Awaiting decisionCouncil status: Registered

Proposed external Air Source Heat Pump, additional hard standing area to the side garden, timber sleeper bumper to the canal side finger dock opening with mesh debris screen, 2 no electric push pad door switches to the front elevation, manifestation details to the main entrance screen and both finger dock windows, Internal insulated wall lining to front and side walls at ground floor, Platform stairlift to the main staircase, first floor pocket door, drop down access hatch with ladder

Canal & River Trust Yard Church Street Marple Stockport SK6 6BN

Stockport Metropolitan Borough CouncilReference DC/099898Listed Building Consent

Last published check: 30 Oct 2026, 00:12. Check the council record for more recent changes.

Status and dates

Last published check: 30 Oct 2026, 00:12 (UK)

13days until target decision date10 Dec 2026

  1. DoneReceived12 Aug 2026
  2. DoneValidated15 Oct 2026
  3. ClosedConsultationEnded 13 Nov 2026
  4. Next date · in 13 daysTarget decision date10 Dec 2026
  5. Not yet publishedDecisionNo decision on council record

Dates come from the council record. A target date passing does not confirm a decision.

All published dates (9)
  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Last Advertised In Press Date

    Published milestoneCouncil source
  4. Last Site Notice Posted Date

    Published milestoneCouncil source
  5. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  6. Neighbour Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  7. Latest Advertisement Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  8. Latest Site Notice Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  9. Determination Deadline

    Published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
Application type
Listed Building Consent
Ward
Marple South & High Lane(Marp)
Documents
27 published

Proposal

Proposed external Air Source Heat Pump, additional hard standing area to the side garden, timber sleeper bumper to the canal side finger dock opening with mesh debris screen, 2 no electric push pad door switches to the front elevation, manifestation details to the main entrance screen and both finger dock windows, Internal insulated wall lining to front and side walls at ground floor, Platform stairlift to the main staircase, first floor pocket door, drop down access hatch with ladder

Reference
DC/099898
Alternative references
PP-15075328
Ward
Marple South & High Lane(Marp)
Agent
Edifice Building Consultants Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents

  • PRESS NOTICENotice28 Oct 2026View
  • HERITAGE IMPACT ASSESSMENTReport15 Oct 2026View
  • CONSERVATION MANAGEMENT PLANReport9 Oct 2026View
  • COVERING LETTERReport8 Sept 2026View
  • APPLICATIONFORMREDACTEDApplicationNoPersonalData12 Aug 2026View
  • LOCATION PLAN1250 Plan12 Aug 2026View
  • PROPOSED SECTION CCPlan12 Aug 2026View
  • PROPOSED SECTION DDPlan12 Aug 2026View

Documents open on the council website. Browse council documents if a link has changed.

Decision and conditions

Decision not yet published

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.