam South
Parish
Southam
Documents
23 published

Proposal

Variation of condition 2 (time limit for cessation of use) of planning permission 15/00767/FUL (Installation of up to 27,480 solar panels supported on up to 409 module tables capable of generating up to 8.8 MWp of energy, together with associated equipment to include 9 inverter cabins, 4 communication cabins, switch gear housing, cabling, fencing, CCTV and connection to grid) to increase time limit from 29.06.2040 to 29.06.2050 together with revised wording of condition as detailed within the supporting letter.

Reference
16/02903/VARY
Ward
Southam South
Parish
Southam
Agent
Mr James Jenkison

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • Fields Farm Location PlanCouncil document6 Sept 2016View
  • Application FormCouncil document6 Sept 2016View
  • Fields Farm Cover LetterCouncil document6 Sept 2016View
  • WCC FRM PlanningCouncil document28 Sept 2016View
  • NATS SafeguardingCouncil document29 Sept 2016View
  • Natural EnglandCouncil document29 Sept 2016View
  • WCC Rights of WayCouncil document3 Oct 2016View
  • Warwickshire RamblersCouncil document4 Oct 2016View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Variation Permitted with Conditions
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.